• Title/Summary/Keyword: Risk Management Process

Search Result 1,201, Processing Time 0.025 seconds

The Factors Affecting the Implementation of Risk Management Systems: The Case of ALM Systems (국내 금융기관의 위험관리시스템 도입에 영향을 미치는 요인: ALM시스템을 중심으로)

  • Hahm, Yu-Kun
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.211-227
    • /
    • 1998
  • The process of implementing risk management systems for the organizations in financial service industry can be viewed as a diffusion of innovation since the introduction of the risk management systems changes the decision making process on risks faced by the organizations. The purpose of the reported research is to examine the factors that affect the successful implementation of ALM(asset & liability management) systems, the risk management systems managing interest rate risk. Specifically, this paper presents an investigation of three factors from the diffusion of innovation studies; internal factors, external factors, and time. A field survey was conducted for Korean banks that have implemented ALM systems. The results suggest that the perceived uncertainty of market, system supports, and management supports be most significantly related to the successful implementation of the risk management systems. The findings of the current study also suggest a certain amount of time should be passed to diffuse the risk management systems in organizations.

  • PDF

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

Development and Distribution of Risk Governance Framework in Terms of Socially Viable Solutions

  • Choi, Choongik;Choi, Junho
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.5 no.3
    • /
    • pp.185-193
    • /
    • 2018
  • This paper aims to explore the risk governance framework and socially viable solutions, attempting to provide guidance for the decision making process. The key idea of this study start with overcoming the limitations of IRGC risk governance framework, which mainly focuses on a comprehensive framework for risk governance. This article has employed SWOT analysis as a methodology, which is a strategic planning technique used to help identifying the strengths, weaknesses, opportunities, and threats related to business competition or risk management. In this paper, socially viable solutions as an alternative plan place emphasis on the adoption of concern assessment through a concerns table. It is also proposed that scoping has to get introduced, with SWOT analysis in the process. The results of this paper support that multiple stakeholders have to participate in the process of identifying and framing risk and communicating with each other, considering the context. It should be noted that communities can become involved and take important parts in decision making process in various ways. It is recommended that engaging stakeholders to both risk assessment and risk management is material to dealing with risk in a socially viable way. It also implies that the community-based disaster management should be better prepared for the decision making process in socially viable solutions.

Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques (P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석)

  • 정병화;정영식
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

The Problems and Improvements of Process to Predict Fire Risk of a Building in Performance Based Design (성능위주설계에서 화재위험성 예측 과정의 문제점 및 개선방안)

  • Lee, Se-Myeoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.145-154
    • /
    • 2014
  • Performance based design(PBD) is the method to make a fire safety design against them after predicting the factors of fire risk in a building. Therefore, predicting fire risk in a building is very important process in PBD. For predicting fire risk of a building, an engineer of PBD must consider various factors such as ignition location, ignition point, ignition source, first ignited item, second ignited item, flash over, the state of door and fire suppression system. But, it is difficult to trust fire safety capacity of the design because the process in Korea' PBD is unprofessional and unreasonable. This paper had surveyed some cases of PBD that had been made in Korea to find the problems of the process to predict fire risk. And it have proposed the improvements of process to predict fire risk of a building.

Clinical Preventive Dental and Dental Hygiene Practice by Caries Management by Risk Assessment (CAMBRA) (Caries Management by Risk Assessment (CAMBRA) 모형에 따른 임상 예방치과 및 치위생 진료)

  • Cho, Young-Sik
    • Journal of dental hygiene science
    • /
    • v.12 no.6
    • /
    • pp.545-557
    • /
    • 2012
  • Dental caries is biofilm induced disease throughout life and is recognized significant oral health problem. This article reviewed new trends in dental caries management by risk assessment, including history, protocol/guideline, and collaborated model. Dental caries prevention and treatment according to caries management by risk assessment (CAMBRA) model is patient-centered, risk-based, evidence-based practice. Team approach is necessary and clinician need to integrate science, practice and product. Dental hygienist take a important role in implementing CAMBRA. CAMBRA model could be incorporated into clinical dental hygiene education based on dental hygiene process of care as standard of dental hygiene practice and education. Dentist and dental hygienist able to provide scientific and ethical care managing dental caries by risk assessment.

The Effect of Project Risk and Risk Management on Software Development Project Performance (프로젝트 위험과 위험관리가 소프트웨어 개발 프로젝트 성과에 미치는 영향)

  • Suh, Chang-Kyo;Jeong, Eun-Hee
    • Asia pacific journal of information systems
    • /
    • v.13 no.2
    • /
    • pp.199-217
    • /
    • 2003
  • Based on the IS literature on software project risk management, we developed an integrated model to investigate the risk factors and risk management factors in project development. We also analyzed the interrelation between project risk and project risk management. The questionaries are collected from 83 project leaders. We tested reliability and validity of the measure and analyzed the obtained data. The results support our risk-based hypothesis that shows the importance of risk management in reducing project risks and improving performance of project and process.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

A Fundamental Concept of Risk-Based Thinking and Risk Management for ISO 9001:2015 Certification (ISO 9001:2015 인증을 위한 리스크 기반 사고의 개념과 리스크 관리)

  • Kim, Ho Gyun;Kang, Byung Hwan;Park, Dong Joon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.3
    • /
    • pp.38-48
    • /
    • 2017
  • ISO 9001 Quality Management Systems-Requirements has been revised in 2015. It has been updated four times since its publication in 1987. It is the most widely used International Standard in the world. There are over one million companies and organizations in over 170 countries certified to ISO 9001 from an ISO survey. Organizations are supposed to be certified to this new version by late 2018. The key changes in ISO 9001:2015 are to establish a High Level Structure (HLS) and focus on Risk-Based Thinking (RBT). Risk-Based Thinking means the process approach to decide how risk is addressed in establishing the processes to improve process outputs and prevent undesirable results. It pursues process planning and controls based on risks so that organizations can improve the effectiveness of the quality management system. It maintains and manages a Quality Management System that inherently addresses risks and meets objectives. In this article we firstly attempt to explain how to understand the fundamental concept of Risk-Based Thinking which is a systematic approach to consider risks rather than treating prevention as a separate component of a Quality Management System. We comment on the detailed requirements that contain risks in ISO 9001:2015 clauses. We also summarize recent advances on the risk assessment and management in line with ISO 31000:2009 Risk Management-Principles and Guidelines. We finally propose the practical risk management procedures for implementing ISO 9001:2015 with an emphasis on RBT. This article would contribute to help quality managers and practitioners convert to ISO 9001:2015.

A Study on the Fire Risk Assessment : Based on the Proposal of a Fire Risk Assessment Processor Considering the Reality in Korea (화재위험도 평가에 대한 연구 : 국내 현실을 고려한 화재위험도 평가 프로세서 제안을 중심으로)

  • Lee, Jong Hwa
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2021
  • Recently, advanced countries assessment the risk of fire to prevent large-scale damage to high-rise buildings, In addition, performance-Based design, which is a fire risk assessment, is being conducted in Korea to prevent massive damage to high-rise buildings. However, unlike advanced countries, fire risk assessment in Korea is subject to fire risk assessment only for objects subject to consent from fire-fighting facilities such as building permits, When building engineers and fire-fighting engineers assessment the risk of fire, It has always been discussed because the results vary depending on which part of the evaluation is focused between economic feasibility and safety. Therefore, in this study, we would like to propose a fire risk assessment process suitable for domestic conditions by comparing the process of performance-based design, which is a domestic fire risk assessment, and the process of Iso/TC 16732 which is an overseas fire risk assessment.