• Title/Summary/Keyword: Reservoir facility

Search Result 87, Processing Time 0.025 seconds

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF

Assessment of Tubid Water Discharge Capacity with Selective Withdrawal Facility in the Imha Reservoir (임하호 선택취수시설의 탁수배제 효과분석)

  • Lee, Sang-Uk;Kim, Jeong-Kon;Noh, Joon-Woo;Kim, Dae-Hee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1383-1386
    • /
    • 2007
  • 하절기 고탁수로 문제가 되고 있는 임하호에 원활한 탁수배제를 위하여 선택취수시설이 설치되어 2006년 운영되었다. 본 연구는 이러한 선택취수시설에 대한 효과를 분석하기 위하여 CE-QUAL-W2 모형을 이용하여 호내의 탁수 분포를 분석하고 보정된 모형을 이용하여 선택취수와 표면취수(표층${\sim}7\;m$)에 따른 탁수의 저감효과에 대한 분석을 수행하였다. 임하댐 유입부의 탁도 자동 측정 시스템에서 측정된 수온 및 탁도자료를 입력자료로 사용하였고, 모형의 호내의 4개지점의 수심별 자료에 대하여 보정을 실시하였다. 보정결과 관측값과 비교에서 절대 평균 오차(RMSE)는 5.2로 산정되었으며 수심별 수온 및 탁도 분포와 최고 탁도층이 발생하는 수심을 적절히 모의하였다. 선택취수시설을 적용한 경우 표면취수의 경우와 비교해서 100 NTU 이상의 고탁수층에 대해서는 (1) 호내의 탁수량이 $35\;Mm^3$이상이 저감되는 것으로 나타났고, (2) 고탁수의 방류량이 3배이상 증대되는 것으로 나타났다. 선택취수는 표면취수에 비해 고탁수층의 배제에 효과적이며 취수구의 위치 변경등 지속적인 관리를 통하여 효율적인 운영이 가능할 것으로 판단된다. 또한, 효과분석 결과를 바탕으로 시설에 대한 운영방안을 수립할 수 있을 것으로 기대된다.

  • PDF

Operating Conditions for Minimization of DBPs (Disinfection by-Products) in Drinking Water Supply System (소독부산물 최소화를 위한 운영조건 연구)

  • Shin, Hyung-Soon;Choi, Phil-Kweon;Kim, Jong-Su;Choi, Ill-Woo;Kim, Sang-Hoon;Kim, Tae-Hyun;Lee, Kyung-Hee;Lee, Soo-Moon;Jang, Eun-Ah;Jung, Yeon-Hoon;Kim, Jung-Yeol
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.3
    • /
    • pp.330-337
    • /
    • 2005
  • This study was carried out to propose the managemental improvement of the purification plants and the distribution facilities which can minimize the formation of disinfection by-products in drinking water distribution system. The disinfection by-products were highly created in the water treatment plant that the organic matters were high and the chlorine dosage was excessive. The concentration of DSPs was shown the highest value in August and the lowest value in December, because of temperature and pre-chlorine dosage effect. From the result of tracer test, the travel time from the treatment plant to the end of pipeline was around 3-4 days in summer, 5-6 days in winter, respectively, and the DSPs concentration of the reservoir(end of pipe) was 2-3 times higher than that of the beginning point. The improvement of the chlorination process and structural reformation of distribution facility was demanded to minimize the DSPs increase from purification plant to the end of pipe.

Operating Status and Improvement Plans of Ten Wetlands Constructed in Dam Reservoirs in Korea (국내 10개 댐저수지 인공습지의 운영현황 및 개선방안)

