• Title/Summary/Keyword: Residential Building Cost Index

Search Result 4, Processing Time 0.021 seconds

Case Study on Development of Residential Building Cost Index Compilation Model (주택원가지수 산정모델 작성 사례연구)

  • Cho Hun-Hee;Lee Yoo-Seob;Kang Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.220-226
    • /
    • 2003
  • The Residential Building Cost Index which presents price variation of construction resources required in a residential building project in single value, has been compiled to evaluate appropriate level of the price variation. This research reviewed the compilation methodology for Residential Building Cost Index based on comparative analysis on domestic statistics and proposed the Residential Building Cost Index through a variety of case studies. It would facilitate monitoring the price variation of a residential building cost and contributes to enhancing the applicability of construction cost data.

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

Evaluation on the Cooling Performance of Geothermal-energy Using Heat Pump System in Mixed-use Residential Building (주상복합 건축물에 적용된 지열이용 히트펌프 시스템의 냉방성능 평가)

  • Kim, Yong-Shik;Kim, Jung-Heon;Hwang, Kwang-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.4
    • /
    • pp.9-16
    • /
    • 2006
  • Geothermal-energy has been getting popular as a natural energy source for green buildings these days. Public building with gross area more than $3000m^2$, planned after March, 2005, should spend about 5% of total building cost for equipment run by natural energy source (e.g. geothermal, solar heat, solar power, etc) according to renewable energy promotion law in Korea. As a result geothermal-energy using heat pump system is emerging as a effective alternative for realistic and economic plan although design guidelines and construction code for the system is in progress and technical data is far from sufficient. The quantitative analysis on the performance of geothermal-energy using heat pump system is insufficient for appropriate design of it. In this paper, cooling performance of geothermal-energy using heat pump system of residential and retail etc. mixed-use building has been analyzed on the basis of temperature comparison between inlet and outlet of heat exchangers of the operating system. Additionally, dry-bulb temperature and relative humidity have been measured and analyzed together as an index of indoor thermal environment.

A Study on Business Value for the Creation of a Private Park regarding Long-term Non-executed Urban Parks - Focused on Long-term Non-executed Neighborhood Park in Gwangju Metropolitan City - (장기미집행 도시공원의 민간공원 조성을 위한 사업성 연구 - 광주광역시 장기미집행 근린공원을 중심으로 -)

  • Kim, Ho-Gyeom;Kim, Dong-Chan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.81-91
    • /
    • 2016
  • The study shows solutions of long-term unexecuted urban park and activation plans to facilitate the business promotion of Private Park Developers. This study conducted a feasibility analysis to determine if the business of a special case is applicable. The result of this study is as follows about three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park. First, the three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park are the forest type Neighborhood Parks. Businesses of a special case's park developing cost(average 0.4%) have a relatively low percentage. It is most affected by Land Compensation(average 33.8%) and building construction expenses(average 59.1%). Second, long-term unexecuted urban parks' Land Compensation and building construction expenses seed capital are excessive. The Bongsan Park balance floor space index is 179 percent; a reasonable profit floor space index is 220 percent. The Mareuk Park balance floor space index is 351 percent; a reasonable profit floor space index is 420 percent. The Jungoe Park balance floor space index is 327 percent; a reasonable profit floor space index is 400 percent. Third, to facilitate the business of special cases in deliberating, Bongsan Park should change its second class general residential area. Jungoe Park must change the quasi-residential area and semi-residential area. Mareuk Park must change the general commercial area. In this way, the feasibility of promoting private park projects will be improved.