• Title/Summary/Keyword: Replacement Management

Search Result 734, Processing Time 0.032 seconds

Generalized Replacement Demand Forecasting to Complement Diffusion Models

  • Chung, Kyu-Suk;Park, Sung-Joo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.14 no.1
    • /
    • pp.103-117
    • /
    • 1988
  • Replacement demand plays an important role to forecast the total demand of durable goods, while most of the diffusion models deal with only adoption data, namely initial purchase demand. This paper presents replacement demand forecasting models incorporating repurchase rate, multi-ownership, and dynamic product life to complement the existing diffusion models. The performance of replacement demand forecasting models are analyzed and practical guidelines for the application of the models are suggested when life distribution data or adoption data are not available.

  • PDF

Surgical Management of Ascending Aortic Aneurysm and Aortic Regurgitation (상행대동맥류와 대동맥판막부전증이 동반된 환자의 외과적 치료)

  • 조범구
    • Journal of Chest Surgery
    • /
    • v.15 no.2
    • /
    • pp.222-229
    • /
    • 1982
  • The aneurysmal dilatation of ascending aorta with the aortic regurgitation presents typical surgical problems. Over the years, various surgical procedures had been used for the management of the dilated segment of sending aorta and the aortic regurgitation. The surgical technique Is still in the state of evolution. The one method is the super coronary replacement of the ascending aorta with vascular graft and replacement of the aortic valve with preservation of the coronary ostia as advocated by Miller and his colleague at Stanford University, so called conventional technique". The other is the replacement of aortic valve and the dilated segment of the ascending aorta using a composite graft and transplantation of the coronary ostia as described by Bentall and DeBono in 1968. The controversy appears to evolve around 3 technical problems. One is bleeding from the grafted area. Two is later development of the aneurysmal dilatation of the subcoronary aortic wall when non-composite graft is employed. Three is a management of the coronary arteries. The purpose of this article is to present our experience with 7 cases of annuloaortic ectasia in whom both of these surgical techniques at that employed and to review some of the problems that encountered during the management of these patients .

  • PDF

Development of Simple Evaluation Method for Determining the Priority of Medical Device Replacement in Hospitals (병원내 의료기기 교체의 우선순위 결정을 위한 단순평가법 개발)

  • Seo, Gihong;Park, Eunkyoung;Choi, Dongil
    • Journal of Biomedical Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.256-263
    • /
    • 2020
  • The importance of quality control has been emphasized to maintain safety of patients and satisfaction of medical service with medical devices used in clinic. Accordingly, objective evaluation method and standards consistently has been brought up for demand to replace outdated medical devices in appropriate time and to maintain the quality of medical service. Though many studies made suggestions methods to determine what medical devices to be replaced first, these methods were difficult in practice for its complex evaluation criteria and long time to evaluate. Therefore, in this study, a simple evaluation method is developed to identify and prioritize medical devices that are ought to be replaced. For the development of this simple evaluation method, four major characteristics of technology, safety, finance, and user satisfaction, which are considered in clinics to evaluate medical device replacement, and 14 minor attributes are distinctively selected. Each characteristic is assessed in binary form of "YES" or "NO" to minimize its subjective nature. Using this method to evaluate sampled medical devices belonging to four different characteristics, devices are suggested to be replaced in the current financial year or in the following financial year, or re-evaluated by the end of this financial year. Such results of evaluation can amend the subjective nature of existing evaluation method and give objective standards more promptly.

Replacement Investment with Pallet Fuel System in Greenhouse Fruit and Vegetables (목재펠릿시스템의 대체투자 가능성 분석 - 시설과채 사례 -)

  • Kim, Seongsup;Kim, Taehoo;Seo, Sangtaek
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.3
    • /
    • pp.149-160
    • /
    • 2018
  • This study aimed to analyze the replacement investment of the diesel fuel system with the pallet fuel system in the Korean farming sector. Equivalent annual annuity approach was used to resolve a discrepancy of useful life in capital goods and to facilitate investment analyses in an independent perspective. Data was obtained from previous studies on economic analysis of greenhouse tomato, paprika and cucumber. Results showed that the replacement with the pallet fuel system was acceptable irrespective of the remaining period of useful life for the diesel fuel system. In addition, sensitivity analysis with government support level, repair cost, and light and heat energy cost show ed robustness in the possibility of replacement with the pallet fuel system while the speed of replacement was accelerated with an increase in the amount of diesel fuel used and price of diesel fuel, and a decrease in price of the pallet fuel. The result implied that the replacement investment rather than a new investment was appropriate for existing greenhouse farmers and the pallet fuel system was acceptable to replace existing diesel fuel system in producing greenhouse tomato, paprika and cucumber.

