• Title/Summary/Keyword: Revegetation Stability

Search Result 22, Processing Time 0.03 seconds

The Retaining Wall Revegetation Technology Using Planting Blocks(I) - A Case study on the Eco-Stone structure - (식재용 블록을 이용한 옹벽 녹화 기법에 관한 연구(I) - Eco-Stone의 시공 사례를 중심으로 -)

  • Han, Sung-Sik;Chung, Kyung-Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.2 no.1
    • /
    • pp.94-102
    • /
    • 1999
  • The retaining wall is a structure which was made for changing land form in many construction. The first role of the retaining wall is to maintain the slope stability. But recently, the amount of retaining wall have been increasing because of the expansion of construction works and the amenity of urban environment have been decreasing because of environmental destruction and the scenic heterogeneity. So we should consider the slope stability and ecological stability at the same time. The purpose of this study is to develop the retaining wall revegetation technology using the Eco-Stone, the structure of co-satisfying which included the slope stability and the revegetation effect. Eco-Stone is a structure which has high stability for earth pressure, settlement and drainage. And cost and term of construction works also have been decreased. Eco-Stone structure is one of factors composing the ecological network which is harmonize with surrounding environment. In this way, it is expected that the ecological habitats of various species would be restored.

  • PDF

Evaluating Erosion Risk of Revegetated Cutslope with Seed Spraying (식생기반재 뿜어붙이기의 비탈면 녹화이후 침식 안정성 평가 방법)

  • Kil, Sung-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.6
    • /
    • pp.63-76
    • /
    • 2016
  • Slope revegetation refers to the use of vegetation and construction to protect a barren slope devastated by road and building construction. Among many revegetation strategies, hydroseeding has been widely utilized to stabilize barren slopes and has become the representative approach. Previous studies on slope stability have been conducted from a civil engineering perspective, mainly evaluating the stability of cut-slopes on solid bedrock and the use of concrete structures to stabilize devastated slopes. This study was conducted to develop a method to evaluate erosion risk of revegetated cut-slopes, based on criteria derived from previous studies. Twenty-five factors were surveyed on both on-the-spot erosion slopes and non-erosion slopes after slope revegetation to compare slope types. The scores of all non-erosion slopes exceed 80 score while erosion slopes are 80 below. Erosion slopes got the range of 68-74 score while non-erosion slopes got the range of 81-100 score in the first result which was not applied for weighted-values. The scores of all non-erosion slopes exceeded 3.10, while erosion slopes were below 3.10. Erosion slopes were in the range of 2.73-3.09, while non-erosion slopes were in the range of 3.15-3.90 in the second result, which was applied with weighted-values according to the AHP result from a previous study.

Investigation of Environmental characteristics on fibrous biodegradable polymer for slope revegetation (식생기반재로 이용되는 섬유상 생분해소재의 환경성 고찰)

  • Kim, Duk-Sik;Kim, Dong-Sik
    • Journal of the Society of Disaster Information
    • /
    • v.3 no.2
    • /
    • pp.23-35
    • /
    • 2007
  • Recently, for places with poor vegetating environment, such as slopes made of weathered soil or rocks, erosion tranquilizers, coverings and composite fertilizers have been mixed with seeds and sprinkled onto soil. Also, these plant revegetations have been mixed with nets and used to strengthen cohesion. However, this technique often obstructed plant growth and caused pollution because of not decomposing nets. This study has tested influence on plant revegetation B for slope of weathered soil and rocks and decomposition of naturally decomposing polyester filament yarn. In result, it was showed that plant revegetation B does not harm environment in case of applying it to soil slope and enhance protection capacity of slopes as time goes by. Also, naturally decomposing polyester filament yam was analyzed its physical properties with the passage of time and was known that naturally decomposing polyester filament yarn transformed into a structure easy to decompose by hardening. Thus it is considered that the revegetation method used this study was very effective method for plant establishment and stability of slope.

