1 |
Kwon hyun han ,Myong soo jung(2011), "Development of a Future Disaster Risk Assessment Model for Climate Change Using Bayesian GLM and Statistical Downscaling Model", Korean Society of Hazard Mitigation, Vol.11 No.6, pp207-216.
과학기술학회마을
|
2 |
Kim woo jin(2013), "Development of Risk Assessment System for Risk Factor Analysis Using EXCEL", Master. Department of Industrial Engineering, hansung university.
|
3 |
Kim tae wong(1999), "Manufacturing Planning and Control", yunamsa, pp159-169.
|
4 |
La seoung hun, Suh ji han, Cho young wook, Yang kwang mo & Kim min jun(2014), Industry safety system, hyungseul, pp143-158.
|
5 |
Lee baek hyun(2008), "An Empirical Study on the Impact of theActivities in Industrial Safety & Health Management on Business Management", Ph.D. Department of Industrial Engineering, Inha university.
|
6 |
Lee kwang sik(2014), "A Study on Risk Assessment Design and Application by Construction Disaster Form", Master, Department of Industrial Engineering, Myongji university.
|
7 |
Oh ji yong(2007), "A Study on Calamity Index Evaluation of the Construction Safety Based on FRAT", Ph.D. Department of Industrial Engineering, Myongji university.
|
8 |
Al-Bahar, J. F. and Crandall, k. c.(1990), "Systematic Risk Management Approach for Construction Projects", J. of Construction Eng. and Manag., Vol. 226. No. 3, pp. 533-546.
|
9 |
Baradan S. and Usmen, M.A.(2006), "Comparative Injury and Fatality Analysis of Building Trades", J. Constr. Eng. Manage., 132(5), pp. 533-539.
DOI
ScienceOn
|
10 |
Ministry of employment and labor(2013), 2013.03.14 policy data.
|
11 |
Choi yoo han(2006), "Development of an expert system for prevention of industrial accidents based on an optimal data mining algorithm", Ph.D. Department of Industrial Engineering, Gangneung wonju national university.
|