• Title/Summary/Keyword: Reservoir Area

Search Result 738, Processing Time 0.028 seconds

Comparative Study on the Distribution of Sediment Deposits Along the Soyang-gang Dam by Measurement Data (소양강댐의 퇴사용량산정에 관한 연구)

  • Seo, Kwang-Suk;Lee, Joo-Heon;Lee, Eun-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.3 s.6
    • /
    • pp.109-117
    • /
    • 2002
  • An analysis to allocate storage space for sediment accumulation during the economic life of the reservoir is required in the planning or design of a reservoir. This analysis has been the most difficult and tedious aspect to deal with reservoir sedimentation because of the interaction between the various parameters related to the hydraulics of flow, reservoir operating policy, inflowing sediment load. The approach to analyzing spatial distribution of deposits has relied on empirical methods, all of which required a great deal of simplification from the actual physical phenomena. For the purpose of this study, reservoir sedimentation rate computed by Empirical Area Reduction Method is compared with measuring rate along the Soyang-gang Dam. As a conclusion, reservoir sedimentation rate can be estimated exactly by Empirical Area Reduction Method.

Estimation of Inflows to Jangchan Reservoir from Outside Watershed by Minimizing Reservoir Water Storage Errors (저수량 오차에 의한 장찬저수지의 유역외 유입량 추정)

  • Noh, Jae-Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.5
    • /
    • pp.61-68
    • /
    • 2010
  • Jangchan reservoir is located in Okcheon county, Chungbuk province, of which watershed area is $29.4\;km^2$ from outside, and $5.1\;km^2$ from inside watershed, effective storage capacity is $392{\times}10^4\;m^3$, paddy area to be irrigated is 474 ha. To determine inflows from Keumcheon weir located in outside watershed on an optimum level, a repeated procedure which is composed of simulation of inflows to Keumcheon weir, setting of range of water taking at Keumcheon weir, simulation of inflows to Jangchan reservoir, estimation of paddy water from Jangchan reservoir, and simulation of water storages in Jangchan reservoir was selected. Parameters of DAWAST model for simulating inflows to Jangchan reservoir were determined to UMAX of 315 mm, LMAX of 21 mm, FC of 130 mm, CP of 0.018, and CE of 0.007 with absolute sum of errors in reservoir water storages minimized using unconstrained Simplex method because of no inflows data. Inflows to Keumcheon weir were simulated to $2,132{\times}10^4\;m^3$ on an annual average. Optimal range of water taking at Keumcheon weir to transfer to Jangchan reservoir were $0.81{\sim}50\;mm/km^2/d$, which were summed up to $1,397{\times}10^4\;m^3$ in 66% of total on an annual average. Inflows to Jangchan reservoir were simulated to $1,739{\times}10^4\;m^3$ on an annual average of which were 80 % from Keumcheon weir of outside watershed. Requirements to paddy water from Jangchan reservoir were estimated to $543{\times}10^4\;m^3$ on an annual average.

Development of a Simulation Model for Reservoir Sizing in a Region with Insufficient Hydrological Data (수문자료 빈곤지역에서의 저수지 규모 결정 모의 모형 개발)

  • 최진규
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.4
    • /
    • pp.67-75
    • /
    • 2000
  • A simulation model for reservoir sizing was developed to be applied in a region with insufficient hydrological data. Reservoir storage balance equation was formulated on a monthly basis. Gajiyama equation was generalized to estimate monthly reservoir inflow more accurately. Monthly evaporation equation on a reservoir water surface was introduced , which was functioned with monthly mean temperature. Generalized Gajiyama equation was applied to estmate reservoir inflow of the Sayeon dam. Nash-Sutcliffe's model efficiency was 0.793. Using developed model for reservoir sizing, water supply capacity was analyzed with 118.000㎥/day on the Sayeon dam. This showed a reasonable result as compared with 110000㎥/day in other technical report. For general application of developed model, a virtual reservoir was considered and its dta of surface area and volume by elevation was prepared using DEM. Using the model, size of reservoir was determined and water supply capacity was anlayzed on a virtual reservoir.

  • PDF

Prediction of Water Quality improvement for Estuarine Reservoir using Wetland-Detention Pond System (습지-저류지에 의한 하구 담수호 수질개선 효과 예측)

  • 윤춘경
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.5
    • /
    • pp.94-102
    • /
    • 2000
  • Investigated was the effectiveness of a constructed wetland system on water quality in Hwa-Ong estruarin reservoir, located in Hwasung-Gun, Kyunggi-Do. Procedures for estimation of pollutant loading from watershed and required area for natural systems, and simulation of corresponding reservoir water quality were reviewed. Generally, simulated reservoir water quality was within the reasonable range, and about 15% of total polder farmland was required to meet the agricultural water quality standards. The model was applied based on the current loading condition without additional treatment systems. Wetland system is an ecologically sound treatment system. Therefore, natural systems can be an alternative measure for water quality improvement in polder projects. The area for natural systems was estimated using literature value which might be acceptable at the planning stage. However, pilot system and its experimental data are requisite for large scale field application. WASP5 was proved to be a useful and versatile model, and its application to estuarine reservoir water quality simulation was thought to be appropriate.