  • Choi, Kwangsoon;Kim, Sea Won;Kim, Dong Sup;Lee, Yosang
    • Journal of Wetlands Research
    • /
    • v.16 no.3
    • /
    • pp.431-440
    • /
    • 2014
  • To propose the improvement and management plans to strengthen the pollutant removal efficiency of dam reservoir's constructed wetlands(CWs), the operation status and configuration of CWs (including water depth, operational flow, water flow distribution, residence time, and pollutant removal efficiency, aspect ratio, open water/vegetation ratio etc.) were analyzed in 10 major wetlands constructed in dam reservoirs. The pollutant concentrations in the inflows of the studied CWs were lower than those of American and European constructed wetlands. Especially, organic matter concentrations in all of inflows were below 3 mg/L(as BOD) due to advanced treatment of sewage disposal plant and an intake of low concentration water during dry and normal seasons. The average removal efficiency of total nitrogen(TN) and total phosphorus(TP) for 10 CWs ranged from 7.6~67.6%(mean 24.9%) and -4.9~74.5%(mean 23.7%), respectively, showing high in wetlands treating municipal wastewater. On the other hand, the removal efficiency of BOD was generally low or negative with ranging from -133.3 to 41.7%. From the analysis of the operation status and configuration of CWs, it is suggested that the low removal efficiency of dam reservoir's CWs were caused by both structural (inappropriate aspect ratio, excessive open water area) and operational (neglecting water-level management, lack of facilities and operation for first flush treatment, lake of monitoring during rainy events) problems. Therefore, to enable to play a role as a reduction facility of non-point source(NPS) pollutants, an appropriate design and operation manuals for dam reservoir's CW is urgently needed. In addition, the monitoring during rainy events, when NPS runoff occur, must be included in operation manual of CW, and then the data obtained from the monitoring is considered in estimation of the pollutant removal efficiency by dam reservoir's CW.

A Scheme of Effective Water Quality Management on Lake Okjeoung (옥정호의 효율적인 수질관리방안)

  • Lee, Yo-Sang;Kim, U-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.5
    • /
    • pp.487-497
    • /
    • 2001
  • Investigated data on Lake Okjeong were used for the simulation of water quality. According to the simulation results, the effective scheme of water quality management on reservoir has been proposed. It has been recognized that the water quality of Lake Okjeong is under eutrophic and mesotrophic condition even though there are seasonal variation. The water quality of lake is mainly affected by the inflow of pollutant load from watershed. Therefore, to estimate and quantify the accurate amounts of pollutants flowing into reservoir is absolutely necessary for the effective management of water quality on Lake Okjeong. When the pollutant load measured during 7 different rainy periods in 1999 was compared with total pollutant load in 1999. TN and TP measured during 7 different rainy periods showed almost 50% of total pollutant load. In case of SS, it was 72.8%. On the other hand, the rainfall amount measured during the 7 different rainy periods was about 17.5% of total rainfall amount in 1999. Release rate of TP shows 11.92 mg/L at fish farm site and 0.2∼1.9 mg/L at monitoring station of water quality on Lake Okjeong, and which is considered to be less than that of other foreign reservoirs under the circumstances of anoxic condition. For the effective management of water quality on Lake Okjeong. WASP5 water quality simulation model has been applied and verified, and the verified model was used to propose the effective scheme of water quality management. In this case, 6 different scenarios were applied, by changing the amount of inflow of pollutant load in each subbasin. The most effective scheme has turned out that pollutant load generated from Imsil and Gwanchon subbasin should be reduced, and the best way to improve the water a quality is to reduce the pollutant load at every subbasin. According to the simulation result, wastewater treatment facility should be located at every subbasin.

  • PDF

Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow (발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정)

  • Jeong, Gimoon;Kang, Doosun;Kim, Dong Hyun;Lee, Seung Oh;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.515-529
    • /
    • 2022
  • Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.

Estimation of Willingness-to-pay for Rehabilitation and Upgrading of Reservoirs in Protecting Against Natural Disasters and Dam-Break (재해·재난 예방을 위한 저수지개보수사업의 지불의사금액 추정)

  • Park, Sung Kyung;Lim, Cheong Ryong;Han, Jae Hwan;Chung, Won Ho
    • Journal of agriculture & life science
    • /
    • v.52 no.6
    • /
    • pp.139-153
    • /
    • 2018
  • This study analyzes the economic effect of rehabilitation and upgrading of reservoirs as a prevented method against natural disasters under recent abnormal weather conditions and dam-break. For the analysis, we divide the purpose of rehabilitation and upgrading of reservoirs into the stable supply of rural water under uncertain weather conditions and the prevention of collapse due to the aging of the reservoir. We measure the economic effect of rehabilitation and upgrading of reservoirs by estimating the resident's willingness-to-pay for the project through Contingent Valuation Method(CVM). The result shows that distributions of willingness-to-pay to prevent natural disasters and dam-break are similar to each other. About 66% of the residents in sample regions are willing to pay for the project. The resident's willingness-to-pay to protect natural disasters and dam-break are 32,250 to 46,147 won and 28,427 to 47,308 won respectively on average for all sample regions. The comparison of willingness-to-pay by type of regions shows that paddy field areas are the highest followed by facility cultivation areas and urban areas. In addition, total expected value of the projects calculated based on the resident's willingness-to-pay for paddy field areas and facility cultivation areas are much larger than actual project costs. This implies that rural residents are fully aware of the importance of the project to prevent natural disasters and dam-break and are willing to pay for additional costs if needed.

