• Title/Summary/Keyword: Risk Cost

Search Result 1,536, Processing Time 0.03 seconds

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.

The Impact of Patient Satisfaction With Nursing Care Services, Switching Costs and Perceived Risk on Intention of Reuse in the Emergency Medical Center (응급의료센터 내원환자의 간호서비스 만족도, 전환비용 및 지각된 위험이 재이용 의도에 미치는 영향)

  • Kim, Hyun-Jeong;Yom, Young-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.17 no.4
    • /
    • pp.432-442
    • /
    • 2011
  • Purpose: The purpose of this study was to identify the factors influencing the intention of the reuse in patients admitted in university hospital emergency medical center. Method: The participants were 253 patients admitted to a niversity hospital emergency medical center. Data were collected with self-administrated questionnaires and analyzed by hierarchical multiple regression. Results: Patient satisfaction with nursing care service and switching cost were positively correlated with reuse by patients while the perceived risk was negatively correlated. As levels of satisfaction with nursing care services and switching cost increase, intention of reuse increases. Satisfaction with nursing care service, switching cost and perceived risk in emergency medical center influence intention to reuse and explain 68.8% of total variation of intention to reuse. Conclusion: Findings provide strong empirical evidence for importance of atient satisfaction with nursing care service, the switching costs and the perceived risk in explaining the intention of reuse an emergency medical center.

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

The role of risk perception for the definition of acceptable risk (위험 인식이 위험성 수용 기준 설정에 미치는 역할)

  • 노삼규
    • Fire Science and Engineering
    • /
    • v.9 no.2
    • /
    • pp.3-9
    • /
    • 1995
  • Acceptable risk problem are decision problems they requires a choice among different estimations of technological risks. The alternative option includes a threat to life among its consequences. However, the definition used to ignore the public's perceived risk which should be identified as acceptable risk. The study examine the role of perception of risk as acceptable risk between different situations of estimated consequence and probability of risk. The cost benefit principle for the reduction of risk applied to find the possible solutions with in decision making process.

  • PDF

Prediction of Health Care Cost Using the Hierarchical Condition Category Risk Adjustment Model (위계적 질환군 위험조정모델 기반 의료비용 예측)

  • Han, Ki Myoung;Ryu, Mi Kyung;Chun, Ki Hong
    • Health Policy and Management
    • /
    • v.27 no.2
    • /
    • pp.149-156
    • /
    • 2017
  • Background: This study was conducted to evaluate the performance of the Hierarchical Condition Category (HCC) model, identify potentially high-cost patients, and examine the effects of adding prior utilization to the risk model using Korean claims data. Methods: We incorporated 2 years of data from the National Health Insurance Services-National Sample Cohort. Five risk models were used to predict health expenditures: model 1 (age/sex groups), model 2 (the Center for Medicare and Medicaid Services-HCC with age/sex groups), model 3 (selected 54 HCCs with age/sex groups), model 4 (bed-days of care plus model 3), and model 5 (medication-days plus model 3). We evaluated model performance using $R^2$ at individual level, predictive positive value (PPV) of the top 5% of high-cost patients, and predictive ratio (PR) within subgroups. Results: The suitability of the model, including prior use, bed-days, and medication-days, was better than other models. $R^2$ values were 8%, 39%, 37%, 43%, and 57% with model 1, 2, 3, 4, and 5, respectively. After being removed the extreme values, the corresponding $R^2$ values were slightly improved in all models. PPVs were 16.4%, 25.2%, 25.1%, 33.8%, and 53.8%. Total expenditure was underpredicted for the highest expenditure group and overpredicted for the four other groups. PR had a tendency to decrease from younger group to older group in both female and male. Conclusion: The risk adjustment models are important in plan payment, reimbursement, profiling, and research. Combined prior use and diagnostic data are more powerful to predict health costs and to identify high-cost patients.

Weld Quality Monitoring System Development Applying A design Optimization Approach Collaborating QFD and Risk Management Methods (품질 기능 전개법과 위험 부담 관리법을 조합한 설계 최적화 기법의 용접 품질 감시 시스템 개발 응용)

  • Son, Joong-Soo;Park, Young-Won
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.6 no.2
    • /
    • pp.207-216
    • /
    • 2000
  • This paper introduces an effective system design method to develop a customer oriented product using a design optimization process and to select a set of critical design paramenters,. The process results in the development of a successful product satisfying customer needs and reducing development risk. The proposed scheme adopted a five step QFD(Quality Function Deployment) in order to extract design parameters from customer needs and evaluated their priority using risk factors for extracted design parameters. In this process we determine critical design parameters and allocate them to subsystem designers. Subsequently design engineers develop and test the product based on these parameters. These design parameters capture the characteristics of customer needs in terms of performance cost and schedule in the process of QFD, The subsequent risk management task ensures the minimum risk approach in the presence of design parameter uncertainty. An application of this approach was demonstrated in the development of weld quality monitoring system. Dominant design parameters affect linearity characteristics of weld defect feature vectors. Therefore it simplifies the algorithm for adopting pattern classification of feature vectors and improves the accuracy of recognition rate of weld defect and the real time response of the defect detection in the performance. Additionally the development cost decreases by using DSP board for low speed because of reducing CPU's load adopting algorithm in classifying weld defects. It also reduces the cost by using the single sensor to measure weld defects. Furthermore the synergy effect derived from the critical design parameters improves the detection rate of weld defects by 15% when compared with the implementation using the non-critical design parameters. It also result in 30% saving in development cost./ The overall results are close to 95% customer level showing the effectiveness of the proposed development approach.

