• Title/Summary/Keyword: Research Facility and Equipment

Search Result 292, Processing Time 0.025 seconds

On the Cooks' Recognition of Culinary Environment of School Feeding in Ul-san (울산광역시 학교급식 조리 환경에 대한 조리사의 인지도 조사)

  • Kim, Hae-Jung;Yoo, Kyung-Min
    • Culinary science and hospitality research
    • /
    • v.14 no.1
    • /
    • pp.94-106
    • /
    • 2008
  • This study is conducted to explore the cooks' recognition of culinary environment of school feeding among the cooks working for elementary schools, middle schools, and high schools in the Ulsan district. A total of 200 samples were distributed and 185 samples were collected; among them, 182 valid samples were selected for research. Answers were processed by SPSS 12.0. after data coding. As for factor analysis of culinary environment, three factors were extracted, which are general environment, human environment, and facilities equipment environment. It was found that general environment included ventilation(31.5%), temperature (29.0%), humidity(22.1%) in the order of importance; human environment covered cooperation among cooks (28.1%), the number of cooks(25.7%), and professionalism of cooks in the order of importance; facility equipment environment contained the design and layout of facilities and equipment(29.3%), various safety facilities, and safety device(23.3%) in the order of importance. However, a measure for improving work environment, number of cooks, deterioration of equipment, etc. should be considered.

  • PDF

Development of Maintenance-Service Model for Small Photovoltaic Equipment (소형 태양광발전설비의 유지관리 서비스 모델 개발)

  • Kang, Seok-Hwa;Park, Byeong-Hun;Choei, Jong-Won;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.234-235
    • /
    • 2015
  • In South Korea, small photovoltaic equipment is increasingly adopted in more detached houses on the constant basis. With this broader use of small photovoltaic equipment, its systematic maintenance becomes all the more necessary. However, photovoltaic facility maintenance has been concentrated solely on large-scale solar energy generation plants in the country while hardly covering smaller facilities. In this research, the JEM rule and extant maintenance company services were analyzed to develop a proper maintenance model for small photovoltaic equipment. The maintenance service procedures designed herein are as follows: A small photovoltaic equipment user chooses a maintenance company and signs a contract. Once a contract is made, the Korea Energy Management Corporation provides a certain kind of incentive to the company. The company provides maintenance service to the user and receives a service fee. If such a maintenance service model is in place, small photovoltaic equipment efficiency is expected to increase and users could receive systematic maintenance services. Also the new creation of small photovoltaic equipment maintenance service would form a new market to generate more jobs for the society.

  • PDF

Advanced Depreciation Cost Analysis for a Commercial Pyroprocess Facility in Korea

  • Kim, Sungki;Ko, Wonil;Youn, Saerom;Gao, Ruxing;Chung, Yanghon;Bang, Sungsig
    • Nuclear Engineering and Technology
    • /
    • v.48 no.3
    • /
    • pp.733-743
    • /
    • 2016
  • The purpose of this study is to present a rational depreciation method for a pyroprocess cost calculation. Toward this end, the so-called advanced decelerated depreciation method (ADDM) was developed that complements the limitations of the existing depreciation methods such as the straight-line method and fixed percentage of declining-balance method. ADDM was used to show the trend of the direct material cost and direct labor cost compared to the straight-line or fixed percentage of the declining-balance methods that are often used today. As a result, it was demonstrated that the depreciation cost of the ADDM, which assumed a pyroprocess facility's life period to be 40 years with a deceleration rate of 5%, takes up 4.14% and 27.74% of the pyroprocess unit cost ($781/kg heavy metal) in the $1^{st}$ and final years, respectively. In other words, it was found that the ADDM can cost the pyroprocess facility's capital investment rationally every year. Finally, ADDM's validity was verified by confirming that the sum of the depreciation cost by year, and the sum of the purchasing cost of the building and equipment, are the same.

Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis (AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구)

  • Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.

On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System (철도 신호제어 시스템의 AHP 기법 적용을 통한 성능평가 대상설비 항목 개선 및 안전성 확보에 관한 연구)

  • Hwang, Sunwoo;Kim, Joouk;Kim, Youngmin;Kim, Hyungchul;Lee, Soohwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.71-79
    • /
    • 2021
  • The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.

