• Title/Summary/Keyword: Risk Level

Search Result 5,674, Processing Time 0.034 seconds

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

Risk Assessment in Finland: Theory and Practice

  • Anttonen, Hannu;Paakkonen, Rauno
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.1-10
    • /
    • 2010
  • The Finnish risk assessment practice is based on the Occupational Safety and Health (OSH) Act aiming to improve working conditions in order maintain the employees' work ability, and to prevent occupational accidents and diseases. In practice there are hundreds of risk assessment methods in use. A simple method is used in small and medium sized enterprises and more complex risk evaluation methods in larger work places. Does the risk management function in the work places in Finland? According to our experience something more is needed. That is, understanding of common and company related benefits of risk management. The wider conclusion is that commitment for risk assessment in Finland is high enough. However, in those enterprises where OSH management was at an acceptable level or above it, there were also more varied and more successfully accomplished actions to remove or reduce the risks than in enterprises, where OSH management was in lower level. In risk assessment it is important to process active technical prevention and exact communication, increase work place attraction and increase job satisfaction and motivation. Investments in OSH are also good business. Low absenteeism due to illness or accidents increases directly the production results by improved quality and quantity of the product. In general Finnish studies have consistently shown that the return of an invested euro is three to seven-old. In national level, according to our calculations the savings could be even 20% of our gross national product.

Multilevel Analysis on the Risk Factors for Depression in Jeollabuk-do (우울증 위험요인에 관한 다수준 분석: 전라북도 주민을 대상으로)

  • Jungwoo, Sohn
    • Journal of agricultural medicine and community health
    • /
    • v.47 no.4
    • /
    • pp.268-274
    • /
    • 2022
  • Objectives: The purpose of this study was to identify the individual and regional risk factors on depression using community-based data in Jeollabuk-do. Methods: This cross-sectional study obtained data from the Community Health Survey 2018 in Jeollabuk-do. The dependent variable was depression measured by Patient Health Questionnaire-9 (PHQ-9). The prevalence of depression was defined if total score of PHQ-9 was 10 or higher. A multilevel analysis was conducted to consider individual and regional level independent variables that could be risk factors for depression. Results: In the individual level, female gender and smokers had significantly higher odds ratios (ORs) for depression of 1.58 and 1.72, respectively. Subjects with economic activity, higher income and higher education had significantly lower ORs of 0.53, 0.41 and 0.66. In the regional level, higher greening rates and lower levels of PM2.5 had statistically lower ORs at the significance level of 10%. Conclusion: By conducting this study, risk factors associated with depression were identified in individual- and regional-level. This study suggests that health projects are needed to control regional level risk factors including community networks for mental health management in addition to the traditional individual level risk factors.

Improving Qualification of Safety Manager at Construction Site (건설현장 안전관리자의 자격기준에 관한 연구)

  • Gal, Won-Mo;Son, Ki-Sang;Jeong, Se-Gyun;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

Development of Risk-Appearance Frequency Evaluation Model for Railway Level-Crossing Accidents (철도건널목 사고 위험도-발생빈도 평가모델 개발)

  • Kim, Min-Su;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.96-101
    • /
    • 2009
  • In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.

Gender difference in the association of metabolic syndrome with hs-CRP Concentration of Blood

  • Park, Se-Kwon
    • Korean Journal of Clinical Laboratory Science
    • /
    • v.44 no.2
    • /
    • pp.86-96
    • /
    • 2012
  • The high sensitivity C-reactive protein (hs-CRP) as one of the typical acute phase reactants is used for predictive factor of the cardiovascular disease and diabetes mellitus. In addition, there are claims that must be included as factors of metabolic syndrome. This research examined the relationship between the concentration of hs-CRP in blood and risk factors of the metabolic syndrome by gender, and the rates of metabolic syndrome depending on the hs-CRP level based on the general public who took the comprehensive medical check-up at Chonbuk National University Hospital in the Jeonbuk province. The subjects aged 17-87 years were participated, and 2,000 people were included as the final subjects except the persons with more than 10 mg/L of the hs-CRP of blood level. The hs-CRP concentrations increased according to the number of risk factors of metabolic syndrome in both men and women. In regards to the risk ratio of metabolic syndrome based on hs-CRP level in blood according to gender, the risk ratio increased by 3.07 times in male and 4.55 times in female intermediate risk group and 3.60 times in male and 6.15 times in female high risk group compared to hs-CRP low risk group. As a result, there was a proportional relation between hs-CRP level and the occurrence of metabolic syndrome, and it occurs more frequently among women than men.