  • PDF

A Study on the Cost of Capital of Islamic Enterprise (이슬람기업의 자본조달비용에 관한 연구)

  • Choi, Tae-Yeong
    • International Area Studies Review
    • /
    • v.13 no.2
    • /
    • pp.505-523
    • /
    • 2009
  • We study the cost of capital of Islamic enterprise using the Capital Asset Pricing Model(CAPM). When there exists no risk-free interest rate, the security market line(SML) of Islamic enterprise shows an upward slope starting from the origin. The slope is bigger than that of SML with risk-free interest rate. This is because the cost of capital of Islamic enterprise is higher than that of western firms for the same level of systematic risk. When the effect of zakat is considered, the risk-free interest rate is replaced by minimum required rate of return. The SML of Islamic enterprise reveals an upward slope but it does not pass through the origin. This is because Islamic enterprise cannot invest on risk-free asset. In order to overcome the theoretic limits of CAPM, we propose to use multi-factor approach such as arbitrage pricing model instead of single-factor model for future study.

Determination of Optimum Investment level for Safely Management by Process Risk Assessment at Gas Governor Station (가스공급기지에서 공정 위험성 평가에 의한 최적 안전관리 투자수준 결정)

  • Kim Tae-Ok;Jang Seo-Il
    • Journal of the Korean Institute of Gas
    • /
    • v.7 no.3 s.20
    • /
    • pp.1-6
    • /
    • 2003
  • This study has suggested a decision method which determine optimum investment level for safety management by process risk assessment at gas governor station. Hazard and operability study(HAZOP), fault tree analysis(FTA) and consequence analysis(CA) were carried out and potential accident cost and benefit for safety management were estimated. As a result, we could be found the trend of safety cost and benefit by the nonlinear regression method and could be determined the optimum investment level for safety management from analysis of safety management cost and potential accident cost.

  • PDF

Rigidity Evaluation under Uncertainties for Multiple Investment Alternatives over Multiple Periods

  • Kono, Hirokazu;Mizumachi, Tadahiro
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.107-120
    • /
    • 2010
  • In today's uncertain economic environment, the evaluation of safety for investment alternatives is of practical importance in manufacturing companies. This paper examines a method of quantitatively evaluating profitability and risk for multiple alternatives using the total-cost unit-cost domain. The paper assumes such factors as unit sales price, sales and production volume, unit variable cost, fixed cost, and yield for each alternative. The paper incorporates the relationship between production capacity and demand, distinguishing between cases of production capacity surplus and shortage for each year over the entire planning horizon. The paper investigates the case in which the values of each factor independently move in the direction of decreasing profit each year, and clarifies the procedure of comparing safety among multiple investment alternatives on a single consolidated total-cost unit-cost domain. The difficulty of the problem lies in the method of consolidating multiple total-cost unit-cost domains into a single domain since the combination of years of capacity surplus and shortage depends upon the change values in each factor under consideration. A systematic method of evaluating profitability as well as risk is presented, and the validity of the proposed method is verified using a numerical example.

The Impact of Corporate's Name Change on Cost of Capital (상호변경이 내재자본비용에 미치는 영향)

  • Yu, Soon-Mi
    • Management & Information Systems Review
    • /
    • v.33 no.4
    • /
    • pp.21-38
    • /
    • 2014
  • This study investigates whether and how a firm's cost of equity is influenced by the extent of a firms's name change. Even though corporate name change doesn't give any benefit to investors, it can be a signaling about firm's future valuation. And also, if that signaling has high credibility, it can be decrease information cost and the firm's cost of equity. on the contrary to this, if corporate name change is kind of break with the past and corporate image laundering, it is bad signaling to investors. So it can be increase information risk and the firm's cost of equity. Using yearly cross-sectional regressions of the cost of equity on our proxies for corporate name change, size, beta, market-to-book ratio and other innate risk factor over the 2005-2010, we find that the cost of capital is positively associated with corporate name change after controlling for all other factors. This result implies that corporate name change increase information risk of the business, and thus increase information asymmetries between managers and outside investors with respect to a firm's true future value. This increases information risk, and creates an adverse selection problem, on the part of outside investors. Rational investors therefore demand a premium for bearing this corporate name change-related information risk, which in turn leads us to observe a positive relation between the intensity of corporate name change and the cost of equity.

  • PDF