• 제목/요약/키워드: Risk Factor Assessment

검색결과 601건 처리시간 0.026초

장시간 체공 항공기 조종사의 피로위험관리 적용 연구 (A Study on Application of Fatigue Risk Management System for Pilot to Fly Longer Hours)

  • 김대호;이장룡
    • 한국항공운항학회지
    • /
    • 제27권2호
    • /
    • pp.47-53
    • /
    • 2019
  • The development of the aviation industry and the changes in the military operation mission environment are demanding more long - distance operation (long - time flight), and such a flying environment is a risk factor for fatigue - related accidents. For the aviation related organizations such as ICAO and FAA, fatigue risk management system (FRMS) are applied along with flight time restriction regulations to prevent fatigue related accidents. The most important process in FRMS is fatigue risk management. Fatigue risk management systematically manages fatigue through scientific fatigue risk data collection and fatigue risk assessment. The purpose of this study is to applicate the assessment of scientific fatigue risk management to pilots of airplanes engaged in long flight. We reviewed the current state of risk management and FRMS through previous research. We also developed fatigue risk management indicators and examined the validity of internationally recognized fatigue risk data collection methods and fatigue risk assessment tools. There are 134 mission (flight) data used for development. In order to verify the indicators, the fatigue risk score between the items was assigned through pair-wise comparison. In addition, the verify test results were normalized.

알파모수 공통원인고장 평가 기법을 활용한 원자력발전소 안전성 평가 (Probabilistic Safety Assessment of Nuclear Power Plants Using Alpha Factor Method for Common Cause Failure)

  • 황석원
    • 한국압력기기공학회 논문집
    • /
    • 제10권1호
    • /
    • pp.51-55
    • /
    • 2014
  • Based on the results of Probabilistic Safety Assessment(PSA) for a Nuclear Power Plant (NPP), Common Cause Failure(CCF) events have been recognized as one of the main contributors to the risk. Also, the CCF data and estimation method used in domestic PSA models have been pointed out as an issue with respect to the quality. The existing method of MGL and non-staggered testing even widely used were considered conservative in estimating the safety and had a limited capability in uncertainty analyses. Therefore, this paper presents the CCF estimation using a new generic data source and Alpha factor method. The analyses showed that Alpha factor and staggered method are effective in estimating the CCF contribution and risk insights of reference plant. This method will be a common bases for the optimization of new design for the construction plants as well as for the updating of safety assessment on the operating nuclear power plants.

이동식크레인 작업의 중대재해예방을 위한 표준 리스크 평가 지수 개발 (건설업을 중심으로) (Development of Standard Risk Indicators for the Prevention of Serious Accidents in Mobile Crane Operations (Focused on Construction Industry))

  • 최종국;이종우
    • 한국재난정보학회 논문집
    • /
    • 제19권3호
    • /
    • pp.719-728
    • /
    • 2023
  • 연구목적: 이동식크레인은 높은 사망률에 기여하는 기계로 최근 6년간(2016~2021) 사고사망사례 중 건설업 2,574건을 분석한 고위험요인(SIF)정보에서 이동식크레인의 사고는 총 61건의 재해가 발생하였다. 현장의 안전대책에도 불구하고 제대로 활용이 안되고 있다. 본 연구에서는 표준 리스크 평가 지수를 제시하여 사고예방에 기여하고자 한다. 연구방법: 전문가 면담과 사망사고 사례분석, 현장실태분석, 문헌조사를 통해 위험성평가의 4M방식의 표준 리스크 평가 지수 방법을 제시하고자 한다. 연구결과: 현장 8개현장 위험성평가를 분석한 결과 재해예방에 실질적인 기여를 할 수 없다는 결론을 얻었으며, 표준 리스크 평가 지수 방식의 개선방안으로 적용하여야 한다. 결론: 건설현장에서 표준 리스크 평가 지수방식으로 전환함으로써 안전보건관계자 및 근로자가 쉽게 이용할 수 있고 재해감소에 기여할 수 있을 것으로 제안한다.

