• Title/Summary/Keyword: Residual settlement

Search Result 73, Processing Time 0.028 seconds

Analysis of Residual Settlement of Concrete Track Roadbed for High-Speed Railway (고속철도 콘크리트궤도 토공노반의 잔류침하 분석)

  • Lee, Il-Wha;Lee, Sung-Jin;Kwon, Oh-Jung;Jeong, Uhn-Ghi
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.369-374
    • /
    • 2007
  • An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the analysis of the residual settlement measured data, test results and reference to understand the residual settlement behavior of concrete track roadbed

  • PDF

Study of Determination of Allowable Residual Settlement of Concrete Track Roadbed for High-Speed Railway (콘크리트궤도 토공노반의 허용잔류침하량 결정에 관한 연구)

  • Lee, Il-Wha;Yang, Shin-Chu;Jang, Seung-Yup
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1121-1125
    • /
    • 2007
  • An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the determination of the allowable residual settlement through various study to understand the residual settlement behavior of concrete track roadbed.

  • PDF

Residual Settlement Behavior in Soft Ground Improved by PBD during Operating Facilities (PBD공법이 적용된 연약지반에서 운용 중인 시설물의 잔류침하거동)

  • Kang, Gichun;Kim, Taehyung;Jeong, Choonggi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.8
    • /
    • pp.13-21
    • /
    • 2014
  • The Plastic Board Drain is used to improve soft soils deposited in container terminal area at a port. This paper describes settlement behavior of soft ground in this area from PBD installation to the time of operating facilities. Previous researches focused on soil improvement effect of PBD, that is, the settlement occurred during ground improvement period. The residual settlement occurred during operating the facility is very important from the maintenance and management point of view. However, the study of this residual settlement has been rarely conducted. In this study, by analyzing the measured settlement data obtained from the container terminal area at the port, it was verified that the residual settlement induced during operating facilities occurred in a layer with PBD improvement. In addition, by comparison the settlement predicted by a numerical analysis with the settlement measured in the field, it was confirmed that the actual settlement is in the range of predicted settlement.

A Study on the Compaction Characteristics of Crushed Rock-soil Mixture for Railway Subgrade (암버럭-토사 혼합성토재 철도노반의 다짐특성 연구)

  • Kim, Dae-Sang;Park, Seong-Yong;Song, Jong-Woo;Kim, Soo-Il;Song, Jae-Joon
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.183-189
    • /
    • 2009
  • The track structure of Gyungbu High Speed Railway line from Daegu to Busan is concrete track. It has a very strict specification for residual settlement because of its rigid type structural characteristics. The residual settlement of it comes from the residual settlement of the subgrade and the ground. The residual settlement of railway subgrade composed of crushed rock and soil might be major parts of total residual settlement depending on the field compaction qualities. Therefore, it is a key to minimize the residual settlement of the subgrade for a successful concrete track construction. In this paper, total 31 large scale compaction tests were performed to understand the compaction behaviors of the crushed rock-soil mixture. The test specimens were constituted with soil, crushed shale and mudstone taken from two sites under construction. The compaction tests were performed with the variations of rock types, #4 sieve passing contents, maximum particle size, and moisture contents. The influence of those factors on maximum dry unit weights of crushed rock-soil mixture was evaluated.

Evaluation of Foundation Settlement of Gyungbu High Speed Concrete Track Under Construction (건설 중인 경부고속철도 콘크리트궤도 기초침하 평가)

  • Kim, Dae-Sang;Yoo, Chung-Hyun;Kim, Hwan-Ki
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.365-370
    • /
    • 2007
  • Foundation settlements(settlements at the embankment surface and ground) has been evaluating to satisfy the strict allowable residual settlement level from the start of the construction of Gyungbu high speed railway. This is because both embankment and ground settlement could be important to minimize the residual settlement after the construction of concrete track. Ground settlement is caused by the increase of effective stress resulting from embankment. The causes of embankment settlement could be come from different sources, for example, the increase of effective stress, rainfall, creep behaviors. Based on the field measured data, this paper analysed the settlement of ground and embankment settlement. The biggest settlement at the embankment surface was 9.7mm during 246days at the STA 000k922.5. The calculated settlement of embankment itself was 8.6mm at the same places. These results conclude that the compressive settlement of embankment could not negligible.

  • PDF

Residual Settlement for Dredged Soil Deposit Considering Stress History in Incheon Area (인천지역 준설토의 응력이력을 고려한 잔류 침하량)

  • Chun, Byungsik;Lee, Inhoon;Park, Dukhyum;Sung, Hwadon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.2
    • /
    • pp.5-13
    • /
    • 2008
  • To identify the reclamation history formed by top dredged soil reclamation layer over the original ground, various field tests and laboratory tests were conducted. Especially when the original ground was not completely consolidated, CPTu test was carried out to calculate rational settlement due to the banking load. CPTu test results showed that the degree of consolidation of weak clay ground by dredged reclamation was on average 80%. As the research area was not completely consolidated by dredged reclamation in the past, the consolidation settlement should account for the residual settlement (20%) in the case of additional banking load. When the degree of consolidation of the original ground was not taken into account, the residual consolidation was expected in excessive settlement (up to 20%) and in such case PBD (Plastic Board Drain) was not effective in obtaining desired degree of consolidation.

