• Title/Summary/Keyword: Replacement method

Search Result 1,397, Processing Time 0.03 seconds

A study on estimation status and improvement plan of the repair and replacement cycle of a building (건축물 수선교체주기 산정현황과 개선방안에 관한 연구)

  • Kim, Jong-Rok;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.193-198
    • /
    • 2010
  • This study aimed at presenting the improvement plan for estimation of the repair and replacement cycle to analyze these current problems by considering the repair and replacement cycle theoretically and examining estimation status of home and abroad, and then drawing implication and problem based on brainstorming and expert opinion. The findings of a study is as follows. First, the problem is, for the domestic, that there is no clear standard of division to the cycle of repair and replacement and the repair and replacement cycle considering capability to deal with the change by construction method, development of the function of material and the number of years of progress is not being applied. That is, an estimation of economical repair and replacement cycle which considers the case that a large scale repair with the level of remodeling is done between 25 years and 35 years is necessary. For estimating the repair and replacement cycle, foreign country is providing this according to the use or the level of function of a building, but it is not the case for the domestic. A characteristic of each building should be reflected and the standard of estimation of the repair and replacement cycle to new construction material or method should be prepared to improve this. In addition, the method of classification of the subject item for the repair and replacement is necessary to be reorganized to be able to apply the standard of initial construction item of a building. Also, it is considered that a service standard which can reset the repair and replacement cycle based on status of a building with escape from the existing definite setup of the repair and replacement cycle through the management of background data of the repair and replacement is going to be necessary.

Software Replacement Time Prediction Technique Using the Service Level Measurement and Replacement Point Assessment (서비스 수준 측정 및 교체점 평가에 의한 소프트웨어 교체시기 예측 기법)

  • Moon, Young-Joon;Rhew, Sung-Yul
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.8
    • /
    • pp.527-534
    • /
    • 2013
  • The software is changed according to the changing businesses and the user requirement, it involves increasing complexity and cost. Considering the repetitive changes required for the software, replacement is more efficient than maintenance at some point. In this study, the replacement time was predicted using the service dissatisfaction index and replacement point assessment index by the software group for each task. First, fuzzy inference was used to develop the method and indicator for the user's service level dissatisfaction. Second, the replacement point assessment method was established considering the quality, costs, and new technology of the software. Third, a replacement time prediction technique that used the gap between the user service measurement and replacement point assessment values was proposed. The results of the case study with the business solutions of three organizations, which was conducted to verify the validity of the proposed prediction technique in this study, showed that the service dissatisfaction index decreased by approximately 16% and the replacement point assessment index increased by approximately 9%.

Economic Evaluation Model of FMS Replacement under Technological Progress (FMS의 설비교체계획에 대한 경제적 평가모형)

  • 이상철;하정진
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.7-13
    • /
    • 1991
  • Recently, in FMS composing of various automatic equipments, the machines with lower operating costs, and with higher operating costs and replacement costs resulting from deterioration have been appearing successively as a result of rapidly advances in technology. "Control Limit Policy" [1] by using Markov decision policy, a kind of optimal economic replacement decision, well reflects and represents this environment. In this paper, it is reviewed that the decision method of the forecasted replacement alternatives in planning horizon under technological advances is derived. The proposed method is applied to a numerical example and some characteristics are examined by sensitivity. It is clarified that the method is relatively insensitive to changes of parameters at the present decision. decision.

  • PDF

재생이론에 의한 헬리컬 기어장치의 신뢰성에 관한 연구

  • 김하수;강희용;양성모
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.799-802
    • /
    • 1995
  • Whale helical gears is used to transmit motion between parallel shafts, the shaft bearings are subjected to both radial and thrust loads. The reliability and life analysis are based on the two-parameter Weibull disribution lives of the component gears and bearings. Two methods of estimating the time between gear system overhauls and the number of replacement components needed were presented. The first method assumes replacement of all components during an overhaul of a failed gear system. the second method assumes replacement of failed comonents only. Renewal theory was presented to estimate the number of comonent replacements in a gear system for both methods.

  • PDF

Proper Decision for Maintenance Intervals of Equipment in Power Stations by Considering Maintenance Replacement Rate and Operation Rate

  • Nakamura, Masatoshi;Suzuki, Yoshihiro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.157.3-157
    • /
    • 2001
  • In this paper, the optimal maintenance scheduling for turbine with considering maintenance replacement rate was proposed in order to reduce the maintenance cost during the whole period of operation, meanwhile keeping current reliability of turbine. The proposed method is only based on a few limited available data with various factors relating to maintenance replacement and repair of turbine. The proposed method will be adopted by Kyushu Electric Power Co., Inc. from April in 2002 to determine the maintenance schedule of thermal power plants.