Repair-Replacement Strategies for Warrantied Items with Phase-Type Lifetimes (PH 수명분포를 갖는 보증제품의 수리-교체 전략)

  • Kim, Ho-Gyun;Bae, Chang-Ok;Kim, Seung-Cheol
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.686-691
    • /
    • 2005
  • We are concerned with the question of servicing warranties for repairable items. During the warranty period, each time an item fails the manufacturer has the obligation to restore the item to operational condition either by repairing the item or by replacing it by a new item. In this paper, we consider the repair-replacement strategies based on the condition of the failed item. For products with phase-type lifetime distributions where the phases represent the condition of the item, we develop algorithms to determine the expected cost of servicing a warranty and use it in making the repair-replacement decision. Illustrative numerical examples are presented. We also propose a dynamic strategy by taking the expected remaining warranty cost into consideration.

  • PDF

On Optimal Replacement Policy for a Generalized Model (일반화된 모델에 대한 최적 교체정책에 관한 연구)

  • Ji Hwan Cha
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.3
    • /
    • pp.185-192
    • /
    • 2003
  • In this paper, the properties on the optimal replacement policies for the general failure model are developed. In the general failure model, two types of system failures may occur : one is Type I failure (minor failure) which can be removed by a minimal repair and the other, Type II failure (catastrophic failure) which can be removed only by complete repair. It is assumed that, when the unit fails, Type I failure occurs with probability 1-p and Type II failure occurs with probability p, $0\leqp\leq1$. Under the model, the system is minimally repaired for each Type I failure, and it is repaired completely at the time of the Type II failure or at its age T, whichever occurs first. We further assume that the repair times are non-negligible. It is assumed that the minimal repair times in a renewal cycle consist of a strictly increasing geometric process. Under this model, we study the properties on the optimal replacement policy minimizing the long-run average cost per unit time.

theory and implementation

  • Lee, Young-Q.;Kumara, Soundar R.T.;Ham, Inyong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.533-544
    • /
    • 1992
  • 한 제품의 구성 부품 수가 증가함에 따라 조립/분해 순서의 방법수는 기하급수적으로 증가한다. 또한 이 순서의 선택에 의하여 조립/분해의 효율성이 결정된다. 본 논문에서는 조립제품의 조립순서(Assembly Sequence)와 특정부품의 효율적 교체(Part Replacement)를 위한 분해순서(Disassembly sequence)에 관한 새로운 Algorithm들을 다음 3가지 경우를 통하여 소개한다 : 1) Full Assembly/Disassembly, 2) Part Replacement by Individual Disassembly, 그리고 3) Part Replacement by Group Disassembly. 이들 Algorithm들은 'Freedom and Interference Space'라는 새로운 개념으로부터 유도되며, Group Disassembly는 Carpenter's Approach를 통하여 실현된다. 이 논문에서 소개되는 Algorithm들은 조립/분해순서와 함께 조립/분해 방향도 제시하는데 비교적 복잡한 예를 통하여 이들을 실현함으로써 실제 제품 Design에의 활용 가능성을 보여준다.

  • PDF

손실함수를 고려한 주기적 검사정책을 갖는 열화시스템의 최적교체정책

  • 이창훈;박종훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.469-472
    • /
    • 2000
  • Replacement policy of a degradation of system is investigated by incorporating the loss function defined by the deviation of the value of quality characteristic from its target value, which determines the loss cost . Two cost minimization problems are formulated : 1)determination of an optimal inspection period given the state for the replacement and 2)determination of an optimal state for replacement under fixed inspect ion period. Simulation analysis is performed to observe the variation of total cost with respect to the variation of the parameters of loss function, inspection cost, respectively. As a result, parameters of loss function are seen to be the most sensitive to the total cost. On the contrary, inspect ion cost is observed to be insensitive.

  • PDF

A Development of Indicators to Decide Replacement Priority for Medical Equipment in Hospital (병원 의료장비 교체 우선순위를 결정하는 지표의 개발)

  • Park, Jun;Lee, Mi-Young;Kim, Ki-Tae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.37 no.4
    • /
    • pp.161-180
    • /
    • 2012
  • We develop some evaluation tool and indicators for the scores for medical equipment replacement in hospital. There has been no research for Korean hospitals although there are many for foreign medical institutions. In this paper, among many variables that were obtained from the previous studies, eleven variables are selected as indicators and tied as three groups. And then we obtain scores of medical equipments based on the weighted values of those indicators. We can make decisions whether we replace medical equipments or not by ranking the medical equipments based on the scores. This paper shows that we can make decisions to replace medical equipments very objectively and effectively using the evaluation tool and indicators we develop.

Maintenance Model of Multi-Component System Considering Characteristics of Components (부품특성(部品特性)을 고려한 다부품장비(多部品裝備)의 정비모형(整備模型))

  • Jeong, Yeong-Bae;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.17 no.1
    • /
    • pp.1-10
    • /
    • 1989
  • In general, the characteristics of components which consist of multi-component system can not be the same. This paper proposes a maintenance model of multi-component system considering the characteristics of each component. In this paper, multi-component system is divided into three components-critical unit, major unit and minor unit, respectively. This paper determines the optimal replacement time of the system which minimizes total maintenance cost, optimal replacement period of major unit and initial stock quantity of minor unit within this optimal replacement time. Numerical examples are shown when the failure times of each unit have gamma distribution.

  • PDF