  • PDF

Prediction of Residual Settlement of Ground Improved by Vertical Drains Using the Elasto-Viscous Consolidation Model - Application for Field Condition - (탄-점성 압밀이론에 의한 버티칼 드레인 타설지반의 잔류침하 예측 (II) - 현장조건에의 적용 -)

  • Baek, Won-Jin;Lee, Kang-Il;Kim, Woo-Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.85-95
    • /
    • 2007
  • In this study, in order to propose the prediction method of the residual settlement of clayey ground improved by vertical drains, a series of numerical analyses for a model ground were carried out using the elasto-viscous consolidation model. And the effects of ground improvement conditions of the ratio of effective radii $(r_e/r_w)$, consolidation pressure $({\Delta}p)$ on normally consolidated state, and the OCR (overconsolidation ratio) on overconsolidated state to reduce the residual settlement in three-dimensional consolidation by vertical drains were investigated by performing a series of numerical analyses. Furthermore, based on the results of a series of numerical analyses for the model ground, the predicting method of the residual settlement of clayey ground with vertical drains and the determination method of the value of OCR required to control the residual settlement within an acceptable value are proposed.

The Settlement Characteristics of Large Drilled Shafts Embedded into the Rocks (암반에 근입된 대구경 현장타설말뚝의 침하특성)

  • Hong, Won-Pyo;Yea, Geu-Guwen;Nam, Jung-Man;Lee, Jae-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.9-16
    • /
    • 2005
  • The purpose of this study is to investigate the settlement characteristics of large drilled shafts embedded into bed rocks. To perform this research, 35 pile load test results for the large drilled shafts are used, because these deep foundations generally used as substructure systems for grand bridges. In case of the yield load can not be easily determined by load(P)-settlement(S) curve from the pile load test at the maximum loads, the standard settlements which can determine a yield load is established. The residual settlement equation of pile embedded in gneiss and igneous rocks is presented in this study. Also a equation is proposed to characterize the relationship between loads and elastic settlements in pile load tests on the large drilled shaft embedded into bedrock. Then, large drilled shaft's settlement characteristics are examined on pile length, pile diameter and pile's socked depth into rock at the pile tip.

  • PDF

Reliability Analysis for Optimization of Construction Method of Drain Material (배수재 시공의 최적화를 위한 신뢰성 해석)

  • Ahn, Hyeon-Min;Kim, Moon-Chae;Kim, Daehyeon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.4
    • /
    • pp.87-96
    • /
    • 2014
  • In this paper, reliability analysis was done on the characteristics of consolidation and settlement for the inner temporary dike where a weak ground improvement construction was applied. When the consolidation analysis on the foundation ground was done, the following conclusions were obtained by conducting the stability analysis on the effect of space of drains, the effect of consolidation time, and the residual settlement and differential settlement. When construction was done with a drain space which satisfied 95% probability of reaching a target consolidation in each divided area, the occurrence of a residual settlement was within the range, which did not exceed 10cm. It was shown that there was almost no possibility of the occurrence of differential settlement, which was above the permissible differential settlement slope.

A Case Study on Soft Soil Treatment Design and Construction in Vietnam (베트남지역에서의 연약지반 개량 설계.시공 사례)

  • Yoon, Dong-Duk;Cho, Sung-Han;Seo, Won-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.336-345
    • /
    • 2010
  • GS E&C was awarded the contract for the construction of Hanoi - Hai Phong Expressway Package EX-7 from Station Km 72+000 to Station Km 81+300 in December 2008. This project is the $7^{th}$ contract package of the 105.5 km long expressway near Hai Phong city, which includes a FCM-styled bridge along with high embankments over soft ground. For these high embankments, there is a need to treat the soft soil for improving the overall stability during construction and for reducing the post-construction settlement of the expressway. The Designer of this project had adopted four (4) different types of ground improvement techniques to treat the soft ground, including the prefabricated vertical drains (PVD), sand drains (SD), pack drains (PD, or sometimes called packed sand drains), and sand compaction piles (SCP). The main focus of soft soil treatment should be paid attention to the residual settlement after construction. In current design, however, it appeared that the secondary compression (or creep) of the improved soil layer and the consolidation settlement of the lower untreated compressible soil layer have been neglected in the estimation of the post-construction settlement. These uncalculated residual settlements may not only unsatisfy the design criteria but also raise serious problems during service period of this expressway. In this paper, the subsoil condition and current design were reviewed focusing on the employed soft soil treatment method and expected residual settlement.

  • PDF