확률론적 지진위험도 분석을 위한 원전 격납건물의 비탄성에너지 흡수계수 평가 (Inelastic Energy Absorption Factor for the Seismic Probabilistic Risk Assessment of NPP Containment Structure)

  • 최인길;서정문
    • 한국지진공학회논문집
    • /
    • 제5권5호
    • /
    • pp.47-56
    • /
    • 2001
  • 원전 격납건물은 내진 안정성을 확보하기 위해 설계단계에서 여유나 보수성을 부여하게 된다. 원전 구조물의 내진성능 평가는 이러한 여유나 보수성을 배제한 실질적인 성능 및 응답을 기준으로 평가하게 된다. 본 연구에서는 내진성능 평가에 고려되는 구조물의 성능 및 응답관련 계수들 중 그 기여도가 비교적 큰 비탄성 에너지 흡수계수의 산정방법에 대한 비교를 수행하였다. 또한 각종 방법에 따라 산정된 비탄성 에너지 흡수계수에 따른 HCLPF(high confidence of low probability of failure)값의 변화를 분석하였다. 연구결과 원전 격납건물의 비탄성 에너지 흡수계수는 1.5~1.75로 나타났다. 구조물의 내진성능을 명확히 평가하기 위해서는 먼저 구조물의 비선형 거동 및 연성도를 정확히 평가하여야 함을 알 수 있다.

  • PDF

도시 녹지 공간의 재해 위험도 평가 연구 (A Study on Disaster Risk Assessment in the Urban Open Spaces)

  • 유주은
    • 한국조경학회지
    • /
    • 제43권5호
    • /
    • pp.13-27
    • /
    • 2015
  • 본 연구는 도시 내 녹지 공간을 대상으로 기후변화로 인한 재해 위험도를 평가하였다. 재해유형, 녹지공간 유형에 따른 평가를 실시하였으며, 수해와 풍해, 평지형 공원과 산지형 공원으로 유형화 시키고, 각 유형별 평가항목으로는 자연적 요소 인공적 요소 사회적 요소로 구분하여 평가 분석하였다. 연구의 주요결과는 다음과 같다. 수해로 인한 재해 위험도 표준화 점수는 평지형 공원의 경우, 아시아 공원이 55.800점으로 서울숲 51.775점보다 높았으며, 산지형 공원의 경우 도곡 공원 58.428점, 배봉산 공원 58.374점의 지수를 보이고 있었다. 풍해로 인한 재해 위험도 표준화 점수를 살펴보면 우선 평지형 공원의 경우, 아시아 공원이 64.763점으로 서울숲 61.054점보다 높았으며, 산지형 공원의 경우, 배봉산 공원이 58.533점으로 도곡 공원 55.459점보다 높은 지수를 나타냈다. 기후변화 재해로 인한 오픈스페이스 위험도 평가의 필요성과 가치를 제기하고, 오픈스페이스만의 재해 위험도 평가모형을 정립하여 위험도 평가를 시도하였으며, 도시 녹지공간의 재해 위험도를 제고하였다.

도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 - (Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system -)

  • 유지오;신현준;김종원
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 - (Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents -)

  • 고휘재;현지훈;이주희;안요섭
    • 한국건설관리학회논문집
    • /
    • 제23권4호
    • /
    • pp.15-25
    • /
    • 2022
  • 건설산업의 중대재해 발생률 및 사망률이 가장 높아짐에 따라 이를 감축하기 위해 국내에서도 다양한 노력을 기울이고 있다. 그 중 위험성 평가는 시공단계 위험요소를 평가하고 재해 감소대책을 위한 자료로 활용되고 있다. 그러나 기존의 위험성 평가는 수행자의 주관이 개입되며 국내 건설현장에 취약한 측면이 있다. 본 연구는 위험성 평가 분야에 BIM을 활용하여 정량적으로 위험요소를 도출함으로써 리스크를 조기 식별하고 사전제거하는 것을 목표로 위험성 평가를 위한 DB 분류체계를 구축하였으며 BIM을 활용한 위험성 평가의 방법론을 제시한다. 이를 통해 리스크의 사전 제거로 시공 작업자의 안전성을 증대시키고 안전관리 분야의 추가비용을 절감한다. 또한, 신규 공법에도 적용 가능하므로 프로젝트 참여자들의 이해도를 높이며 의사소통의 도구가 된다. 본 연구는 BIM을 기반으로 정량적인 위험도를 도출하는 프레임워크를 제안하는 연구로써, 향후 BIM을 활용한 위험성 평가 분야에 기반 기술로 활용될 것이다.