  • PDF

Analysis of Investment Effect on the Outdoor Swimming Pool Utilizing Reservoir's Amenity Resources (저수지 경관자원을 활용한 야외수영장 개발사업의 투자효과 분석)

  • Kwon, Yong-Dae;Hwang, Jun-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.34 no.1
    • /
    • pp.85-97
    • /
    • 2007
  • This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing infrastructure such as swimming pool based on the reservoir's landscape value. To this end, we have conducted the case study on the outdoor swimming pool in connection with Go-Bok reservoir in Yeon-Gi county, Chungnam Province and estimated its income effect on the rural community by cost-benefit analysis method. The research results are as follows; 1) Outdoor swimming pool participants, with 11,581 visitors totaled to Yeon-gi county every year, was estimated to spend the worth of 58,446 thousand won paid for the agricultural product purchase and etc. 2) Internal rate return of the outdoor swimming pool project was estimated to 16.19%, which considered to be economically feasible comparing with 10% of current capital opportunity cost. Based on the results of this study, we suggest the following strategies for development of amenity value of swimming pool in connected with the reservoir; 1) Reservoir amenities should be well preserved even after construction of swimming pool lest losing amenity values while managing the facilities. 2) Measures to increase the marketing value of intangible reservoir's amenities through promotion should be established. 3) Effective program for more visitors with longer staying and more agricultural products sales should be designed.

  • PDF

Variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area (유역배율에 따른 저수지의 하천유지용수 공급량)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.2
    • /
    • pp.331-341
    • /
    • 2011
  • To provide variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area, 8 reservoirs were selected to draw operation rule curve and to analyze water supplies from reservoirs. Reliability of 90% for supplying irrigation water from reservoir was able to maintain and instream flow water was able to be supplied only in the reservoir with magnification of paddy irrigation area to watershed area above 3. The more magnification of paddy irrigation area to watershed area increased, the more ratio of irrigation water to total water storage decreased, and the more ratio of instream flow water to total water storage increased. From the heightening 113 reservoirs in Korea, annual irrigation water was estimated to 1,146.05 $Mm^3$ in normal operation, 839.57 $Mm^3$ in withdrawal limited operation, and annual instream flow water was estimated to 149.68 $Mm^3$ in normal operation, 283.19 $Mm^3$ in withdrawal limited operation. It was concluded that withdrawal limited operation was followed to have the premise of saving irrigation water, more instream flow water was able to be supplied from reservoirs with high magnification of paddy irrigation area to watershed area.

Statistical Analysis of Irrigation Reservoir Water Supply Index (관개용저수지 용수공급지수(IRWSI)의 확률통계 분석)

  • 김선주;이광야;강상진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.4
    • /
    • pp.58-66
    • /
    • 1998
  • Irrigation Reservoir Water Supply Index(IRWSI), which can be applied to the effective supply and management of the irrigation water resources, was developed. IRWSI was formulated as resealed nonexceedance probabilities of two hydrologic components : reservoir storage ratio and precipitation. To generate nonexceedance probability of hydrologic component, it was important to define the optimal one among the various probability distribution function in the state of nature. To define an optimal probability distribution, in this study, four types of probability distribution function were tested by the K-S fitting, and for the calculation of IRWSI, reservoir storage ratio(%) and precipitation used Normal distribution & Gamma distribution, respectively. In this study, the weight coefficients of a and b for each hydrologic component, which is precipitation and reservoir storage ratio, was decided as 0.8 and 0.2, respectively. While some studies changed weight coefficients according to the size of basin area, this study used same values without considering that. From the analysis of drought characteristics, it was found that the IRWSI was sensitive to the size of irrigation area rather than the size of basin area, and the south-eastern region of Korea had been suffered from severe drought damage.

  • PDF

A Method to Determine the Purchasing Limits of Reservior Flooding Area by Rainfall Data Hydrologric Estimation (강우기록 및 수문계획에 의한 정수지수설지의 용지 현수험 결정방법)

  • 김주영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.3
    • /
    • pp.1742-1748
    • /
    • 1969
  • This is a method to determine the boundary line of reservoir flooding area which will be purchased. Until now, flood water level was used as the boundary line. By lowering this line from flood water level, purchasing cost of reservoir flooding area can be cut down. Sometimes, temporary flooding of arable land outside the boundary occurs. During the life of reservoir, flood damage to crop product on of this land must be indemified with net berefit from arable land between the bovndary line and normal water level. Following is the basic formula to determine the line. (Estimated flood damage to crop production of land outside the boundary line $\leqq$ Estimated net beneift from land between the boundary line and normal water level.) Minimum difference between both sides is needed to minimize the purchasing area. Flood damage and net benefit are estimated by hydrologic estimation with rainfall data and crop production estimation.

  • PDF

A Study on the Degree of Pollution of Stream and Reservoir Sediments in Rural Area (농촌 중.소 하천 및 저수지 퇴적물의 오염현황)

  • Chang, Pyoung-Wuck;Woo, Chull-Woong;Kim, Seong-Pil
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.2 s.19
    • /
    • pp.1-6
    • /
    • 2003
  • This study was performed to investigate the degree of pollution of sediments of stream and reservoir in rural area. A series of field investigations were carried out for Kyongki-do area and chemical analysis were performed for sediment samples. It was found that some samples were heavily polluted with phenol and TPH and gave off a malodor. Soil Pollution Scores(SPSs) was determined for sediment samples. Some samples were classified to Soil Pollution Class(SPC) 2 and 3. For recycling and disposal of dredged sediments from stream and reservoirs, these polluted sediments should be carefully considered. In the environmental improvement operations of rural area, the degree of pollution of sediments of stream and reservoir are carefully investigated and suitable counterplan must be established.