  • PDF

Development of New Strategies for Enzyme Replacement Therapy for Lysosomal Storage Disorders

  • Ko, Ah-Ra
    • Journal of mucopolysaccharidosis and rare diseases
    • /
    • v.2 no.1
    • /
    • pp.17-18
    • /
    • 2016
  • Enzyme replacement therapy (ERT) is a well-established means of treating lysosomal storage disease (LSD). However, classical IV infusion based ERT method produces less than ideal results, especially, CNS defects and quality of life in patients. To improve these main problems of parental IV formulation for LSDs, we investigate modified ERT method and evaluated the efficacy in animal model.

A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method (완전준설 치환공법에 의한 컨테이너 부지조성 사례)

  • Hong, Eui;Sim Dong-Hyun
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF

An effect of rail accumulated passing tonnage measurement device which uses a optical fiber sensor rail pad (광섬유센서 레일패드를 이용한 레일누적통과톤수 실측장치의 효용성 분석)

  • Shin, Hyo-Jeong;Park, Eun-Yong;Kong, Sun-Yong;Kim, Bag-Jin
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.91-98
    • /
    • 2009
  • For maintaining railroad, accumulated passing tonnage is a determinant factor of appropriate rail replacement time. Recently, Seoul Metro's rail maintaining system and technology is being improved from previous years, which increasing a standard of rail replacement. Thus, this brings importance of estimating and managing for accumulated passing tonnage. In case of light weighted train such as subway, current method of calculating accumulated passing tonnage has defaults of misrepresenting accumulated passing tonnage data. Because current method is based on the weight of passengers and train., and operation data. In addition, currently there is no mechanical and electronic system that could represent and support the accurate data between heavy and non-heavy traffic area, and accumulated passing tonnage is calculated inaccurately by estimating average value each line. The current method of calculating accumulated passing tonnage misleads to unpredictable data that represent inappropriate rail replacement period, which leads to under or over analyzed replacement period. If accumulated passing tonnage is over estimated, rail replacement leads to waste of budget. Hence, it is necessary to construct reliable actual measurement system to manage rail's life safely and efficiently, and in this study the accumulated passing tonnage measurement device is installed with using rail pad of optical fiber sensors and its effect is analyzed.

  • PDF

Cost-optimal Preventive Maintenance based on Remaining Useful Life Prediction and Minimum-repair Block Replacement Models (잔여 유효 수명 예측 모형과 최소 수리 블록 교체 모형에 기반한 비용 최적 예방 정비 방법)

  • Choo, Young-Suk;Shin, Seung-Jun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.18-30
    • /
    • 2022
  • Predicting remaining useful life (RUL) becomes significant to implement prognostics and health management of industrial systems. The relevant studies have contributed to creating RUL prediction models and validating their acceptable performance; however, they are confined to drive reasonable preventive maintenance strategies derived from and connected with such predictive models. This paper proposes a data-driven preventive maintenance method that predicts RUL of industrial systems and determines the optimal replacement time intervals to lead to cost minimization in preventive maintenance. The proposed method comprises: (1) generating RUL prediction models through learning historical process data by using machine learning techniques including random forest and extreme gradient boosting, and (2) applying the system failure time derived from the RUL prediction models to the Weibull distribution-based minimum-repair block replacement model for finding the cost-optimal block replacement time. The paper includes a case study to demonstrate the feasibility of the proposed method using an open dataset, wherein sensor data are generated and recorded from turbofan engine systems.

Quantitative Interchangeability Evaluation Method Considering Part Replacement Decision Algorithm of Small Equipment (소형장비의 부품 교체단위결정 알고리즘을 고려한 정량적인 교체성 평가방법)

  • Kim, Jong-Do;Son, Woo-Hyun;Park, Sang-Jin;Mok, Hak-Soo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.537-544
    • /
    • 2019
  • In currently electronic systems, the speed of information integration has increased due to the development of electronic technology. However, due to the increase in the number of parts and groups, the product structure has become complicated. In this paper, a study was conducted to evaluate quantitatively the replacement of a small equipment. First, the level of the replacement was determined through the algorithm for the replacement level of parts. Next, we defined the ease of detail replacment, and the factors for each detail replacement. In order to calculate the weighting of the detail ease, we performed the analysis of the replacement process of subcomponents of communication exchanger and defined the evaluation criteria. Finally, the completion of the evaluation check sheet and the evaluation score table.