• 제목/요약/키워드: Reserve margin

검색결과 42건 처리시간 0.029초

1MW 계통연계형 에너지저장시스템 연구 (The Study on 1MW Grid-Connected Energy Storage System)

  • 강병관;이충우;류강열;오승훈;이윤재;최은식;고광수;김희중
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 추계학술대회 논문집
    • /
    • pp.239-240
    • /
    • 2013
  • The increased demand for conventional energy sources, and international oil price rises are driving societies toward research and development of renewable energy. A large number of their installations and penetrations will bring an instability distribution power system. Also, load concentration problem at specific time can cause the shortage of power reserve margin. To deal with these problems, the development of energy storage systems (ESS) is required. This paper proposes the 1MW grid-connected ESS with Li-ion battery and power conditioning system (PCS). The performances of the 1MW grid-connected ESS are evaluated and verified with the PSCAD/EMTDC based simulation test.

  • PDF

계통연계형 태양광 발전 시스템에서의 전원측 역율 개선 (Source Side Power Factor Correction for Utility Interactive Photovoltaic System)

  • 조영준;김홍성;목형수;최규하;김한성
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1997년도 전력전자학술대회 논문집
    • /
    • pp.386-392
    • /
    • 1997
  • Recently, according to developing industry and life style, power consumption have been increased year after year. Currently these much power demand from power consumer is weakening the allowable power reserve margin in summer. As one of the remedies about this problem, the small scale utility interactive photovoltaic system(UIPVS) is considered for auxiliary power source. For this system one of problems to be solved technically, system operating power factor. Generally in case of small scale system, system is operated in unity power factor. But this unity power factor operating mode decrease power factor viewed from utility because UIPVS supply active power to utility. Therefore this paper propose UIPVS with power factor correcting function and this system is analyzed.

  • PDF

전압안정도를 고려한 확률론적 도달전력 산정에 관한 연구 (Probabilistic Arrival Power Evaluation considering Voltage Stability)

  • 문승필;장병훈;이재걸;최재석
    • 전기학회논문지
    • /
    • 제59권8호
    • /
    • pp.1366-1373
    • /
    • 2010
  • Purpose of the electric power system planning and operation is to supply the electric energy to customers continuously and economically. With the mutual exclusive laws of nature between reliability and economic, finding the meeting point is very important but not easy. Commonly the probabilistic reliability indices of the electric power systems are represented with negatively. And the effectiveness of FACTS on the probabilistic reliability could not be reflected with common methods. In this paper, a method to evaluate the probabilistic arrival power at each load point is presented. With this new proposed method, probabilistic reserve margin at load points can be calculated and which can be used with positive reliability index also. Using the P-V analysis, the voltage stability is considered in reliability evaluation. It is expected that the proposed method will be useful expecially in reliability evaluation of electric power system which has voltage restriction.

계층분석과정(AHP)을 이용한 지원금 기반 수요반응프로그램 설계 (A Design of Incentive-based DR Program using Analytic Hierarchy Process(AHP))

  • 김동민;김영현;김진오;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.589_590
    • /
    • 2009
  • This paper presents a unique approach to scheme a demand response (DR) program in the electricity market from a customer-oriented perspective, which is based on the analytic hierarchy process (AHP). The proposed program is designed as an incentive-based program (IBP) considering Korea power systems with the cost-based generation pool (CBP). And the proposed DR program has the objective to maximize social welfare corresponding customers‘ participation and the constraints including incentive payments, the specific load curtailment conditions and reserve-margin criterion. A test system for the case study is used to demonstrate the usefulness and applicability of the proposed approach, and the load profiles with the proposed DR program are obtained. The results show not only the revenue attributable to the avoided costs but also enhancement of system reliability.

  • PDF

$CO_2$ 배출량제약을 고려한 최적전원구성 (The Best Generation Mix considering CO2 Air Pollution Constraint)

  • 이상식;트란트룽틴;권중지;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.149-151
    • /
    • 2005
  • A new approach considering CO2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollutionconstraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant multi-years.

  • PDF

발전기 예방정비계획 전산모형 개발 (Development of Generator Maintenance Scheduling Program)

  • 박종배;정윤원;주행로;이명희;신점구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.216-217
    • /
    • 2006
  • This paper presents development of program for generator maintenance scheduling. The maintenance scheduling of generating units is a dynamic discrete combinatorial optimization problem with constraints to determine the optimal maintenance periods of each generating units for a given planning periods. The developed program is designed so as to provide the maintenance schedule satisfying the operating reserve margin levelization and the procurement of proper reliability. In order to verify the effectiveness of the developed program, the numerical study has been performed with the practical data in 2005.