  • PDF

IDENTIFYING CRITICAL RISKS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS IN SINGAPORE

  • Xianbo Zhao;Bon-Gang Hwang;Mindy Jiang Shu Gay
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.444-450
    • /
    • 2013
  • Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.

  • PDF

A Study on the Accident Analysis by Nip Points and Risk Assessment in the Medium and Small Enterprise (중소 제조업의 끼임 재해분석 및 위험성평가 연구 - 경인지역 50인 미만 제조업을 대상으로 -)

  • Yang, Kwang Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.63-70
    • /
    • 2014
  • As preventive measures have received tremendous attention to prevent any possible accident in advance, many work places have introduced safety and health management systems. However despite of this government's effort, the industrial accident rate of small-scale businesses with less than 50 employees does not decline, which is mainly because the projects are not differentiated according to the risk level of individual business. To evaluate the risk level of small-scale businesses with less than 50 employees and then establish effective safety and health management systems according to the risk level, this study has conducted the following processes. The small-scale businesses with less than 50 employees were evaluated through accident type, and potential accident risk factor was evaluated through location, business type, and business size. The results of this analysis are expected to make contribution to improving the effectiveness of the safety and health management supports to small-scale businesses with less than 50 employees.

Real-time Risk Measurement of Business Process Using Decision Tree (의사결정나무를 이용한 비즈니스 프로세스의 실시간 위험 수준 측정)

  • Kang, Bok-Young;Cho, Nam-Wook;Kim, Hoon-Tae;Kang, Suk-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.49-58
    • /
    • 2008
  • This paper proposes a methodology to measure the risk level in real-time for Business Activity Monitoring (BAM). A decision-tree methodology was employed to analyze the effect of process attributes on the result of the process execution. In the course of process execution, the level of risk is monitored in real-time, and an early warning can be issued depending on the change of the risk level. An algorithm for estimating the risk of ongoing processes in real-time was formulated. Comparison experiments were conducted to demonstrate the effectiveness of our method. The proposed method detects the risks of business processes more precisely and even earlier than existing approaches.

Apparel purchase behavior among internet shoppers -Focusing on perceived risks- (인터넷 쇼핑몰에서의 의류제품 구매행동에 관한 연구 -위험지각을 중심으로-)

  • 조영주;임숙자;이승희
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.25 no.7
    • /
    • pp.1247-1257
    • /
    • 2001
  • The objectives of the study were to examine apparel purchasing behavior in internet shopping malls and the level of perceived risk when internet users purchase online. For this research, 15,000 internet users were given questionaries via E-mail, or special website online. The sum of 1958 questionaries were used for statistical analyses. Using, SAS package, factor analysis, Crobach's ${\alpha}$, t-test, $\chi$$^2$-test, frequency and multi-response analysis were performed. As the results, 19% out of internet users had bought apparel products through internet shopping malls. Men had more purchasing experiences in apparels as well as general products than women. Among apparel products, T-shirts/shirts were purchased the most by internet shoppers. For perceived risks, 6 factors(quality risk, time/convenience risk, size and appearance risk, privacy risk and social/psychological risk) were investigated for this study. The level of perceived risk was lower when people had a purchasing experience in internet shopping mall than when they didn't. The level of perceived risk was lower when people had purchasing intend about apparels than when they didn't. Based on these results, marketing strategies will be suggested.

  • PDF