• Title/Summary/Keyword: Risk management plan

Search Result 575, Processing Time 0.022 seconds

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

A Study on Factory Building Fire Risk Reduction Management (공장건물의 화재리스크 경감방안에 관한 연구)

  • Chung, Eui-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.43-53
    • /
    • 2008
  • This study is carried out for the fire safety of the factory building, the fire risk reduction measure in compliance with an example approached in fire risk reduction systematically, contribute to reduce the fire risk. The analytical fire risk process of discovering, identifying, estimating and evaluating risk and control measure as risk reduction measures are core concept, applies loss prevention with loss control techniques. The painting process in the workplace where the fire hazard and death accident accompanies coexists. Loss prevention problem of creation prevention of dangerous atmosphere at workplace is health and human services problem of normal circumstances, must be inspected with problem of combustible gases at the time of fire explosion. Static electricity measure accomplished the risk control process thoroughly as the fire risk reduction process model with the ignition sources measure which is presented. Fire risk from within organizing will be able to classify with each field by detailedly but risk treatment process will be able to apply basically all the same concept. Consequently about risk management example from before, this study is proposed risk management techniques that standardized rightly in the actual condition of organization with one plan, with discovery of fire risk, the feedback process in compliance with a fire risk reduction and the review which control the result is joint responsibility of engineer, technical expert and manager as part of safety management to practice with the fact must be supervised.

Development of a Supporting Program for the Emergency Preparedness Plan (사고대비물질 취급자의 비상대응계획 작성 프로그램 연구)

  • Kim, Sung-Bum;Noh, Hye-Ran;Seok, Gwang-Seol;Park, Jae-Deuk
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.5
    • /
    • pp.54-58
    • /
    • 2011
  • Emergency preparedness plan(EPP) is the systematic management of activities that involve a material degree of risk of loss or other damage to the surroundings(people, property and environment), and the boundary of accident recovery plan(ARP). The main purpose of the program is to provide a safety management system to each facility in order to enable to prevent accident and to control accident immediately. The EPP includes not only typical safety-related documentations such as material safety data sheet(MSDS), standard operation procedure(SOP), emergency response plan(ERP). EPP is established basis of the preliminary safety analysis involving risk identification, assessment and prevention plans. The program is also helpful for government or related agencies to control a number of accidents in small-scale companies in the whole country.

A Study on Improving Korea's Regulatory System for Pharmaceutical Safety Management (의약품 안전성 관리를 위한 연구 - 의약품 안전관리 제도개선 방안을 중심으로 -)

  • Chae, Gyu Han;Cho, Gi Won;Nagata, Ryuji;Park, Ji Sun;Hong, Chong Hui;Kang, Jong Seong
    • YAKHAK HOEJI
    • /
    • v.57 no.3
    • /
    • pp.173-186
    • /
    • 2013
  • To ensure the safe use of pharmaceuticals in the market, US, EU and Japan reached a consensus to adopt ICH harmonised tripartite guideline "E2E Pharmacovigilance Planning" in 2004. Subsequently these regions established and implemented new pharmaceutical safety management systems for patients based on ICH E2E guideline and Risk Evaluation and Mitigation Strategy (REMS) in US or Risk Management Plan (RMP) in EU and Japan. In this study we investigated these new foreign systems and suggested a way to improve Korea's regulatory system for pharmaceutical safety management under Korea Pharmaceutical Law in the view of international harmonization.

Microbial Risk Assessment and HACCP Plan for the Safe Production of Dry Aged Meat (안전한 건식 숙성육 제조를 위한 미생물 위해평가 및 HACCP 적용 방안)

  • Oh, Hyemin;Lee, Hyun Jung;Jo, Cheorun;Yoon, Yohan
    • Journal of the FoodService Safety
    • /
    • v.3 no.1
    • /
    • pp.8-18
    • /
    • 2022
  • Dry-aging is one of the traditional aging processes, especially for beef. This aging process is being popular, because it produces unique brown/roasted flavor and texture that consumers prefer. However, as it is exposed to outside without packaging food safety concerns have been raised. The objective of this study was to investigate the presence of total aerobic bacteria (TAB) and pathogenic bacteria in manufacturing environment and suggest the safety management plan for the production of dry-aged meat. Surface samples from 66 environmental and 6 beef carcass samples were collected. According to the monitoring results, the contamination levels of TAB were in the order of shelves (5.4±1.1 Log CFU/cm2), cotton gloves (2.9±0.2 Log CFU/cm2), and door knobs (2.8±0.4 Log CFU/cm2) in the dry-aging room. In the door knobs, the level of mold was higher than that of yeast. These results indicate that the mold spores may be cross-contaminated with environmental factors inside the aging room. The risk factors that may occur during the manufacturing process were presented and possibility of risk was determined. From the aspect of microbiology, aging and trimming steps were determined as the critical control points. The temperature of the aging room should be maintained below 10℃ and the humidity below 75-85%. Based on the monitoring and the risk assessment of the dry-aging process, we prepared the safety management plan for the production of dry-aged meat, and it should be useful in improving the food safety of dry-aged meat.

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

A Study on Intellgence Emergency Guide Line System (지능형 피난유도선 시스템에 대한 연구)

  • Park, Yong-Gyu;Kim, Suk-Eun;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.107-116
    • /
    • 2010
  • Government and company are unfolding greenhouse gas reduction activity to prevent the effects of global warming. Also, verification business through greenhouse gas inventory construction is spreaded variously. Greenhouse gas verification proceeds by document examination, risk analysis, field survey. Document investigates emission information, calculation standard, emission report, data management system. And through risk assessment result, establish field verification plan. Through study on risk assessment of greenhouse gas inventory verification, wish to reduce risk of verification.

  • PDF

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Introduction of the STPA Mechanism to Derivation of Risk Scenarios for Establishment of Disaster Reduction Activity Plans (재해경감활동계획 수립에 위험 시나리오 도출을 위한 STPA기법 도입)

  • Kim, Sang Duk;Lee, Seok Hyung;Kim, Chang Soo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.784-795
    • /
    • 2020
  • Purpose: This study intends to review the risk assessment procedures specified in the corporate disaster management standard. Method: The requirements for each stage of risk assessment stipulated in the corporate disaster management standard were identified, the case of application of the organization'A' and the partner companies were reviewed, and the risk assessment procedure in line with the requirements was reviewed. Result: It was reviewed that it was necessary to clearly define the method and procedure for deriving risk scenarios, which are the requirements of the corporate disaster management standard, and to introduce a standardized procedure for deriving risk scenarios. Conclusion: A method of deriving risk scenarios was implemented by applying the STPA technique based on the system theory for power generation fuel supply and demand, and it was suggested that the STPA technique be reflected in corporate disaster management standards as a risk scenario derivation technique for the establishment of a disaster reduction activity plan.