Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.
This paper shows the case study of risk analysis in an weapon system research and development project. For risk analysis, an advanced stochastic networking technique-VERT (Venture Evaluation and Review Technique) is used. Assumptions for activities of network diagram and conversion methods from PERT ( Program Evaluation and Review Technique) to VERT are discussed. Also, simulation result is presented and discussed.
현재 건설공사에서 위험관리의 중요성이 점차 부각되고 있음에도 불구하고 건설현장의 위험관리는 매우 미흡한 수준이다. 이러한 원인중 하나가 위험인지 및 분석에 적용하고 있는 각 기법들에 대한 기준이 정립되어 있지 않아, 위험관리의 현장 적용성이 매우 낮은데 있다. 본 연구는 건설현장의 위험관리를 보다 성공적으로 수행하기 위하여 위험관리 전체 프로세스중 위험인지 및 분석단계에 적용하는 기법들을 프로젝트 상황에 따라 최적화시켜 위험관리 기법 적용의 편의성을 향상시키는데 목적이 있다. 그러기 위하여 프로젝트의 상황을 자료의 충분여부, 전문가의 보유여부, 분석시간의 충분여부로 구분하고, 다양하게 제안된 위험인지 및 분석단계의 기법들을 정리한 후 기법별로 그 특징을 파악하여, 위의 세 가지 상황에 적용함으로써 건설공사 위험관리 기법의 프로젝트 상황별 적용기준을 정립하였다.
A successful fire risk assessment is depends on identification of risk, the analytical process of potential risk, on estimation of likelihood and the width and depth of consequence. Take the influence on enterprise into consideration, Fire risk assessment could carry out along the evaluation of the risk importance, the risk level and the risk acceptance. A large part of the limitation of choosing the risk assessment techniques impose restrictions on expense and time. If it is unnecessary high level risk assessment or Probabilistic Risk Assessment of buildings, in compliance with the Relative Ranking Method, Fire risk indexing and assessing is possible. As working-level technique, AHP method is useful with practical technique.
최근 들어 건설환경이 더욱 복잡해지고 경쟁이 치열해짐에 따라 위험관리의 중요성이 더욱 부각되고 있다. 그러나 건설공사에 적용되는 대부분의 위험관리 기법들이 사업초기단계에서 위험분석에 집중되어 있어, 건설과정에서 공정관리, 원가관리 또는 품질관리처럼 일상적인 관리기법으로 개발되어 있지 않다. 본 논문에서는 건설공사에서 위험관리를 일상적인 관리기법으로 적용하기 위하여 위험허용도 중심의 위험대응 프로세스를 제안하고, VaR개념을 응용한 위험허용도 산정방법을 제시하고자 한다.
Free from the industrial accident is the goal from top manager to foreman. Therefore all the company try to prevent occupational accident using system safety program in order to increase productivity Korean industries have been tend to depending upon historical information to control risk. The other hand, foreign industries have been Identify risk factors using system safety techniques to predict future risk. Therefore, this study is presented to applying the foreign industries's risk control technique to korean industries.
연구목적: 본 연구는 기업재난관리표준에 규정하고 있는 위험평가 절차에 대하여 연구하고자 한다. 연구방법: 기업재난관리표준에 정하고 있는 위험평가 단계별 요구사항을 파악하고, 'A'기관과 협력사의 적용사례를 검토하였으며 요구사항에 맞는 위험평가 절차를 도출하였다. 연구결과:기업재난관리표준의 요구사항인 위험 시나리오 도출 방법과 절차에 대하여 명확히 정의하고, 위험 시나리오 도출을 위한 표준화된 절차 도입이 필요한 것으로 검토되었다. 결론:발전 연료수급업무에 대하여 시스템 이론에 기반한 STPA 기법을 적용하여 위험 시나리오를 도출하는 방법을 구현하였으며, 모든분야의 핵심업무에 대한 위험 시나리오 도출에 적용할 수 있도록, STPA 기법을 재해경감활동계획 수립을 위한 위험 시나리오 도출 기법으로 기업재난관리표준에 반영할 것을 제시하였다.
Management of risks is critical issue in the project management and it is important to ensure that risk management is done in a sensible way. Risk analysis is an activity geared towards risk mitigation in risk management technique. Many techniques to manage, analyze and reduce risks have been done previously but only few have addressed the design analysis to reduce risk and none have attempted to analyze architecture to manage risks. In this paper we try to find a solution through various analyzing various software architectural design concepts. We follow Pressman's method of analyzing architecture design, and then alter it to identify risks which are used in risk analysis process further in risk management process. The risks assessed are analyzed later in the risk management cycle.
The RBI technique proposed by API is composed of three steps. The qualitative RBI method can be used for the purpose of screening the components with high risk. And the quantitative RBI method employs complex risk evaluation model for predicting component risk in a quantitative manner. The inspection program can be optimized based on the results obtained by these RBI technique. The forementioned RBI technique has been applied to a common hydrodesulfurizer unit and the technique is critically evaluated for studying its benefits and limitations, which is the main issue of this thesis. It's conducted that the RBI method can provide a method for defining and measuring the component risk, and also provide a powerful tool for managing many of the important elements of a process plant.
최근 국내에서 대두되고 있는 도시재생 개발사업은 신도시 및 기존 시가지를 중심으로 공공기관의 주도하에 이루어지고 있다. 이러한 개발사업들은 사전 평가 단계에서의 위험요인 관리가 사업의 성공과 부가가치 창출에 중요한 요인임에도 불구하고 안전관리 수준에서 머물고 있다. 이는 위험요인들을 분석할 수 있는 다양한 위험 분석 기법들에 대한 부정확한 이해 및 그 중요도를 파악하지 못하고 있으며, 단계별 적절한 분석 기법의 적용이 미흡하기 때문이다. 따라서 본 연구에서는 개발 사업에 대한 전반적인 이해와 개발 사업 사전평가 단계에서의 구성 및 정의, 사전평가 단계에서 적용될 수 있는 위험분석기법들에 대한 정의 및 분석을 통해 사전평가 단계에서 나타날 수 있는 다양한 위험요인들을 보다 효과적으로 관리할 수 있는 위험분석기법들을 마련하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.