• 제목/요약/키워드: Residential Building Cost Index

검색결과 4건 처리시간 0.018초

주택원가지수 산정모델 작성 사례연구 (Case Study on Development of Residential Building Cost Index Compilation Model)

  • 조훈희;이유섭;강태경
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.220-226
    • /
    • 2003
  • 주택원가지수는 주택건설사업에 투입되는 각종 자원들의 물가변동을 단일지수 형태로 표현한 자료로 이를 통하여 주택원가의 가격변동 수준에 대한 적정성을 판단할 수 있다. 본 연구에서는 국내 기초 통계자료에 대한 검토결과를 토대로 주택원가지수를 작성할 수 있는 방법을 검토하고 사례연구를 통하여 주택원가지수를 제시하였다 본 연구에서 제시한 지수를 활용함으로써 주택건설 원가의 변동을 용이하게 파악하며 공사비 실적자료의 활용성 제고를 위한 기반을 제공하고자 한다.

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

주상복합 건축물에 적용된 지열이용 히트펌프 시스템의 냉방성능 평가 (Evaluation on the Cooling Performance of Geothermal-energy Using Heat Pump System in Mixed-use Residential Building)

  • 김용식;김중헌;황광일
    • 한국태양에너지학회 논문집
    • /
    • 제26권4호
    • /
    • pp.9-16
    • /
    • 2006
  • Geothermal-energy has been getting popular as a natural energy source for green buildings these days. Public building with gross area more than $3000m^2$, planned after March, 2005, should spend about 5% of total building cost for equipment run by natural energy source (e.g. geothermal, solar heat, solar power, etc) according to renewable energy promotion law in Korea. As a result geothermal-energy using heat pump system is emerging as a effective alternative for realistic and economic plan although design guidelines and construction code for the system is in progress and technical data is far from sufficient. The quantitative analysis on the performance of geothermal-energy using heat pump system is insufficient for appropriate design of it. In this paper, cooling performance of geothermal-energy using heat pump system of residential and retail etc. mixed-use building has been analyzed on the basis of temperature comparison between inlet and outlet of heat exchangers of the operating system. Additionally, dry-bulb temperature and relative humidity have been measured and analyzed together as an index of indoor thermal environment.

장기미집행 도시공원의 민간공원 조성을 위한 사업성 연구 - 광주광역시 장기미집행 근린공원을 중심으로 - (A Study on Business Value for the Creation of a Private Park regarding Long-term Non-executed Urban Parks - Focused on Long-term Non-executed Neighborhood Park in Gwangju Metropolitan City -)

  • 김호겸;김동찬
    • 한국조경학회지
    • /
    • 제44권5호
    • /
    • pp.81-91
    • /
    • 2016
  • 이 연구는 장기미집행 도시공원의 해소와 활성화 방안으로 특례사업제도가 도입되었다. 민간공원추진자의 원활한 사업추진을 도모할 수 있도록 사업성 분석을 실시하여 특례사업 적용이 가능한지를 살펴보고자 하였다. 광주광역시 장기미집행 도시공원 3개소를 대상으로 사업성을 분석한 결과는 다음과 같다. 첫째, 분석대상의 광주광역시 장기미집행 3개소의 도시공원은 산림형 근린공원으로서, 특례사업의 공원조성비(평균 0.4%)가 차지하는 비율은 상대적으로 낮으나, 토지보상비(평균 33.8%)와 건물공사비(평균 59.1%)의 지출에 의해 사업수지에 많은 영향을 받는다. 둘째, 장기미집행 도시공원의 특례사업이 대규모 공원면적의 토지보상비와 건물공사비의 초기투입비가 과다하고, 장기간(5년 이상)에 걸친 회수 및 금융이자 등 시간의 경과를 감안하여 단순 비용편익보다는 순현가(NPV)를 적용하여 사업수지를 검토한 결과, 봉산공원은 순현가 기준 사업수지 균형 용적률은 179%, 적정이익 용적률은 220% 수준이며, 마륵공원은 균형 용적률 351%, 적정이익 용적률은 420%, 중외공원은 균형 용적률 327%, 적정이익 용적률은 400%이다. 셋째, 장기미집행 도시공원이 실효되기 전에 특례사업의 원활한 추진을 위해서는 광주광역시 도시계획위원회의 심의 시 비공원시설부지의 용도지역이 자연녹지지역에서 봉산공원은 제2종일반주거지역으로, 중외공원은 준주거지역으로의, 마륵공원은 일반상업지역으로 용도지역 변경이 이루어져야 민간공원추진자의 사업성 개선으로 사업추진이 가능한 것으로 나타났다.