• Title/Summary/Keyword: Reservoir water level

Search Result 478, Processing Time 0.029 seconds

Modeling of Water Circulation and Suspended Sediment Transport in Lake Daecheong (대청호내 흐름 및 유입 부유사 확산 모델링)

  • Jung Tae Sung;Hwang Jung Hwa
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.6 no.4
    • /
    • pp.67-82
    • /
    • 2003
  • A 2-dimensional hydrodynamic model has been applied to understand water circulation pattern in Lake Deacheong. The simulation results have been used in sediment transport modeling. A sediment transport model using a particle tracking method has been developed to simulate sediment transport in the ocean, river and reservoir. The model was applied to estimate transport track of particulate pollutants in the lake. The hydrodynamic model was verified for water level variations and showed good agreements. Through the results we found out that water velocity is less than 5 cnysec for mean yearly flow and more than 120 cnysec at some points for the simulated flood flow. The incoming sediment particles in flood season reached into the Daecheong Dam. But the incoming sediment particles in the mean flow were settled down at riverbed and didn't move into the dam. These results can be used in setting up water quality management plan in the lake.

  • PDF

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

Accuracy Improvements of DAM-Reservoir Storage Volume Estimation based on GIS (GIS기반에서 댐 저수량 산정의 정확도 향상)

  • Jeong, InJu;Moon, DooYoul;Jung, BeomSeok
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.136-144
    • /
    • 2005
  • GIS analyzes various topographic feature in three dimensions using triangulated irregular network (TIN). This paper proposed a method that can analyze topographic features effectively in three dimensions. Method developed in this study can calculate earth-volume, the inundation volume, storage volume etc, effectively. We could reduce error than existing volume calculation methods in computing volume in addition to water level's change about each. Also, the develop method can improve accuracy in measuring the storage of reservoirs. Main result of this paper id to develop a efficient calculation method using contour and elevation data on digital map.

  • PDF

Flow analysis of the Sump Pump (흡수정의 유동해석)

  • Jung, Han-Byul;Noh, Seung-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.673-680
    • /
    • 2017
  • sump pump is a system that draws in water that is stored in a dam or reservoir. They are used to pump large amounts of water for cooling systems in large power plants, such as thermal and nuclear plants. However, if the flow and sump pump ratio are small, the flow rate increases around the inlet port. This causes a turbulent vortex or swirl flows. The turbulent flow reduces the performance and can cause failure. Various methods have been devised to solve the problem, but a correct solution has not been found for low water level. The most efficient solution is to install an anti-vortex device (AVD) or increase the length of the sump inlet, which makes the flow uniform. This paper presents a computational fluid dynamics (CFD) analysis of the flow characteristics in a sump pump for different sump inlet lengths and AVD types. Modeling was performed in three stages based on the pump intake, sump, and pump. For accurate analysis, the grid was made denser in the intake part, and the grid for the sump pump and AVD were also dense. 1.2-1.5 million grid elements were generated using ANSYS ICEM-CFD 14.5 with a mixture of tetra and prism elements. The analysis was done using the SST turbulence model of ANSYS CFX14.5, a commercial CFD program. The conditions were as follows: H.W.L 6.0 m, L.W.L 3.5, Qmax 4.000 kg/s, Qavg 3.500 kg/s Qmin 2.500 kg/s. The results of analysis by the vertex angle and velocity distribution are as follows. A sump pump with an Ext E-type AVD was accepted at a high water level. However, further studies are needed for a low water level using the Ext E-type AVD as a base.

A Study on the Forest Vegetation and Soil-environmental Factors Affecting the Water Quality of Iwonch on Stream (이원천 수질에 미치는 삼림식생과 토양환경요인)

  • Bang, Je-Yong;Yang, Keum-Chul
    • Korean Journal of Environmental Biology
    • /
    • v.27 no.2
    • /
    • pp.183-190
    • /
    • 2009
  • Characterization of the analysis of forest vegetation, soil environmental conditions and water quality were performed from March 2003 to March 2007. The two basins were characterized by cultivated area (Kaesim reservoir) and mountain area (Jangchan reservoir), and divided into eleven small basins, where dynamics of pollutants, forest vegetation and soil environmental conditions were surveyed. The vegetation can be divided into 10 types by $Z\ddot{u}rich$-Montpellier school's method. Pearson coefficients between vegetation type and water quality were correlated with dissolved oxygen (DO) in the Quercus variabilis community at the 5% level and total phosphorus (TP) in the Larix leptolepis plantation at the 1% level. Especially total phosphorous and total nitrogen increased in small basins where the proportion of cultivated and residential area increased. The analysis of influences of pollutant discharge on water quality showed that pollutant charge was very low in forest land area ($Y_{T-P}$=-0.0017X+0.2215, r=0.16, $Y_{COD}$=- 0.0395X+8.5051 r=0.47). The soil types of western area were comparatively simple, but those of eastern area were complicated with regosols, red-yellow soils, lithosoles, etc. The pH, total solid (TS) and volatile substance (VS) of the forest and agricultural land soils collected in each site were 5.4~6.9, 75.8~80.2%, and 3.80%~5.80%, respectively. According to the analytical result of soil environmental conditions, heavy metal contents fell short to the mean value of natural conditions. Runoff amount (Y) and depth of topsoil (X) were negatively correlated, $Y_{ron}=-1.0088X_{top}+35.378$ (r=0.68). The correlation was much lower in up-stream but much higher in down-stream, because permeation into soil particle was larger on down-stream due to its more or less gentle slope. Pearson coefficients between soil pH and water pH were statistically significant at 1% level.

