• Title/Summary/Keyword: Replacement cost method

Search Result 154, Processing Time 0.021 seconds

Software Replacement Time Prediction Technique Using the Service Level Measurement and Replacement Point Assessment (서비스 수준 측정 및 교체점 평가에 의한 소프트웨어 교체시기 예측 기법)

  • Moon, Young-Joon;Rhew, Sung-Yul
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.8
    • /
    • pp.527-534
    • /
    • 2013
  • The software is changed according to the changing businesses and the user requirement, it involves increasing complexity and cost. Considering the repetitive changes required for the software, replacement is more efficient than maintenance at some point. In this study, the replacement time was predicted using the service dissatisfaction index and replacement point assessment index by the software group for each task. First, fuzzy inference was used to develop the method and indicator for the user's service level dissatisfaction. Second, the replacement point assessment method was established considering the quality, costs, and new technology of the software. Third, a replacement time prediction technique that used the gap between the user service measurement and replacement point assessment values was proposed. The results of the case study with the business solutions of three organizations, which was conducted to verify the validity of the proposed prediction technique in this study, showed that the service dissatisfaction index decreased by approximately 16% and the replacement point assessment index increased by approximately 9%.

A Study on the Stress Concentration of Crushed-stone Compaction Piles through Field Loading Test (현장재하시험을 통한 쇄석다짐말뚝의 응력분담에 관한 연구)

  • 이민희;최용규;임종철;황근배
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.107-114
    • /
    • 2003
  • Among soft ground treatment methods with granular soil used in domestic, the sand compaction pile method has been utilized greatly, but, as a result of exhaustion of sand and increase of unit cost, the necessity of an alternative method is suggested. In this study, the static load tests for crushed-stone compaction piles which were constructed on test field were performed. Based on test results, stress concentration ratios between the crushed-stone compaction pile and the soft ground were investigated and estimated. At loading pressure, settlement showed decreasing tendency as replacement rate increases. At replacement rate of 20%, yield pressure was smaller but, at replacement rates of 30% and 40%, settlement and yield pressure were similar. The stress concentration ratio was within the range of 1.7 to 3.0 and it was higher as replacement rate increased.

Cost Analysis and Period Determination in Stepdown Warranty Policy (단계별 보증제도에서의 비용분석 및 보증기간 설정)

  • Kim, Jae-Jung;Jang, Jung-Sun;Kim, Won-Jung
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.1
    • /
    • pp.39-47
    • /
    • 1992
  • This paper is concerned with cost analysis and determination of warranty period in a stepdown warranty policy. Manufacturer's warranty cost is analyzed for nonrepairable item, where the warranty is assumed to be renewed at any failure within the warranty period. It is shown that from this result in free replacement policy, pro-rata policy and hybrid policy can be easily calculated. The method of determining optimal warranty period is also explored.

  • PDF

Markovian Approach of Inspection Policy in a Serial Manufacturing System (Markovian 접근방법을 이용한 직렬생산시스템의 검사정책)

  • 정영배;황의철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.11 no.17
    • /
    • pp.81-85
    • /
    • 1988
  • This paper presents a model that considers combinations of rework, repair, replacement and scrapping. Policy-Iteration method of inspection is proposed for a serial manufacturing system whose repair cost, scrap cost and inspection cost. when it fails, can be formulated by Markovian approach. Policy-Iteration stops when new inspection policy is the same as previous inspection policy. A numerial example is presented.

  • PDF

Estimation of a Product Replacement Ratio During the Warranty Period for a Warranty Analysis (보증분석을 위한 품질보증 기간 중 제품 교체율 추정 사례 연구)

  • Ahn, Hae-Il
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.2
    • /
    • pp.71-79
    • /
    • 2012
  • In this paper, an evaluation of a product replacement ratio of irreparable items to the normally working ones is performed with a view to a warranty analysis. It is demonstrated that the replacement ratio during the warranty period can be estimated from the field data collected during the period of operation, and one can provide the management with a useful information regarding the appropriateness for the warranty period, which is vital to the product marketing strategy. Although warranty data usually take the form of multiply right censored interval data, the conventional reliability analysis method seems to be good enough as in this case. More sophisticated method such as warranty cost analysis and 2-dimensional warranty analysis is yet desired.