  • PDF

서대구 SVC의 EMTDC 모델 개발 (Development of EMTDC Model of Seo-Daegu SVC)

  • 손광명;김동현;이태기;장길수;윤용범;이진
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권7호
    • /
    • pp.341-348
    • /
    • 2002
  • Recently, an SVC(Static Var Compensator) was installed at Seo-daegu substation in order to maintain the voltage level and reserve stability margin of the Korean Power System. This paper deals with the development of the simulation model for the Seo-daegu SVC. As a simulation platform, PSCAD/EMTDC is adopted and library components for the SVC are developed. The model includes detailed control system functions of Seo-daegu SVC. In order to verify the developed model, simulation results are compared with the TNA test performed by ABB. The results show a good agreement of the developed model with the real system.

발전기의 예비력 마진을 고려한 전압 제어에 관한 연구 (The Study on Power System Voltage Control Considering Reserve Margin of Generator)

  • 정승완;송성환;문승일;윤용태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.76-78
    • /
    • 2004
  • 본 논문에서는 전력시스템에서 상정 사고로 인해서 부하가 급변할 때 계통의 신뢰도를 유지하기 위해서 발전 모선의 전압을 조절하여 부하 모선의 전압을 정상상태의 범위에서 유지시키기 위한 알고리즘을 구조개편 후 비상시에 취할 수 있는 중요한 조치 중 하나로서 재조명한파. 이에 먼저 전력 계통의 상태를 발전기의 예비력을 기준으로 정상상태와 비상상태로 나누고, 계통에서 발생한 상정사고에 대하여 발전 모선의 전압변동을 통해서 부하 모선의 전압을 정상상태의 범위에서 유지하도록 한다. 하지만 심각한 상정사고가 발생하여 발전기의 출력이 정상상태의 예비력 기준을 초과하여 발전을 해야만 하는 상황이면, 이를 계통의 비상상태로 선언하고, 이를 다시 정상상태로 회복시킬 수 있도록 하는 새로운 알고리즘을 제안하였다.

  • PDF

TLP 해양구조물의 시스템 신뢰성 해석에 관한 연구 (On the Study of System Reliability Analysis of Tension Leg Platforms)

  • 이주성
    • 대한조선학회지
    • /
    • 제27권2호
    • /
    • pp.55-62
    • /
    • 1990
  • 본 논문에서는 시스템 신뢰성 해석을 위한 또 하나의 방법으로써 '확대하중증분법'을 소개하였다. 이 방법은 통상의 하중증분법의 범위를 확대한 것인데, 부유식 해양구조물과 같은 연속계 구조물에 대해 복수하중(multiple loading)하의 시스템의 파괴확율(또는 시스템의 신뢰성)을 추정하고, 파괴요소의 후 파괴거동을 보다 실질적으로 고려하며 또한 본 논문에서 제안하는 수정된 안전여부식을 이용하여 구조물내의 주요 부재의 강도공식을 시스템 신뢰성 해석에 직접 이동하기 위한 것이다. 그 방법을 북해의 Hutton 구역에서 가동하는 Hutton TLP와 TLP Rule Case Committee형의 개선된 강도공식을 사용하여 설계한 Hutton TLP의 변형된 형태에 적용하였다. 보다 경제적이고 효율적인 설계를 위해 시스템의 파괴확율과 그에 대응하는 시스템 신뢰성 지수를 유도하였고, 부정정도(redundancy)의 특성에 대한 언급도 포함하였다. 이로부터 TLP 구조물은 높은 잉여강도(reserve strength)와 시스템의 견지에서의 안전성을 갖음을 알 수 있었다.

  • PDF

한국 전력 시스템의 적정 설비 예비율에 대한 연구 : 프로젝트 리뷰 (The Investigation of the Adequate Reserve Margin in the Korean Power System : A Project Review)

  • 노준우;김문겸;오창석;천이경;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.348-350
    • /
    • 2008
  • 본 논문의 목표는 한국 전력에서 의뢰한 용량 과제를 리뷰하기 위한 것이다. 한국 전력은 현재 책정된 용량 가격(CP)을 최적화하려고 한다. 이러한 과정에서 한국 전력과 발전사들 간에 논란이 있었다. 우리 연구팀은 중립적인 입장에서 한국 계통의 안정성에 초점을 맞추어 연구를 진행하였다. 본 리뷰에서 다룬 내용은 한국 계통의 적정 설비 예비율을 구하기 위해, Loss of Load Probability-이하 LOLP를 산출하는 과정을 시뮬레이션을 통해 보여주는 것이다. 더 정확한 결과를 산출하기 위해 2007년 실제부하 및 설비 용량 자료가 사용되었다. 또한 본 연구에서 진행된 여러 가지 과제 수행 단계 중, 본 논문은 2번째 단계인 적정 설비 예비율을 12${\sim}$15%로 하향시킬 가능성을 찾는 연구를 설명한다. 한국 전력 계통의 안정성 모델을 만들고, 그 모델을 사용하여 기존 LOLP에 맞는 적정 설비 예비율을 찾는다.

  • PDF