• Title/Summary/Keyword: Residual GWL

Search Result 2, Processing Time 0.016 seconds

A Case Study of Measuring Residual Groundwater Level on Reclaimed and Dredging Clay Layer (준설점토 지반상 잔류 지하수위의 계측 사례 연구)

  • Yang Tae-Seon
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.7
    • /
    • pp.63-72
    • /
    • 2005
  • Grounwater level applied on dredged and reclaimed clay layer was assumed to be the same value under design criterion as field test one, but actually differences are found through the monitoring test. In this study, a case study of measuring residual groundwater level is performed in ground improvement construction of Gwangyang container terminal and hinterland. With priority given to residual groundwater level measured during construction and management period of 9 years, it is investigated that residual groundwater level (R. GWL) could be applied reasonably to the design, construction, and use stages of the container harbor and land development.

Study on Constructibility considering Changes of Groundwater Level in Kwang Yang port (광양지역 지하수위 변화를 고려한 시공성에 관한 연구)

  • Kim, Byeong-Ho;Yang, Tae-Seon;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1120-1125
    • /
    • 2006
  • Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.

  • PDF