Optimum Replacement Times for a Steam Generator (증기발생기 최적 교체시기 결정에 관한 연구)

  • Hur, Jung-Hoon;Yun, Won-Young
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.89-98
    • /
    • 2002
  • This paper considers the optimum replacement times of a steam generator in nuclear power plant with failure data. It is assumed that the failure pattern of units is given as a Weibull distribution and repair and periodic preventive maintenance are performed periodically. The maximum likelihood method is used to estimated the Weibull parameters of failure distribution from failure data. Relpacement, output-decresing and maintenance costs are considered to determine the optimal replacement times by simulation. Numerical examples are included with actual failure data and cost estimators.

A Study on the Design Plan of Naval Combat System Software to Reduce Cost of Hardware Discontinuation Replacement

  • Jeong-Woo, Son
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.1
    • /
    • pp.71-78
    • /
    • 2023
  • In this paper, we analyze the structure of TV video software, one of the warship combat management system software, and propose a standard architecture that minimizes software modification due to the discontinuation replacement of warship hardware. The class structure was newly designed to minimize the class modified when replacing the warship hardware by separating the variable elements and common elements of TV video software through FORM(Feature-Oriented Reuse Method), the common part that communicates with the warship combat management system and displays the TV screen and the variable part that communicates between the operator and the TV camera. In addition, the Strategy design pattern is applied to efficiently add and modify classes that directly use hardware-dependent APIs when replacing hardware discontinuation, and to make both discontinued and replacements available software. Finally, the reliability testing time and functional testing time of the existing TV video software and the proposed software were measured and compared, and finally, it was confirmed that the hardware discontinuation replacement cost was reduced.

Economic Analysis of Concrete Panel Replacement of PSC Bridge with Embedded Demountable Shear Connector (매립형 분리식 전단연결재를 적용한 PSC교 콘크리트 바닥판 교체공사의 경제성 분석)

  • Soon-Hwan, Lee;Jong-Eon, Kim;Jae-Gyu, Kim;Se-Hyun, Park;Dae-Sung, Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.376-385
    • /
    • 2022
  • The embedded demountable shear connector was developed in preparation for replacement works due to deterioration and damage to the bridge panel of the PSC girder bridge which is a road infrastructure directly related to the safety and convenience of the people. The demountable shear connector minimizes crushing works in the demolition process of the panel, and it is easy to re-construct the shear connector for replacement work. The economic feasibility of the PSC girder bridge using the embedded demountable shear connector compared to the existing construction method was analyzed from the perspective of road users (people) by calculating and comparing the cost of road users caused by traffic blocking during each construction method.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

A Light Characteristics of Mixed-Color LED for the Variable Color Temperature Street Light (가변색온도 가로등 구현을 위한 혼색LED의 조명특성)

  • Jeong, Byeong-Ho;Lee, Kang-Yeon;Choi, Youn-Ok;Kim, Dae-Gon;Kim, Nam-Oh;Min, Wan-Ki
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.2
    • /
    • pp.142-147
    • /
    • 2009
  • Conventional HP(high pressure) sodium or Metal-halide lamps have a life span of around one year requiring at least annual replacement and maintenance. High Power LED lights require no regular maintenance further increasing savings on replacement bulbs, access equipment and labour costs. New installations benefit from a substantial reduction in the cost of expensive heavy duty cable required for sodium lighting. Especially, LED light can achieve variable color temperature, high functional performance in the field of street light. There are two main method to achieve variable color temperature function of the street light. one method is using RGB multi-chip LED, the other is using Orange-White LED method. In this paper, it was compare RGB Multi-chip LED with white-orange LED for there characteristics performance.