Study on Constructibility considering Changes of Groundwater Level in Kwang Yang port

광양지역 지하수위 변화를 고려한 시공성에 관한 연구

  • Kim, Byeong-Ho (Sekwang Engineering Consultants Co., Ltd.) ;
  • Yang, Tae-Seon (Dept. of Constructionl Information, Kimo College) ;
  • Lee, Song (Dept. of Civil Engineering, University of Seoul)
  • 김병호 ((주)세광종합기술단) ;
  • 양태선 (김포대학 건설정보과) ;
  • 이송 (서울시립대학교 토목공학과)
  • Published : 2006.03.24

Abstract

Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.

Keywords