  • PDF

A Study on the Revegetation Structural Analysis for Environment Factor of Road Slope (도로비탈면의 환경인자를 고려한 식생구조분석에 관한 연구)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.2
    • /
    • pp.12-20
    • /
    • 2004
  • This study was carried out from January 1998 to December 1999 to report the revegetation of cutting-rock slopes and a design standard in the highway cut-slopes. The field data was collected from the 67 sites cutting-rock slopes of highways, local roads, and field test. As the result of analyze, cutting-rock slopes revegetation measures were 16 types. There were Vine planting(3 types), Hydroseeding measures with seed-fertilizer-soil materials(5 types), Vegetaion-base spraying measures(5 types), and Stability measures(3 types). The factors affecting the plant coverage rates of cutting-rock slopes were the slope gradient, the slope width and direction. The plant coverage rate decreases in the condition of steep slope and long slope width and length(height). In addition, the plant coverage rates of the westward and southward were lower than that of the northward and eastward. Most dominant species were Zoysia japonica, Lespedeza cyrtobotrya, Lespedeza cuneata, Rubus crataegifolius, Miscanthus sinensis, Arrundinella hirta, Themeda triandra, and Oenothera odorata. Exotic species were Eragrostis curvula(Weeping lovegrass), Dactylis glomerata Orchardgrass), Lolium perenne(Perennial ryegrass), and Festuca arundinacea(Tall fescue). It is recommended to adjust the proposed factor as environment, topsoil, classification of rock, field condition and characteristic related with revegetation measures on slopes for the presentation of revegetation standard.

Design on Slopes Revegetation and Tentative Instruction on Construction Work (비탈면 녹화 설계 및 시공 잠정 지침)

  • Jeon, Gi-Seong;Kim, Nam-Choon;Lee, Tae-Ock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.100-113
    • /
    • 2007
  • In Korea, there has been no revegetation applicable standard for slopes formed by road construction work up to now, so revegetation work has been done using mostly foreign varieties in the manner of early revegetation. However, foreign varieties have some shortcomings; for example, they tend to be dried to death after construction work. Besides, due to the rift in the supporting soil, these revegetated varieties are often displaced from the slopes. Thus, the Ministry of Construction & Transportation on July, 2005 established revegetation standard on the slopes suited for the natural eco-system of Korea and organized positively recommending directions for using self-sewn plants growing near the slopes in overall consideration of soil, weather, regional conditions. The locations specified in this direction are the slopes at the road construction jobsite like the expressway, highways, and local roads. In addition, the Ministry's standard and directions stipulated that damaged slopes's natural environment and eco-system due to various road construction work should be restored, and thus a feeling of stability and pleasantness should be provided to road users as well. Also, the Ministry tried to select seed plants and revegetation measures suited for surrounding environment to put the environment-friendly slope revegetation measures into practice through the test revegetation work in order to prevent illegal construction practices and to improve the quality of revegetation. According to the direction, revegetation districts aimed at the slopes are divided into three ones in consideration of weather environment, regional environment, and forest environment as follows : national territory's core ecological green-land based district centering on the Taebaek Mountains; coastal ecosystem district including islands off the coast; inland eco-system district. The combination of revegetation plants according to environment revegetation districts, should be executed by dividing into herb-oriented type, woody plant colony type, and bio-species versatility restoration type, and the selection of seeding plants should be done in the presence of a supervisor and through test construction results and technology counseling from a specialist in natural eco-system restoration and revegetation measure seed combination standard according to environment revegetation districts. This direction will be executed in the manner of monitoring until the yea 2008 and 2009 it will be finalized and enforced on December, 2009.

A Study to Improve Regulations and Techniques for the better Application of Ecological Revegetation Method to Cut-Slopes (생태적 절개비탈면 조성을 위한 녹화공법 개선 방안 연구)

  • Kang, Tai Ho;Ahn, Young Hee;Park, Yong Hwan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.4 no.2
    • /
    • pp.26-35
    • /
    • 2001
  • We are, now in the 21st century, that environmental preservation and the campaign for bio-diversity protection are very important issues the government must deal with as nation's main policy. To make road and building construction, housing land service, construction of golf fields, and various development works, we have made artificial topographical alterations and as a result, the cut-slop has been increased. However, without the proper study and clear planning, revegetation for the stability of the cut-slop has worked out. These efforts now are causing derangement of an ecosystem and spoiling the nature without considering for ecological adaptation. Therefore, we are going to find out the Revegetation Method to Cut-Slopes considering both the ecological adaptation and harmony with the nature.

