• Title/Summary/Keyword: Reservoir plan

Search Result 145, Processing Time 0.039 seconds

hydraulic-power generation of electricity plan of multi-Purpose dam in electric Power system (전력계통에서의 다목적댐 수력발전계획)

  • Kim, Seung-Hyo;Ko, Young-Hoan;Hwang, In-Kwang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1248-1252
    • /
    • 1999
  • To provide electricity power of good quality, it is essential to establish generation of electricity plan in electric power system based on accurate power-demand prediction and cope with changes of power-need fluctuating constantly. The role of hydraulic-power generation of electricity in electric power system is of importance because responding to electric power-demand counts or reservoir-type hydraulic-power generation of electricity which is designed for additional load in electric power system. So hydraulic-power generation of electricity must have fast start reserve. But the amount of water, resources of reservoir-type hydraulic-power generation of electricity is restricted and multi-used, so the scheduling of management by exact forecasting the amount of water is critical. That is why efficient hydraulic-power generation of electricity makes a main role on pumping up the utility of energy and water resource. This thesis introduced the example of optimal generation of electricity plan establishment which is used in managing reservoir-type hydraulic-power generation of electricity.

  • PDF

Evaluation of Flood Control Capacity for Seongju Dam against Extreme Floods (이상강우에 대비한 성주댐의 홍수조절 능력 분석)

  • 권순국;한건연;서승덕;최혁준
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.6
    • /
    • pp.109-118
    • /
    • 2003
  • As a fundamental research to establish a safety operation plan for irrigation dams, this study presents hydrologic analysis conducted in Sungju Dam watershed based on various rainfall data. Especially those reservoirs without flood control feature are widely exposed to the risk of flooding, a safe and optimized operation program need to be improved against arbitrary flooding. In this study, reservoir routing program was developed and simulated for reservoir runoff estimation using WMS hydrology model. The model simulated the variations of reservoir elevation under the condition of open or closed emergency gate. In case of closed emergency gate, water surface elevation was given as 193.15 m, and this value exceeds the dam crest height by 1.65 m. When the emergency gate is open, the increment of water surface elevation is given as 192.01 m, and this value exceeds dam crest height by 0.57 m. As an alternative plan, dam height increase can be considered for flood control under the PMP (Probable Maximum Precipitation) condition. Since the dam size is relatively small compare to the watershed area, sound protection can be expected from the latter option rather than emergency gate installation.

Prediction of sediment flow to Pleikrong reservoir due to the impact of climate change

  • Xuan Khanh Do;ThuNgaLe;ThuHienNguyen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.38-38
    • /
    • 2023
  • Pleikrong reservoir with a concrete gravity dam that impound more than 1 billion cubic meter storage volume is one of the largest reservoir in Central Highland of Vietnam. Sedimentation is a major problem in this area and it becomes more severe due to the effect of climate change. Over time, it gradually reduces the reservoir storage capacity affecting to the reliability of water and power supply. This study aims to integrate the soil and water assessment tool (SWAT) model with 14 bias-corrected GCM/RCM models under two emissions scenarios, representative concentration pathway (RCP) 4.5 and 8.5 to estimate sediment inflow to Pleikrong reservoir in the long term period. The result indicated that the simulated total amount of sediment deposited in the reservoir from 2010 to 2018 was approximately 39 mil m3 which is a 17% underestimate compared with the observed value of 47 mil m3. The results also show the reduction in reservoir storage capacity due to sedimentation ranges from 25% to 62% by 2050, depending on the different climate change models. The reservoir reduced storage volume's rate in considering the impact of climate change is much faster than in the case of no climate change. The outcomes of this study will be helpful for a sustainable and climate-resilient plan of sediment management for the Pleikrongreservoir.

  • PDF

Estimation of Reservoir Sediment Deposition Using Two Dimensional Model (2차원 모형을 이용한 저수지 퇴사량 예측)

  • Lee, Wonho;Kim, Jingeuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.5
    • /
    • pp.21-27
    • /
    • 2008
  • The Sediment deposits in rivers and reservoirs are major components interfering with the useful function of the reservoirs, and clogging the inlet port at water intakes in rivers and erosion of pump impellers. Therefore, an accurate estimation method of sediment deposition is requisite to the efficient water resources investigation, planning and management. The objective of this paper is to forecast of reservoir sediment deposition using two dimensional model (SMS) to UnMun reservoir in GyeongSangBukDo. The RUSLE model showed that reservoirs volume was decreased $2,084.09{\times}10^6m^3$ after 50 years and $2,196.65{\times}10^6m^3$ after 100 years, which is plan flood level elevation (EL.152.12 m) reservoir. The two dimensional model showed that reservoirs volume was decreased $2,227.41{\times}10^6m^3$ after 50 years and $2,121.47{\times}10^6m^3$ after 100 years, which is plan flood level elevation (EL.152.12 m) reservoir. The results of this application showed that the use of two dimensional model was very effective for the estimation sediment deposits throughout the reservoir.

