• Title/Summary/Keyword: Risk evaluation and mitigation

Search Result 55, Processing Time 0.022 seconds

Evaluation System of Environmental Safety on Marine Geological Sequestration of Captured Carbon Dioxide (이산화탄소의 해양지중저장과 환경 안전성 평가 방안)

  • Gim, Byeong-Mo;Choi, Tae Seob;Lee, Jung-Suk;Park, Young-Gyu;Kang, Seong-Gil;Jeon, Ei-Chan
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.1
    • /
    • pp.42-52
    • /
    • 2013
  • Carbon Capture and Storage (CCS) is a mitigation technology essential in tackling global climate change. In Korea, many research projects are aimed to commercialize CCS business around 2020. Public acceptance can be a key factor to affect the successful proceeds of CCS near future. Therefore this paper provides a concise insight into the application of environmental impact assessment and risk assessment procedures to support the sustainable CCS projects. Futhermore, bottlenecks regarding the environmental impacts assessment and related domestic and foreign legislation are revised. Finally, suggestions to overcome these bottlenecks and recommendations for future research are made in conclusion.

The use of SMA wire dampers to enhance the seismic performance of two historical Islamic minarets

  • El-Attar, Adel;Saleh, Ahmed;El-Habbal, Islam;Zaghw, Abdel Hamid;Osman, Ashraf
    • Smart Structures and Systems
    • /
    • v.4 no.2
    • /
    • pp.221-232
    • /
    • 2008
  • This paper represents the final results of a research program sponsored by the European Commission through project WIND-CHIME ($\underline{W}$ide Range Non-$\underline{IN}$trusive $\underline{D}$evices toward $\underline{C}$onservation of $\underline{HI}$storical Monuments in the $\underline{ME}$diterranean Area), in which the possibility of using advanced seismic protection technologies to preserve historical monuments in the Mediterranean area is investigated. In the current research, the dynamic characteristics of two outstanding Mamluk-Style minarets, which similar minarets were reported to experience extensive damage during Dahshur 1992 earthquake, are investigated. The first minaret is the Qusun minaret (1337 A.D, 736 Hijri Date (H.D)) located in El-Suyuti cemetery on the southern side of the Salah El-Din citadel. The minaret is currently separated from the surrounding building and is directly resting on the ground (no vaults underneath). The total height of the minaret is 40.28 meters with a base rectangular shaft of about 5.42 ${\times}$ 5.20 m. The second minaret is the southern minaret of Al-Sultaniya (1340 A.D, 739 H.D). It is located about 30.0 meters from Qusun minaret, and it is now standing alone but it seems that it used to be attached to a huge unidentified structure. The style of the minaret and its size attribute it to the first half of the fourteenth century. The minaret total height is 36.69 meters and has a 4.48 ${\times}$ 4.48 m rectangular base. Field investigations were conducted to obtain: (a) geometrical description of the minarets, (b) material properties of the minarets' stones, and (c) soil conditions at the minarets' location. Ambient vibration tests were performed to determine the modal parameters of the minarets such as natural frequencies and mode shapes. A $1/16^{th}$ scale model of Qusun minaret was constructed at Cairo University Concrete Research Laboratory and tested under free vibration with and without SMA wire dampers. The contribution of SMA wire dampers to the structural damping coefficient was evaluated under different vertical loads and vibration amplitudes. Experimental results were used along with the field investigation data to develop a realistic 3-D finite element model that can be used for seismic risk evaluation of the minarets. Examining the updated finite element models under different seismic excitations indicated the vulnerability of such structures to earthquakes with medium to high a/v ratio. The use of SMA wire dampers was found feasible for reducing the seismic risk for this type of structures.

Evaluation of Levee Reliability by Applying Monte Carlo Simulation (Monte Carlo 기법에 의한 하천제방의 안정성 평가)

  • Jeon, Min Woo;Kim, Ji Sung;Han, Kun Yeun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5B
    • /
    • pp.501-509
    • /
    • 2006
  • The safety of levee that depends on the river flood elevation has been regarded as very important keys to build up various flood prevention systems. However, deterministic methods for computation of water surface profile cannot reflect the effect of possible inaccuracies in the input parameters. The purpose of this study is to develop a methodology of uncertainty computation of design flood level based on steady flow analysis and Monte Carlo simulation. This study addresses the uncertainty of water surface elevation by Manning's coefficients, design discharges, river cross sections and boundary condition. Monte Carlo simulation with the variations of these parameters is performed to quantify the variations of water surface elevations in a river. The proposed model has been applied to the Kumho-river. The reliability analysis was performed within 38.5 km (95 sections) reach considered the variations of the above-mentioned parameters. Overtopping risks were evaluated by comparing the elevations of the flood condition with the those of the levees. The results show that there is a necessity which will raise the levee elevation between 1 cm and 56 cm at 7 sections. The model can be used for preparing flood risk maps, flood forecasting systems and establishing flood disaster mitigation plans as well as complement of conventional levee design.

A Study of Policy Change on K-ETS and its Objective Conformity (한국 배출권거래제 정책 변동의 목적 부합성 연구)

  • Oh, Il-Young;Yoon, Young Chai
    • Journal of Climate Change Research
    • /
    • v.9 no.4
    • /
    • pp.325-342
    • /
    • 2018
  • The Korea Emissions Trading Scheme ( K-ETS), which manages roughly 70% of the greenhouse gas emissions in South Korea, was initiated in 2015, after implementation of its 1st basic plan and the 1st allocation plan (2014) for the 1st phase (2015-2017). During the three and a half years since the launch of K-ETS, there have been critical policy change such as adjustment of the institutions involved, development and revision of the 2030 national GHG reduction roadmap, and change in the allocation plans. Moreover, lack of liquidity and fluctuation of carbon prices in the K-ETS market during this period has forced the Korean government to adjust the flexibility mechanism and auction permits of the market stability reserve. To evaluate the policy change in the K-ETS regarding conformance to its objectives, this study defines three objectives (Environmental Effectiveness, Cost Effectiveness and Economic Efficiency) and ten indicators. Evaluation of Environmental Effectiveness of K-ETS suggests that the national GHG reduction roadmap, coverage of GHG emitters and credibility of MRV positively affect GHG mitigation. However, there was a negative policy change implemented in 2017 that weakened the emission cap during the 1st phase. In terms of the Cost Effectiveness, the K-ETS policies related to market management and flexibility mechanism (e.g. banking, borrowing and offsets) were improved to deal with the liquidity shortage and permit price increase, which were caused by policy uncertainty and conservative behavior of firms during 2016-2018. Regarding Economic Efficiency, K-ETS expands benchmark?based allocation and began auction-based allocation; nevertheless, free allocation is being applied to sectors with high carbon leakage risk during the 2nd phase (2018-2020). As a result, it is worth evaluating the K-ETS policies that have been developed with respect to the three main objectives of ETS, considering the trial?and?error approach that has been followed since 2015. This study suggests that K-ETS policy should be modified to strengthen the emission cap, stabilize the market, expand auction-based allocation and build K-ETS specified funds during the 3rd phase (2021-2025).

A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards (국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.233-248
    • /
    • 2017
  • Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.