• Title/Summary/Keyword: Reservoir operation method

Search Result 117, Processing Time 0.023 seconds

Reservoir Operation at Flood Time by Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) (저수지 홍수변환법에 의한 홍수시 저수지 운영)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.105-113
    • /
    • 1998
  • Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This study is concerned with reservoir operation and discusses general reservoir operation at flood time. Flood control has problems such as the uncertainty of hydrologic models. technical limitations and some constraints. Therefore, we may prepare the quantitative flood control methods based on the assured flood control storage for reservoir operation. Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) is a procedure which determines the adequate releases with considering dam safety for flood inflows over non-damaging discharge. Based on the TRF ROM which was explained in our published paper. the study discusses the TRF ROM with additional investigations and the general reservoir operation rules at flood time.

  • PDF

Optimal Reservoir Operation Models for Paddy Rice Irrigation with Weather Forecasts (II) -Model Development- (기상예보를 고려한 관개용 저수지의 최적 조작 모형(II) -모형의 구성-)

  • 김병진;박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.36 no.2
    • /
    • pp.44-55
    • /
    • 1994
  • This paper describes the development of real-time irrigation reservoir operation models that adequately allocate available water resources for paddy rice irrigation. Water requirement deficiency index(WRDI) was proposed as a guide to evaluate the operational performance of release schemes by comparing accumulated differences between daily release requirements for irrigated areas and actual release amounts. Seven reservoir release rules were developed, which are constant release rate method (CRR), mean storage curve method(MSC), frequency analysis method of reservoir storage rate(FAS), storage requirement curve method(SRC), constant optimal storage rate method (COS), ten-day optimal storage rate method(TOS), and release optimization method(ROM). Long-term forecasting reservoir operation model(LFROM) was formulated to find an optimal release scheme which minimizes WRDIs with long-term weather generation. Rainfall sequences, rainfall amount, and evaporation amount throughout the growing season were to be forecasted and the results used as an input for the model. And short-term forecasting reservoir operation model(SFROM) was developed to find an optimal release scheme which minimizes WRDIs with short-term weather forecasts. The model uses rainfall sequences forecasted by the weather service, and uses rainfall and evaporation amounts generated according to rainfall sequences.

  • PDF

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Operation rule curve for supplying urban instream flow from reservoir (도시 하천유지유량 공급의 저수지 운영 방법)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.163-172
    • /
    • 2011
  • To provide the operation rule curve for suppling instream flow to urban stream from reservoir, the Soho reservoir with watershed area of 7.4 $km^2$ and total water storage of 2.58 $Mm^3$ was planned at the headwaters of the Daejeoncheon. Daily streamflow was simulated and using the simulated streamflow and desired instream flow, the operation rule curve by Senga method was drawn and evaluated through reservoir operation. Senga method is derived by accumulating the differences between streamflow and desired instream flow adversely. Water storages were simulated on a daily basis to supply urban instream flow from Soho reservoir, but the amount of supplying instream flow to urban stream was not nearly increased comparing with that of normal operation that does not used the rule curve. Thereafter the new simulation-based operation rule curve was derived and applied to supply instream flow from Soho reservoir. In normal operation, the amount of instream flow was shown to 15,000 $m^3$/d, but it was increased to 27,700 $m^3$/d in withdrawal limited operation using the new derived rule curve, in which the applicability of this rule curve was proved. Also comparing with the flow duration curves at station just before urban Daejeoncheon stream without and with upstream Soho reservoir, the 95th flow was decreased from 1.64 mm/d to 1.51 mm/d, and the 355th flow was increased from 0.17 mm/d to 0.30 mm/d. Monthly streamflows during October to March were increased from 10.6~24.1 mm to 24.1~34.0 mm with the increasing rate of 141~227%.

Analysis of Operation Plan by Multipurpose Supply for Heightened Agricultural Reservoir (둑높임저수지 다중용수공급에 따른 운영 방안 분석)

  • Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).

  • PDF

An Efficient Management of Sediment Deposit for Reservoir Long-Term Operation (1) - Reservoir Sediment Estimation (저수지 장기운영을 위한 퇴적토사의 효율적 관리(1) - 저수지 퇴사량 산정)

  • Ahn, Jae Hyun;Jang, Su Hyung;Choi, Won Suk;Yoon, Yong Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1088-1093
    • /
    • 2006
  • In this study, the method of annual sediment estimation for reservoir long-term operation is proposed. Long-term daily precipitation and evaporation are predicted by Markov Chain. Using these values, reservoir inflow is simulated by NWS-PC model. Reservoir sediment load is estimated by sediment rating relation curve which is observed. From the simulation results, it was found that each simulated value by Markov Chain and NWS-PC was well compared to the observed ones and also estimated reservoir sediment was appropriate to the compared values using empirical equations. It is thought that the proposed method for estimation of reservoir sediment can be useful used to operate the reservoir.