  • PDF

Study on Selection Criteria of Small-Scales Reservoirs for Emergency Action Plan(EAP) Establishment (소규모 저수지 대상 비상대처계획 수립 선정기준 연구)

  • Park, Ki-Chan;Choi, Kyung-Sook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.3
    • /
    • pp.101-112
    • /
    • 2019
  • This study developed selection criteria of small-scales reservoirs, having under $300,000m^3$ storage capacity, for the Emergency Action Plan(EAP) establishment in order to reduce the disaster risks of the reservoir's failures. Those reservoirs are out of ranges of Korean EAP establishment standard, but have potential risk of disasters as they have often failed by the recent extreme rainfall events and earthquakes, causing economical and life losses. The problem of reservoir aging is also one of the reasons of them. In this study, the developed selection criteria of small reservoirs for EAP establishment are storage capacity, embankment height, reservoir age, heavy rain factor and earthquake factor. These criteria were selected based on the review of the existing EAP establishment guidelines, analysis of the past dam failure cases, and the previous related studies. The quantification of these criteria were conducted for the practical applications in the fields, and applied to 67 previous failures in order to investigate the relation of each criteria with these failures. The earthquake factor found to be the highest relations followed by heavy rain factors, combination of earthquake and heavy rain factors, and reservoir age. The classification was made as observation and review groups for EAP establishments based on overlapping numbers of each criteria. This classifications applied to 354 reservoirs designated as having the potential disaster risk by MOIS, and showed 38.4% of observation and 11.9% of review groups. Anticipatory monitoring and regular inspection should be made by professional facility managers for the observation group, and necessity of EAP establishment should be assessed for the review group based on the downstream status and financial budget.

Evaluation of Eutrophication and Water Quality in Kumoh Reservoir (금오지의 수환경 및 부영양화 평가)

  • Park, Je Cheol;Kim, Dong Seop;Lee, Seung Hwan
    • Journal of Environmental Science International
    • /
    • v.13 no.4
    • /
    • pp.389-401
    • /
    • 2004
  • Seasonal and vertical distribution of water quality were investigated from May 2001 to June 2002 in Kumoh reservoir located nearby Kumi City, Kyungpook. Kumoh reservoir that lost the role of agricultural irrigation is currently of rapid eutrophication. The vertical distribution of DO was observed clinograde with hypolimnetic anoxic zone. T-P concentrations at the surface ranged from 0.008 to 0.152 mgP/L and T-N concentrations ranged from 1.4 to 3.0 mgN/L. The vertical and seasonal variation of T-N was smaller than T-P. DOC concentrations, indicator of organic matter pollution, ranged from 2.8 to 5.4 mgC/L. Apportionment of Total-DOC (T-DOC) indicated that 14% of T-DOC was attributed to Labile-DOC(L-DOC) and the rest was due to Refractory-DOC(R-DOC). The values of TSI(Trophic State Index) ranged between 44 and 52 indicating that Kumoh reservoir is under mesotrophic condition. The results of this study indicate that Kumoh reservoir is likely to be under influence of eutrophication and thus water quality will be aggravated. Therefore, the Kumoh reservoir requires further treatment to improve water quality and a plan of the reusing water resource should be developed.

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed (황룡강 유역 저수지군 하류하천 영향평가)

  • Hwang, Soon-Ho;Kang, Moon-Seong;Kim, Ji-Hye;Song, Jung-Hun;Jun, Sang-Min;Lee, Sang-Hyun;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

Ranking the Pareto-optimal Solutions using DEA-based Ranking Procedure: an Application to Multi-reservoir Operation Problem (DEA기반 순위결정 절차를 이용한 파레토 최적해의 우선순위 결정: 저수지군 연계 운영문제를 중심으로)

  • Jeon, Seung-Mok;Kim, Jae-Hee;Kim, Sheung-Kown
    • IE interfaces
    • /
    • v.21 no.1
    • /
    • pp.75-84
    • /
    • 2008
  • It is a difficult task for decision makers(DMs) to choose an appropriate release plan which balances the conflicts between water storage and hydro-electric energy generation in a multi-reservoir operation problem. In this study, we proposed a DEA-based ranking procedure by which the DM can rank the potential alternatives and select the best solution among the Pareto-optimal solutions. The proposed procedure can resolve the problem of mix inefficiency that may cause errors in measuring the efficiency of alternatives. We applied the proposed procedure to the multi-reservoir operation problem for the Geum-River basin and could choose the best efficient solution from the Pareto-set which were generated by the Coordinated Multi-Reservoir Operating Model.