Reliability Design Based on System Performance-Cost Trade-off for Manufacturing facility

  • Hwang, Heung-Suk;Hwang, Gyu-Wan
    • International Journal of Reliability and Applications
    • /
    • v.2 no.4
    • /
    • pp.269-280
    • /
    • 2001
  • The objective of this paper is to provide a model for effective implementation of costing RAM management in the design and procurement of production facility considering the system cost-performance trade-off. This research proposes a two-step approach of costing RAM design and test of system RAM for production facility. In Step 1, a static model is proposed to find an initial system configuration to meet the required performance based on system RAM and LCC and analyzes the trade-off relationships between various factors of RAM and LCC. In the second Step, we developed time and failure truncated models for system reliability test and analysis. For the computational purpose, we developed computer programs and have shown the sample results. By the sample test run, the proposed model has shown the possibilities to provide a good method to analyze system performance evaluation for both design and operational phase, This model can be applied to a wide variety of systems not only for costing RAM of the production facilities but also for the other kinds of equipment.

  • PDF

An Experimental Study of Spray Nozzle Desalination Facility (담수화 설비 스프레이 노즐에 대한 실험적 연구)

  • SHIN HYUN-KYOUNG;JOO HYUN-TAE;PARK MIN-HO;PARK KYOUNG-MIN;KIM JIN-YOUNG;LIM JIN-YOUNG
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.1 s.68
    • /
    • pp.26-31
    • /
    • 2006
  • Experimental research was undertaken to develop a domestic spray nozzle used on equipment for desalination. First, we made a test set-up in order to confirm nozzle efficiency of spray and distribution under different pressure conditions. Then, we found a maximum spray condition after verifying reliability of this facility. An optimum arrangement of the nozzle, based on the test result, was made using CATIA V5 and EXCEL.

A Study on the Planning of Indoor Environment Factors for Sustainable School Facility (지속가능한 학교시설을 위한 실내환경 계획 요소에 관한 연구)

  • Shin, Dong-Sik;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.34-41
    • /
    • 2011
  • Global environment is getting deteriorated at an alarming rate. Eco-school could be one of the effective solutions to project our environment and a good sample of architecture to economize in total energies, resources and greenhouse gases. In case of our country, the study of eco-school planning is not sufficient compared with other countries, so this paper would be a good study on the indoor environment of the classroom by surveying their opinions and ideas from the group of users in school facility. The result of this study shows that the proper installation of building equipment and nature ventilation system is necessary to provide delightful environment for the students and to save the energy. To ensure that we have adequate saving and protection it is necessary to change the existing appraisal standard.

Reorganization trend on technical regulation of harm prevention for Power Line Communication (전력선통신 위해방지 기술기준의 개편 동향)

  • Cho, Pyung-dong;Choi, Mun-hwan;Lee, Sang-mu
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.1071-1074
    • /
    • 2015
  • Technical regulation of harm prevention for power line communication prescribes the technical matters to protect human and other equipment from power line communication equipment. Unified operation of technical regulation of power line communication and line facility installation is more efficient in content. This paper is to discuss the technical background of national PLC system and the direction of reforming related techinal regulations.

  • PDF

A Research on the Determining Model of the Optimizing Maintenance Interval in TBM for the Preventive Maintenance of Facilities (설비예방보전을 위한 TBM의 최적보전주기 설정모델 연구)

  • Kwon Oh-Woon;Lee Hong-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.105-117
    • /
    • 2003
  • The purpose of this research aimed at performing the easy design. and also the easy on-the-job application or the maintenance interval determination methodology by presenting the determining model or the optimizing maintenance interval in TBM for the preventive maintenance or facility TBM(time-based maintenance) as the preventive maintenance requires the adequate determination or the maintenance interval. The maintenance interval or TBM shall be applied differently for the each interval such as He patrol inspection, maintenance, overhaul inspection. exchange. And it is based on the composition level of equipment. The already informed theories or interval determination methodology for the patrol inspection. repair. and overhaul inspection are difficult for adopting because or the several restriction problems in applying the maintenance schemes as the theory So, the model for determining the optimizing exchange interval or part, maintenance interval of auxiliary machine, unit equipment etc. was presented to apply in the maintenance easily and appropriately.

  • PDF