  • PDF

Study on the Revegetation Methods for the Rehabilitation and Restoration of the Disturbed Slopes in Limestone Mines -Case study of Ibuki mine and Bukou mine in Japan- (석회석광산의 식생녹화방법에 관한 고찰 -일본 이부키광산과 부코우광산의 사례연구-)

  • Lee, Joon-Woo;Kim, Nam-Choon;Nam, Sang-Joon;Park, Chong-Min;Cha, Du-Song
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.6
    • /
    • pp.72-85
    • /
    • 2003
  • The purpose of this study is to establish the basis of the ecological restoration on the limestone mines in Korea, through the research of the revegetation measures of the disturbed slopes in Japanese limestone mines and the analysis of the case of Ibuki and Bukou limestone mines to realize the restoration works successfully. According to the number of mines to carry out the revegetation works increase every year, the revegetation area and amount of planting also go on increasing in Japan. In the small mines the environmental problem is not recognized seriously, but some mines have muchly invested in the revegetation of the damaged land by mines. Ibuki mine in Shiga-gen is practicing the four principles for the restoring of the revegetation in the disturbed slopes by mines. Firstly, the mean slope preserves $37^{\circ}$ in the last rock cut slopes. Secondly, the last rock cut slopes to rehabilitate are covered with the soil dressing 30cm high. Thirdly, the grasses in the mining area are digged up beforehand, and then they are reused to the revegetation works of rock cut slopes. Lastly, from the upper rock cut slopes the revegetation works begin, the process of the above are repeated, as the result, the restoring works will be completed. Upon the ground of these principles, the complex of the original vegetation and the native species seeding, that is, the revegetation technique of Ibuki have established. In the difficult area to revegetate, sodding works, heaping up vegetation-sack, seed-spraying, heaping up soil-sacks and planting works are adapted variously. Bukou mine in Saitama-gen try to maintain the revegetation, the screening and the stability of the enormous mining rock cut slope, and for these works, the activity of 'Chichibu Working Group of Rock Wall for Limestone Mines' contributes largely. The chief technique of the revegetation in Bukou mine is following; after the making the berm on the rock cut slopes, the soil dressing is filled in it, and the trees is planted for the screening of the rock cut slopes. They devide the rock cut slopes into four typical types, and choose the different ways to make the berm and fill the soil dressing in characteristic. Most of the planting trees are consist ofthe native species of Mt. Bukou through the stages of the nursery and transplantation. Not only the revegetation of the demaged land but also the breeding of the conservational plants also are their important business.

Technique Development of Wildgrasses for Hydroseeding Material (야생초 가공에 의한 종자분사공법 재료화 기술)

  • 주영규;김성균
    • Asian Journal of Turfgrass Science
    • /
    • v.11 no.3
    • /
    • pp.161-166
    • /
    • 1997
  • This study was performed to develope the method of wildgrass to process as hydroseeding material which is a most popular revegetation method for Slope areas through the control of soil eroison and stability by seeding grasses. The wildgrass material for the processing were harvested at Suwon, Kyungki-do and Wonju, Kangwon-do in 1994. The investigations were established in laboratory for pot and field experiment with seven treatments by harvesting date and place in 1995. Results indicated that wildgrass harvested field in open space or road side was able to be used as hydroseeding material by proper processing. It was possible to substitute wildgrass seed to conrrnercial turfgrass seed, and plant tissue to mulching fiber by drying and crushing process. Germination of wildgrass seed was relatively slower than control (20g /$m^2$ turfgrass seed) in early stage of 20 days, but surface revegetation rate was higher in 50 days at wildgrass plot than control applied by normal hydroseeding method. Mixture of 5g /$m^2$ of cool season turfgrass seed to wildgrass material increased the rate of early stage of germination and surface revegetation. The application of wildgrass as hydroseeding material showed more naturalistic scenery than rutine hydroseeding with imported cool season turfgrass seed. Key words: Rydroseeding, Turfgrass, Wildgrass, Revegetation.

