• 제목/요약/키워드: Risk Level Assessment

검색결과 1,145건 처리시간 0.028초

AMEA을 활용한 위험성평가 방법 (The method of risk assessment by AMEA)

  • 김건호;권상면;이강복;김윤성;이재원;강경식
    • 대한안전경영과학회지
    • /
    • 제9권2호
    • /
    • pp.97-111
    • /
    • 2007
  • In risk assessment, there are several methods such as Safety Review, Checklist, FMEA(Failure Mode and Effect Analysis), FTA(Fault Tree Analysis), ETA (Event Tree Analysis) etc, however, the level of accident is indentified by the probability of accident and severity resulting from accident which used widely in assessing accidents and disasters. In this paper, the risk assessment method to decide the level of risk will be introduced by using severity, frequency and detection according to accident theory.

철도건널목 사고 위험도-발생빈도 평가모델 개발 (Development of Risk-Appearance Frequency Evaluation Model for Railway Level-Crossing Accidents)

  • 김민수;왕종배;박찬우;최돈범
    • 한국안전학회지
    • /
    • 제24권3호
    • /
    • pp.96-101
    • /
    • 2009
  • In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.

높이 20미터 미만인 구조물의 낙뢰리스크 평가 (Lightning Risk Assessment for Structures Lower than 20m High)

  • 이주철;김기현;이영철
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.21-27
    • /
    • 2012
  • Korean Industrial Standards for lightning protection system complies with IEC standards. However, the standards are applicable only to buildings and structures more than 20 meters in high. Therefore, it is necessary to determine whether lightning protection system should be installed on structures lower than 20 meters high. This paper proposes an efficient method of assessing risk against lightning of structures lower than 20 meters high. The method suggests simplified lightning protection system and provides selecting an appropriate protection level. The suggested method assumes that structure under assessment has no lightning protection system and there is no person around the structure at the moment of lightning stroke. A simplified method of assessing the risk to human within the structure is developed by adopting the general assessment factor. The selection of a protection level is possible by comparing tolerable risk with physical damage risk caused by a direct lightning. Finally, this paper gives ways to establish surge protection measures when a structure with lightning risk is within a radius of 2km from the assessed structure even if this structure requires no lightning protection system.

공동주택 건축공사 단위작업의 위험성 평가 방법 (Risk Assessment Method for Activities of Apartment Construction)

  • 박성표;최재욱;이찬식
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로- (A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager -)

  • 최수환;김치경
    • 한국안전학회지
    • /
    • 제27권4호
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로- (A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager -)

  • 최수환;배준태;이연수;김치경
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2012년 춘계학술대회
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

Estimating Benchmark Dose and Permissible Intake Level Using Subchronic Toxicity Data of Aristolochia Contorta

  • Lee, Hyomin;Eunkyung Yoon;Myungsil Hwang;Lee, Geunyung;Jisun Yang;Kihwa Yang;Kwangsup Kil
    • 한국독성학회:학술대회논문집
    • /
    • 한국독성학회 2002년도 Molecular and Cellular Response to Toxic Substances
    • /
    • pp.198-198
    • /
    • 2002
  • Occurrence of Chinese Herbs Nephropathy (CHN) has been reported in young women who had taken a slimming pills containing some chinese herbs. Aristolochic acid (AA) known as a carcinogen, was suspected as the major causal factor of CHN. AA is major component of fruit of A. contorta was used in Korean Traditional Medicine.(omitted)

  • PDF

물공급시설의 노후 위험도 평가를 통한 개선 우선순위 결정 (Decision Making of Improvement Priority by Deterioration Risk Assessment of Water Supply Infrastructures)

  • 채수권;이대종;김주환
    • 환경영향평가
    • /
    • 제18권6호
    • /
    • pp.367-376
    • /
    • 2009
  • This paper proposes an application methodology of AHP(Analytic Hierarchy Process) based decision making theory for improvement priority by assessment of various risk factors affecting on deterioration of water supply systems, as major social infrastructure. AHP method is organized with three level of hierarchy which is introduced for multi-criteria decision making in this study. In the first level, assessment outputs are calculated by AHP for each affecting factor. In the second level, criteria are estimated by using assessment results with respect to structural and environmental factors. Consequently, ranking decision is performed in the third level. In order to present the effectiveness, a proposed method is compared with FCP(Fuzzy Composite Programming) for decision making. Since the results of the proposed method show better performance with consistent results, it can be applied as an efficient information for the determination for improvement priority of the study infrastructure.

A review of the features, events, and processes and scenario development for Korean risk assessment of a deep geological repository for high-level radioactive waste

  • Kibeom Son;Karyoung Choi;Jaehyeon Yang;Haeram Jeong;Hyungdae Kim;Kunok Chang;Gyunyoung Heo
    • Nuclear Engineering and Technology
    • /
    • 제55권11호
    • /
    • pp.4083-4095
    • /
    • 2023
  • Currently, various research institutes in Korea are conducting research to develop a safety case for deep geological repository for high-level radioactive waste (HLW). In the past, low and intermediate-level waste (LILW) was approved by a regulatory body by performing a post-closure safety assessment, but HLW has different disposal characteristics and safety objectives are different. Therefore, in the case of HLW, safety assessment should be performed based on these changed conditions, and specific procedures are also under development. In this paper, the regulatory status of prior research institutes, feature, event and process (FEP) and scenario development cases were investigated for well-organized FEP and scenario development methodologies. In addition, through the results of these surveys, the requirements and procedures necessary for the FEP and scenario development stage during the safety assessment of repository for HLW were presented. These review results are expected to be used to identify the overall status of previous studies in conducting post-closure risk assessment for HLW repository, starting with identifying regulatory requirements, the most basic element.

Significant Parameters for Assessing Soil Contaminant-Leaching to Groundwater and Determining Soil Sample Size in Field Survey

  • Jeong, Seung-Woo;An, Youn-Joo
    • Environmental Engineering Research
    • /
    • 제13권2호
    • /
    • pp.73-78
    • /
    • 2008
  • For a given soil-contaminated site, a level of soil contamination is characterized and decisions on risk may be made from the risk assessment. The study evaluated critical design factors for the determination of sample size in the sampling design plan and the assessment of soil contaminant- leaching to groundwater. Two variables, the minimum relative detectable difference (T) and coefficient of variation (CV) were evaluated for the sample size determination. The minimum number of samples can be appropriately determined by CV under a T value greater than or equal to 0.2. Soil-contaminant leaching to groundwater was evaluated by using the Soil Screening Level equation of U.S. Environmental Protection Agency and the Risk Based Screening Level equation of American Society for Testing and Materials, with the same input parameters. The groundwater concentrations estimated from soil contaminant concentrations were significantly affected by the Darcy velocity of groundwater and the organic content of soil.