A Two-dimensional Hydraulic Analysis Considering the Influence of River Inflow and Harbor Gate in the Bay (Harbor Gate와 유입하천의 영향을 고려한 만내의 2차원 수리해석)

  • Lee, Jae Joon;Lee, Hoo Sang;Shim, Jae Sol;Yoon, Jong Ju
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.1
    • /
    • pp.45-55
    • /
    • 2015
  • In this study, when seawall or harbor gate is installed for coastal disaster prevention, a two-dimensional water analysis in the bay is carried out to consider the flood amount of river inflow and effect of harbor gate. The Yeongsan river and the port Mokpo area are selcected for the study region. Then, by analyzing the hydraulic characteristics of flood flow of the Yeongsan river, we analysed the compatibility of the results in the two-dimensional hydrodynamic model. A tw-odimensional water analysis were conducted for the four cases considering whether a harbor gate is installed or not, and whether the inland water boundary condition is considered or not, also with open sea boundary condition. The results of the two-dimensional water analysis shows that water level change near the port Mokpo area is mainly caused by the discharge of the estuary barrage of the Yeongsan river because the harbor gate was installed. In addition, it is revealed that the volume of reservoir created by the harbor gate and the estuary barrage is too much small compared to the volume of the discharge from the Yeongsan river. Therefore, when the harbor gate is installed in the open sea, we concluded that a flexible management between the harbor gate and the estuary barrage of the Yeongsan river is required. A initial water level of the bay and outflow from the harbor gate are proposed for disaster prevention in the coastal area of port Mokpo.

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.41-50
    • /
    • 2004
  • The objective of this study is to investigate the feasibility of the developed Fuzzy control techniques in dam operation. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in the view of flood control and disaster prevention. The three models developed in this study determine the outflows based on the two conditions the first one is to consider only two inputs such as reservoir water level and inflow, for operation of the existing situations, the second one is that the possible maximum discharge from each dam does not exceed the allowable design maximum discharge for disaster prevention in downstream area. As the results, it was shown that the suggested models based on Fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with the historical operation results.

A Study on Long-Term Seepage Behaviour of Fill Dam by the Monitoring Data Analysis (계측자료 분석에 의한 필댐의 장기 침투거동 연구)

  • Chung, Kyujung;Lee, Song
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.9
    • /
    • pp.15-25
    • /
    • 2010
  • The main objective of this study was to offer informations about long-term seepage behavioral characteristics and to find a leakage safety management method for Juam Dam and Imha Dam, a central cored rockfill dams in Korea by the evaluating the automatically monitored leakage data. In the water leakage monitoring of fill dam, the generation of abnormal water leakage is difficult to directly detect due to the effect of outside factors such as the component of rainfall inherent in the observation value. Therefore, conventionally estimation methods of water leakage quantity were applied by multiple regression analysis considering reservoir water level, rainfall, etc.. However, the estimated error of rainfall component is relatively big in these method. This paper identifies the seepage characteristic of each dams which is not directly affected by rainfall through the hydrograph separation analysis and 3 dimensional analytical method, and thinks a leakage management method. It was noticed that two dams had site specific seepage behaviour features and were in stable state with the decreasing leakage quantity. It was also found that hydrograph separation method might be applicable to leakage safety management method.

Calibration of the WASP4 Model Applied to Lake Paldang (WASP4 모형의 매개변수 추정 - 팔당호(八堂湖)를 중심으로 -)

  • Cho, Hong Yeon;Jun, Kyung Soo;Lee, Kil Seong;Han, Kwang Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.4
    • /
    • pp.177-188
    • /
    • 1993
  • Model parameters of the WASP4 applied to Lake Paldang were estimated. The methodology is based on grouping water quality constituents and relevant parameters and successively estimating each group of parameters by a trial-and-error procedure. Chlorophyll a, nitrogen cycles, phosphorus cycles, BOD and DO were simulated at the complexity level 4. A water budget analysis using the monthly records of reservoir inflows and outflows in 1989 and 1990 was made to determine seasonally-averaged flowrates at model boundaries. Estimated flowrates were used, together with the seasonal average of water quality measurements in 1989 and 1990 for the calibration and verification, respectively, of the model. Grouping water quality constituents and associated parameters proved to be efficient in estimating a number of model parameters. From the results of model calibration and verification, it was found that quantitative evaluations of nonpoint and benthic sources of organic matters are essential. Benthic sources near the entrance of the Kyeongancheon were the most significant.

  • PDF

Optimum Size Analysis for Dam Rehabilitation Using Reliability Analysis (신뢰성 분석을 통한 기존 댐 재개발의 적정규모 결정의 관한 연구)

  • Kwon, Hyun-Han;Moon, Young-Il;Choi, Byung-Gyu;Yoon, Yong-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.2
    • /
    • pp.97-110
    • /
    • 2005
  • This paper presents a procedure of evaluation of reservoir capacity for additional water storage for dam rehabilitation. One of the techniques on the extension of rainfall has been developed, and the daily stream flows were simulated by the NWS-PC long-term rainfall-runoff model with the input of the extended daily rainfall which was stochastically generated by the nonhomogeneous markov chain model. We peformed a reliability analysis to Guisan dam about the optimal capacity of dam rehabilitation by using performance criteria that Hashimoto et al. (1982) presented. We estimated that the most suitable water level is approximately 155EL.M. suggested that this method can use supplemental methods to estimate optimum dam scale.