• Title/Summary/Keyword: Risk management plan

Search Result 572, Processing Time 0.033 seconds

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

The Effectiveness Validation of Psychosocial Risk Management Plans in an Organizational Working Environment Using Logistic Regression Analysis (로지스틱 회귀분석을 이용한 조직 근로환경에서의 심리사회적 위험관리 방안의 효과 검증)

  • Kim, Soo-Yun;Han, Seung-Jo;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.2
    • /
    • pp.78-84
    • /
    • 2021
  • In addition to physical risks such as electrical, chemical, and mechanic ones in the workplace, psychosocial risks are also raising as an important issue in recent years in connection with human rights and work-life balance policies. The purpose of this study is to confirm the degree of effect of the psychosocial risk management plan at the workplace on workers through logistic regression analysis. Input data for logistic regression analysis is the results of a survey of 4,558 people conducted by the Institute for Occupational Safety and Health were used. There are 9 independent variables, including the change a workplace and confidential counseling, and the dependent variable is whether the worker feels the effect on the psychosocial risk management plan. As a result of this study, changes in work organization, dispute resolution procedures, provision of education program, notification of the impact of psychosocial risks on safety and health, and the persons in charge of solving psychosocial problems are shown effective in reducing worker's psychosocial risks. This study drives which of the management plans implemented to reduce the psychosocial risk of workers in the workplace are effective, so it can contribute to the development of psychosocial risk management plans in the future.

Systems Engineering Plan for the Development of Ultra-High-Speed Maglev Train System (초고속 자기부상철도 개발을 위한 시스템엔지니어링 계획서)

  • Lee, Young-Hoon;Min, Sung-Ki
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.21-32
    • /
    • 2009
  • The systems engineering (SE) process shall be applied to the project for successful development of ultra-high-speed (UHS) Maglev train system which is one of very large and complex systems. It is important to abolish technology differentials from the advanced developers such as Germany, Japan, etc. and to ensure discriminatory competitiveness of the application of systems engineering process for the development of the system based on appropriate concepts and requirements. General operation concept and stakeholder's requirements of UHS Maglev train system must be elicited with system concept for initiating the project. The management plan should be devised for all sorts of systems engineering activities of risk management, performance management, lifecycle cost management, etc. This paper would support to establish the systems engineering management plan (SEMP) for the program of UHS Maglev train system development with associated documents.

  • PDF

Improvement Plan and Analysis of Construction Safety Management for Risk Management (리스크관리에 의한 건설안전관리의 분석 및 발전방안)

  • Chung, Byoung-Hwa;Kim, Sung-Deuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.53-60
    • /
    • 2006
  • Quality control and safety represent increasingly important concerns for project managers. In the worst case, failures may cause personal injuries or fatalities. Accidents during the construction process can similarly result in personal injuries and large costs. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

A Study on the Improvement of the Management System of Rockfall Risk Area Using the Rockfall Analysis Program (낙석 해석 프로그램을 이용한 낙석위험지역 관리체계 개선 방안에 대한 연구)

  • Bae Dong Kang;Jae Chae Jeong;Chang Deok Jang;Kye Won Jun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.4
    • /
    • pp.79-86
    • /
    • 2022
  • The National Park Service is making efforts to create a safe environment by installing rockfall prevention facilities (rockfall prevention nets, fences, and Piam tunnels) in areas at risk of falling rocks. However, the occurrence of falling rocks is increasing every year due to torrential rains caused by climate change, abnormal temperatures in winter, and aging of the ground, and the need to improve the existing rock risk area management plan has emerged. In this study, a pilot area at risk of falling rocks was selected for the Hwanggol district of Chiaksan National Park among Korean national parks, and rockfall analysis was performed using the Rockfall program, and monitoring was conducted by applying a countermeasure method combined with the measurement system to the pilot area. Through this, a rockfall management plan was proposed for continuous management and monitoring of rockfall.

A Basic Study on the Railway Safety Management Based on Risk Assessment Approach (위험도 평가기법을 적용한 철도시스템의 안전관리)

  • Kim Sang Am;Wang Jong Bae;Kwak Sang Log;Lee Dong Ha
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.223-228
    • /
    • 2003
  • Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.

  • PDF

A Rectifying Inspection Plan Giving LTPD Protection for Destructive Testing (파괴검사시(破壞檢査時)의 계수선별형(計數選別型) LTPD 보증(保證)샘플링 검사방식(檢査方式))

  • Yu, Mun-Chan
    • Journal of Korean Society for Quality Management
    • /
    • v.15 no.1
    • /
    • pp.68-75
    • /
    • 1987
  • A rectifying inspection plan is considered for the case of destructive testing. Screening inspection for rejected lots is performed by some nondestructive testing which is prone to misclassification errors. Apparent defectives found in the screening process is replaced with apparent good items. The plan provides LTPD protection on each individual lot while the sum of the cost of testing and the cost due to producer's risk at process average quality is minimized. A brief discussion on average outgoing quality is also given.

  • PDF

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

Application of Risk Management to Forecasting Transportation Demand by Delphi Technique (Delphi기법을 통한 교통수요예측 Risk Management 적용 방안)

  • Chung, Sung-Bong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.267-273
    • /
    • 2011
  • Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.

A Study on the Improvement of Safety Management at the Construction Stage using Design for Safety Results - Focusing on the Connection between Design for Safety and Safety Management Plan (설계 안전성 검토 결과를 활용한 시공단계 안전관리 업무 개선 - 설계 안전성 검토와 안전관리계획의 연계를 중심으로)

  • Lee, Goon Jae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.54-60
    • /
    • 2020
  • Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.