An Efficient Management of Sediment Deposit for Reservoir Long-Term Operation (2) - Sediment Distribution and Reduction Method in Reservoir (저수지 장기운영을 위한 퇴적토사의 효율적 관리(2) - 저수지 퇴사분포 및 저감방안)

  • Ahn, Jae Hyun;Jang, Su Hyung;Choi, Won Suk;Yoon, Yong Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1094-1100
    • /
    • 2006
  • In this study, the reservoir sediment reduction methods for long-term operation are proposed by the analysis of both sediment deposit characteristics and sediment reduction effect by each method. To that end, a flowchart for sediment analysis in reservoir is established and sediment deposit is simulated by SMS-SED2D model. The sediment reduction methods which are sediment passing (sluicing), flushing, trapping, bypassing and mechanical removal are used. From the simulation results, the effective method for sediment reduction is operation which is coupled by both sediment passing with sand gate and sediment trapping with debris dam. And If sediment flushing will be used once a year after 50 years, conservation storage can be secured until 100 years after dam construction.

A study on the measures to use Gunnam flood control reservoir through a reservoir simulation model (저수지 모의 모형을 통한 군남홍수조절지의 활용방안에 관한 연구)

  • Yang, Wonseok;Ahn, Jaehwang;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.6
    • /
    • pp.407-418
    • /
    • 2017
  • Due to geographical features of being close to DPRK (Democratic People's Republic of Korea), the Imjin River basin has difficulties in hydrological observation, and is vulnerable to unexpected flood occurrence. As a countermeasure, Gunnam Flood Control Reservoir construction was planned in 2005. Despite such a structural measure, damages by DPRK's illegal release continues to occur. Futhermore the Imjin River's flow has been decreased due to the effect of continuous drought in the Korean Peninsula since 2012 and DPRK's unilateral storage of water. A new operation method is derived for the Gunnam Flood Control Reservoir in order to cope with drought damages on the Imjin River basin and to ensure efficient response time upon flooding. The operation method maintaining Gunnam Flood Control Reservoir's water level by raising from EL.23.0 m to EL.31.0 m during the flood season for securing reservoir capacity enables to secure additional $14,000,000m^3$ water compared to the existing operation methods. The operation method to store inflow by controlling release to $250m^3/s$ in the early stage of flood has increased 2.66% on average in terms of detention effect of reservoir compared to the existing operation methods. The method enables to secure 19 hours to prepare flood compared to the existing methods.

A Study on the Determination of Water Storage-Supply Capacity of Agricultural Reservoir (소규모 농업용 저수지의 저류량-용수공급능력 결정에 관한 연구)

  • 안승섭;정순돌;이증석;윤경덕;장인수
    • Journal of Environmental Science International
    • /
    • v.11 no.12
    • /
    • pp.1217-1226
    • /
    • 2002
  • This study aims at the effective estimation of water supply capacity of small scale reservoir and the proposal of the data which is necessary to establish the water resources management plan of down stream area of the reservoir in the future by comparison and examination about reservoir operation technique for the security of agricultural water in small scale reservoir. The result of flow calculation by Tank model is used for the input data as the inflow data which is needed for the analysis of water supply capacity. Stochastic method, simulation method, and optimization method are used to examine the water supply capacity, and water security amount is compared with each method. From the analyses of water supply capacities by each method, slightly different results are shown in spite of the effort to compare them equally using input data such as inflow data under equal conditions, and the comparison of water supply capacities by each method are as follows; linear planning method, simulation method, and transition probability matrix method in the order of amount from the largest. It is thought that the simulation method in which comparatively reasonable application of the inflow data is possible and is simulated in successive time series dam operation of the three methods used in this study thus, simulation model is proper to estimate the water supply capacity of agricultural small scale reservoir. And it is judged that the heightening of efficiency of water resources utilization according to the development of downstream area of dam may be possible using the upward readjusted water supply amount of $55.18{\tiems}10^6ton$ and $63.7{\times}10^6ton$ at 95% and 90% supply reliability respectively which are above the planning water supply amount of $50.0{\times}10^6$ton when the simulation method is introduced as the standard.

A Study on Releases Determination Scheme for a Forecasted Flood (예측홍수의 방류량 결정방안에 관한 연구)

  • Kwon, Oh-Ig;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.3
    • /
    • pp.257-268
    • /
    • 1997
  • Reservoir operators and managers need to present a rational basis of determining releases for a flood event. This study divides a forecasted flood hydrograph by two parts on the basis of non-damaging discharge, which consists of one part con,trolled by non-damaging discharge and another controlled by using flood control storage of the reservoir. In case of using flood control storage, a new reservoir operation method. called TRF (Transformed Reservoir Flood) ROM, is suggested for the operating rules during a flood to consider the reservoir security as well as the operational efficiency. This paper presents an application of the methodology to the operation of a single multipurpose reservoir at the Taechong Dam during flood and the results analyzed.alyzed.

  • PDF