높이 20미터 미만인 구조물의 낙뢰리스크 평가 (Lightning Risk Assessment for Structures Lower than 20m High)

  • 이주철;김기현;이영철
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.21-27
    • /
    • 2012
  • Korean Industrial Standards for lightning protection system complies with IEC standards. However, the standards are applicable only to buildings and structures more than 20 meters in high. Therefore, it is necessary to determine whether lightning protection system should be installed on structures lower than 20 meters high. This paper proposes an efficient method of assessing risk against lightning of structures lower than 20 meters high. The method suggests simplified lightning protection system and provides selecting an appropriate protection level. The suggested method assumes that structure under assessment has no lightning protection system and there is no person around the structure at the moment of lightning stroke. A simplified method of assessing the risk to human within the structure is developed by adopting the general assessment factor. The selection of a protection level is possible by comparing tolerable risk with physical damage risk caused by a direct lightning. Finally, this paper gives ways to establish surge protection measures when a structure with lightning risk is within a radius of 2km from the assessed structure even if this structure requires no lightning protection system.

산업보건 위험성평가 기법의 현장 적용에 관한 연구 (A Study on the Field Application of Occupational Health Risk Assessment Method)

  • 정종득;유재흥;김윤희;정기효
    • 대한안전경영과학회지
    • /
    • 제26권2호
    • /
    • pp.79-86
    • /
    • 2024
  • Scientific exploration of how occupational health risks relate with occupational illnesses are essential for mitigating health-related issues in industries. This study analyzed the risk scores obtained by occupational health risk assessments at 3,172 manufacturing companies and examined their effects on occupational illness. Statistical analyses revealed that companies with an occupational health manager (scored 89.1 out of 100) had significantly higher activity scores of health management compared to those without (78.2). However, companies with a history of occupational illness (79.1) or those classified as high-risk industries (85.2) had significantly lower activity scores than their counterparts (81.7, 87.3). In addition, regression analyses using factor analysis showed that latent risk factors such as cardiovascular disease/job stress, health management, and musculoskeletal problem significantly influenced the risk of occupational illness. The activity factors such as health management, work environment management, and regulatory complaisance significant impacted the reduction of occupational illness. The findings of this study can be used to improve the occupational health risk assessment method and utilized in effectively managing occupational risks in industries.

터널 리스크 평가 기법의 적용성에 대한 연구 (The application of simplified risk assessment for tunnel)

  • 김상환;이충환
    • 한국터널지하공간학회 논문집
    • /
    • 제9권1호
    • /
    • pp.63-74
    • /
    • 2007
  • 불확실한 지반의 상태는 항상 터널 건설에 있어서 많은 문제점을 일으킨다. 그러므로 새로운 터널의 건설에 앞서 위험에 대한 평가가 필요하다. 이 논문은 수정된 안정계수를 이용한 간편 위험도 평가 시스템인 URI(Underground Risk Index)를 제안하였다. URI의 평가요소들은 각 요소의 등급에 따라 점수화하여 분석함으로서 설계단계에서 위험 가능성에 대한 평가에 이용이 가능하도록 하였으며, 기존의 Interaction Matrix에서 8개의 설계 요소 중(RQD, 일축압축강도, 풍화도, 안정계수, 토피고, 지하수위, RMR, 투수계수)안정계수 산정방법을 수정하여 보다 신뢰성을 높였다. 또한 현장적용에 대한 신뢰성을 검증하기위하여 URI 시스템을 실제현장에 적용하였다.

  • PDF