In generally speaking, the purpose of Environmental Impact Assessment(EIA) is to give the environment its due place in the decision-making process by clearly ealuating the environmental consequence of a proposed activity before action is taken. The introduction of conventional EIA is to be seen as an end product of a very long evolutionary process, starting with rudimentary but evolving pollution control measures for air, water, noise, land and chemicals, each governed by separate, and separately administered pieces of legislation. In EIA process, the measures of status, scoping, proposed mitigation and communication have not been very quantitative in their significancy. Of course, the determinations have uncertainity in the implications for significant impacts. To improve the determination of significant impacts, some more comprehensive methodologies of EIA has been proposed with the concepts of risk analysis in the proposed projects. The concepts of risk analysis has been introduced to the expression of human health impairment due to environmental pollutants since the early 1980's. The risk analysis being meant by the statistical significance of impact has a process quantitatively considering uncertainities and importances of ecological systems and human health as well. The process of risk analysis shows assessment, doseresponse in toxicity, exposure assessment and risk characterization. With the risk assessment, it could be suggested for the proper measurements against their anticipated risk in the EIA. This paper deals the priciples developing process and application of the risk-based analysis in EIA.
Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.
The purpose of ecological risk assessment in soil ecosystem is to protect ecological receptors and to provide a scheme of efficient management for soil contaminants. Developed countries have already prepared the methodologies of ecological risk assessment by considering their soil properties, land use, and ecological receptors. In this study, we compared the soil ecological risk assessment processes in the similarity and differences in methodology. Four countries, except for USA, adjusted the toxicological data for ecological risk assessment, based on their representative soil properties because the soil properties affect toxic effects to ecological receptors. The soil ecological risk assessment methodology of Netherlands and UK was based on 'Technical guidance document on risk assessment (TGD)' of European Chemical Bureau (ECB). Australia, USA, and Canada developed their autonomous methodology. In the Netherlands, UK, Australia, and Canada, they employed the species sensitivity distribution (SSD) approach if sufficient toxicity data are available. The USA determined the ecological soil screening level by obtaining the geometric mean of toxicological data for three species. Furthermore, all countries consider secondary poisoning in their soil ecological risk assessment. The latest risk assessment methodology of soil ecosystem that this study investigated can be used to explore what Korea needs to develop the Korean ecological risk assessment methodology of soil ecosystem in the future.
Objective: This study aims to suggest different approaches in analyzing risks associated with musculoskeletal disorders (MSDS) for risk assessment. Background: Upon concluding that the changes in the industrial environments have made it hard to regulate diverse risk factors, the government has implemented a policy for risk assessment. Method: This study has proposed a method, creating programs using Excel that perform qualitative or quantitative analysis, for evaluating risk factors in risk assessments and has applied this in manufacture and service industries. Results: To verify the validity of the developed program, risk assessment has been performed on restaurant chefs as an example. For quantitative evaluation, the study has suggested approaches using the results for REBA evaluation and the analysis report on the work scenes of a fitting-shop in a shipbuilding industry. Application: Constructing and adapting a system using Excel in evaluating risk factors for risk assessments as this study suggests, is expected to contribute to revitalizing risk assessments.
Recently, failures of equipments are linked directly to extensive damages of human lives or financial losses from the increasing uses of train control equipments utilizing computers. Then safety activities have to progress for guaranteeing safety during the system life-cycle. In this paper, we examine the methods for risk analysis and assessment of safety activities and propose optimized one method for risk assessment. There are original risk assessment methods; risk graph and risk matrix method under the qualitative analysis, IRF(Individual Risk Formula) calculations and statistical calculations method under the quantitative analysis. Best-Practice(BP) risk analysis method is proposed for combining advantages of the qualitative and the quantitative analysis. In the comparison of risk graph and risk matrix method for safety estimation, BP method has no applications published up to now, but we can expect that this method will be utilized widely for the risk assessment due to various strong points.
Kim, Seung Won;Choi, Sangjun;Phee, Young Gyu;Kim, Kab Bae
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.25
no.4
/
pp.482-492
/
2015
Objectives: Exposure Assessment for workplace hazards where the exposure level is below occupational exposure limits(OELs) has been performed without considering either the degrees of risk or exposure levels and has failed to lead to intervention in many cases. The objective of this study was to suggest and test an application framework for risk assessment methodology under the current exposure assessment system in Korea. Materials: First, we investigated the exposure assessment systems in Korea and other countries. To adopt some risk assessment techniques, we also analyzed risk assessment systems and compared them to exposure assessment systems. A few suggestions were made. We held a public hearing during an industrial hygiene conference and took surveys using a questionnaire. Results: The first suggestion was to implement the risk assessment and exposure assessment through a "one-stop" system. In that case, one expected question would be who has been doing the jobs so far. In most cases, industrial hygiene consulting services or laboratories have been performing exposure assessment for business owners. Business owners are required to perform risk assessment. As two different groups of people will be required to implement two things in a one-stop system, they need to share information. As an information vehicle to share information, commonly filed survey checklists were suggested. The second suggestion was to categorize exposure level into four groups instead of the current binary divisions based on OELs. In the risk assessment system, exposure level is divided into four groups utilizing the cut-points of 10%, 50%, and 100% of OELs. The same schema can be adopted in the exposure assessment system and different levels of requirements can be assigned for each group. The third suggestion was regarding the regulation system. To provide the suggestions some thrust toward being implemented in the field, changes should be made in the legal system. Two different types of new exposure assessment result reporting forms were suggested. Some investigations such as an ergonomic survey are officially accepted as risk assessment under the current legal system. A few items were suggested to be included in the exposure assessment result reporting to be accepted as risk assessment. A pilot study in two small factories was performed and pointed out the strengths and weakness of our suggestions. Conclusions: Discussions and studies on the improvement of the exposure assessment system have been held for decades and no tangible changes have yet been made. We hope this result can help realize healthy lives for workers in Korea.
Woo, Darae;Choi, Eunmi;Choe, Young June;Yeh, Jungyong;Park, Sangshin
Health Policy and Management
/
v.32
no.4
/
pp.356-367
/
2022
Background: The emergence of new infectious diseases threatens public health, increasing socioeconomic damage, and national risks. This study aimed to develop an evidence-based risk assessment tool to quickly respond to new infectious diseases. Methods: The risk elements were extracted by reviewing the risk assessment methods of the World Health Organization, United States, Europe, United Kingdom, and Germany, and the validity and priority of elements were determined through expert meetings and Delphi surveys. Then, the scale and level for each risk element were defined and a final score calculation method according to the risk evaluation result was derived. The developed risk assessment tool was verified using data at the time of domestic transmission of an emerging infectious disease. Results: In case of spread of actual infectious diseases, priority is determined based on the criticality of the elements in each area of transmissibility and severity, from which the weighted score of the risk assessment is derived. Then, the risk score for each element was calculated by multiplying the average value of the risk evaluation by its weight and the evaluation risk assessment score for the two areas was calculated. At last, the final score is plotted in a matrix where the x-axis indicates the transmissibility and the y-axis the severity and plotted on the coordinate plane for time series use. Conclusion: With respect to transmissibility and severity, this risk assessment method to respond to new and re-emerging infectious diseases enables rapid and evidence-based evaluation by quantitatively and qualitatively assessing various risk elements.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.