  • PDF

Selection of Turfgrass Species and Cultivars for Hydroseeding on Road Side Slope Areas (도로비탈면의 종자분사공법용 잔디종류의 선택)

  • 주영규
    • Asian Journal of Turfgrass Science
    • /
    • v.9 no.3
    • /
    • pp.173-185
    • /
    • 1995
  • Hydroseeding technique is a very popular method of revegetating slope areas through the control of soil erosion and stability by seeding grasses. This study was conducted to select turfgrass species and cultivars for hydroseeding. Experiment plots were established on various soil types and environmental conditions at Singar-Ansan high-way construction site. The investigation was designed in three cutting, one back-filling and other three spare sites with various seed mixtures. Results indicated that combinations of seed mixtures influenced seed germination and rates of surface cover. In a view of long term, vegetation shifts should be influenced by characters of slopes and micro-climate conditions. Hydroseeding did not show good results on rocky slope areas. Revegetation was only going on where there had soil. The combination of seed mixture with a higher rate of perennial ryegrass had relatively good revegetation with faster germination and seedling growth. Improved turf-type tall fescue Arid ⓡ and Falcon ⓡ seemed to have good environ-mental adaptation and drought tolerance. Wild or old type cultivars showed relatively slow green-up in spring and growth rates at the next year of seeding. For the harmonious landscaping with surrounding area, the combination of native grass mixture with cool-season grasses had good results. Slow and low revegetation rate at hack-filling site seemed to be caused by the poor development of capillary tubes in sub-soil. It was shown that a high correlation between seed germination and revegetation rate, and between three-month later coverage rate and final rate. The evaluation of coverage rate after three month seems to he acceptable to decide the accomplishment of hydroseeding results on rode side slopes.

  • PDF

An Analysis on the Visual Image and Harmony of the Construction Method in the Slope Scene -A Case on the Daejeon${\~}$Jinju Highway- (고속도로 비탈면 경관의 법면공법에 따른 시각적 이미지와 조화성 분석 - 대전${\~}$진주간 고속도로를 대상으로 -)

  • Lee Jeong
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.1 s.108
    • /
    • pp.33-48
    • /
    • 2005
  • The purpose of this study was to discover the landscape visual image of the slope scene and their harmony with surrounding sceneries. This research utilized the basic study tool of psycho-physics and processed the case study of ten types of slope construction scene along the highway. The analysis was performed by the data obtained from the questionnaires and the photos for the slope construction scene. The questionnaires for analysis the image of the slope construction scene and their harmony with surrounding sceneries were designed using semantic differential scale and 5 point Likert-scale. The major findings were as follows. 1. At the part of the visual preferences analysis, the slope revegetation methods showed high level of preferences generally than on the slope structure methods. While the slope revegetation methods were estimated friendly, continuity, harmonious, soft, light and wide, the slope revegetation methods were estimated unstable, female, static, simple, omnipresent, appeared as policeman of weak inclination. Also the slope structure methods were estimated stable, manly, complicated, steep and healthy but rough, unharmonious, unfamiliar and heavy. 2. Psychological factors, related to the satisfaction for the slope revegetation methods were composed of three factors, aesthetic, individuality and physical character. And the slope structure methods were composed of five factors, aesthetic, individuality, stability, physical character, and complexity. 3. At the part of harmony with surrounding landscapes, the slope revegetation methods were evaluated highly but the slope structure methods received the lowest evaluation. Also the harmony analysis with surrounding view on the slope revegetation methods showed degree of high more than average in all texture, form, color and scale but the slope structure methods showed degree of fewer than average degree in form, scale, color and texture.