Analysis of Applicability of the Detention in Trunk Sewer for Reducing Urban Inundation (도시 내수침수 저감을 위한 간선저류지 적용성 분석)

  • Lee, Sung Ho;Kim, Jung Soo;Kim, Seo Jun
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.1
    • /
    • pp.44-53
    • /
    • 2021
  • The flood prevention capacity of drainage facilities in urban areas has weakened because of the increase in impervious surface areas downtown owing to rapid urbanization as well as localized heavy rains caused by climate change. Detention can be installed in trunk sewers and linked to existing drainage facilities for the efficient drainage of runoff in various urban areas with increasing stormwater discharge and changing runoff patterns. In this study, the concept of detention in trunk sewers, which are storage facilities linked to existing sewer pipes, was applied. By selecting a virtual watershed with a different watershed shape, the relationship between the characteristic factors of detention in the trunk sewer and the design parameters was analyzed. The effect of reducing stormwater runoff according to the installation location and capacity of the reservoir was examined. The relationship between the installation location and the capacity of the detention trunk sewer in the Dowon district of the city of Yeosu, South Korea was verified. The effects of the existing water runoff reduction facility and the detention trunk sewer were also compared and analyzed. As a result of analyzing the effects of reducing internal inundation, it was found that the inundation area decreased by approximately 66.5% depending on the installation location of the detention trunk sewer. The detention trunk sewer proposed in this paper could effectively reduce internal inundation in urban areas.

Suggestion for the Maintenance Program of the Sea Dike Using Geophysical Methods (지구물리학적 방법을 이용한 방조제 유지·관리 체계 제안)

  • Yong, Hwan-Ho;Cho, In-Ky;Song, Sung-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.16 no.4
    • /
    • pp.275-283
    • /
    • 2013
  • The sea dike is the most important facility of reclamation projects, and plays an important role in securing freshwater in the reservoir. Systematic research on practical approaches and data analysis techniques are lacking even though some geophysical methods such as electrical resistivity and self-potential surveys are included within the inspection processes. Hence, geophysical methods were considered for improvement of precision safety diagnosis methods after problems in the maintenance system have been identified, such as safety checks and precision safety diagnoses. In addition, geophysical methods customized according to variations in ambient environmental limiting factors such as pore pressure changes by tidal fluctuation, compaction characteristics of the fill materials, and the surface condition of the embankment were suggested.

Development and Application of a Computer Program for the Analysis of Heat Transfer and Fluid Flow of Water Body: Lake and Primary Clarifier (水體 熱流動 數値解析 프로그램 개발 및 응용 : 湖沼, 일차침전조)

  • 박병수;김경미
    • Water for future
    • /
    • v.29 no.6
    • /
    • pp.141-154
    • /
    • 1996
  • A computer program is developed in order to investigate the fluid flow and heat ransfer of a water body in a 2-D vertical rectangular coordinate. The specific purpose of this study is to obtain a physical insight of several fluid flow problems which occur in a lake and the water and wastewater treatment facility like a primary clarifier. The performance of computer program developed is successfully evaluated by the comparison of other two experimental and computational data in open literature : the first comparison is made against the numerical data associated with the cooling water discharge and the other is numerical and experimental works for the primary clarifier of Sarina City at Ontario. Further, the computer program is applied to investigate the feature of lake flow, say lake turnover, and 2-D vertical channel flow in terms of temperature, wind velocity and flow rate, etc. The computational results appear to be physically acceptable and consistent. The computer program developed in this study shows the possibility of the viable tool to figure out the flow characteristics of water reservoir.

  • PDF