• Title/Summary/Keyword: Repetitive project

Search Result 73, Processing Time 0.028 seconds

SUSTAINABLE DESIGN AUTOMATION AND MANAGEMENT USING XML

  • Byeong Cheol Lho;Jeong Hoon Kim;Ok Youn Yu;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.592-595
    • /
    • 2005
  • Concrete slab bridge is one of most common structures employed for local road constructions because of its simplicity in design and construction. Computer applications were developed to automate the repetitive computation for these simple structures. However, in most cases, managing the electronic documents produced by these applications has not been incorporated with design automation application yet. Resultant documents are often managed by individuals and disappear as time goes by due to lack of systemic management. This paper introduces a Web-based application developed to not only speed up the design process but also enhance the collection and manipulation of resultant electronic documents.

  • PDF

CONSULTANTS' NEEDS AND EXPECTATIONS FROM CONTRACTING ORGANIZATIONS IN NORTHERN CYPRUS BUILDING CONSTRUCTION INDUSTRY

  • Mehmedali Egemen;Abdulrezak N. Mohamed
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.986-991
    • /
    • 2005
  • Intense competition existing in construction market creates an industry that is dominated by the client groups. Numerous studies dealing with private clients' needs and expectations from contractor firms exist in the literature. However in the unique construction industry, in addition to clients, consultants as representatives of clients will almost always have very important roles to play as well. By presenting survey findings of 50 consultant firms, this study provides insights into consultants' general needs and expectations from contracting organizations on behalf of their clients by using the data from Northern Cyprus private building construction market.

  • PDF

Proliferation of Health and Safety Documentation in Construction?

  • Smallwood, John;Bester, Deon
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.243-248
    • /
    • 2020
  • In addition to a range of H&S documentation, a range of actions, beliefs, interventions, practices, and states are important in terms of achieving optimum construction H&S. Conclusions include that H&S documentation facilitates and assists planning, organising, leading, controlling, and coordinating H&S. Furthermore, current H&S documentation: is inappropriate in that it can be complex, generic, lengthy, onerous, repetitive (duplicative), and vague; engenders dubious practices; generally, 'does not add the potential value'; shifts the focus from the physical process, and could be improved. Recommendations include: industry associations should review their 'audit system' to interrogate the allocation of points; H&S documents must reflect the intention of the requirement; the synergy between H&S documentation, and actions, interventions, and practices should be investigated, digested, and focused upon, and 'audits', or rather inspections, should focus more on the physical process, actions, interventions, and practices, than documentation.

  • PDF

An Earthwork Districting Model for Large Construction Projects (단지공사의 토공구획 계획 모델)

  • Baek, Hyeon Gi;Kang, Sang Hyeok;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.715-723
    • /
    • 2015
  • Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

A Case of JTEL's ERP Implementation through ASP (ASP 방식을 통한 제이텔의 ERP도입사례)

  • Hahm, Yong-Seok;Nam, Ki-Chan
    • Information Systems Review
    • /
    • v.4 no.1
    • /
    • pp.19-31
    • /
    • 2002
  • The JTEL's success case of implementing ERP through ASP is studied in this paper. This paper especially presents the detail processes of implementing ERP through ASP and the advantages of that. Critical success factors in this case study are that pre-prepared ERP template and repetitive prototyping methodology was successfully utilized and that end users involved positively and accepted the standard best-practice processes of the ERP template in this project. These factors reduced ERP training periods and also the whole implementation periods, which made the project time quite short and TCO less. Considering these success factors, ASP method provides the advantages of global e-business IT environment, continuous new IT technologies and flexible response to the business changes to the small and medium firms. Finally, the paper suggests the new direction and possibility for small and medium firms focusing on the core competency and utilizing new system infrastructure through ASP method compared with in-house implementation.

A Study of Musculoskeletal Disorders at a Subway Train Repair Plant in Korea (국내 지하철 정비 사업장의 근골격계질환 실태조사에 관한 연구)

  • Kim, Cheol-Hong;Gwon, Yeong-Jun;Baek, Seung-Ryeol;Son, Gyeong-Il
    • Journal of the Ergonomics Society of Korea
    • /
    • v.23 no.3
    • /
    • pp.121-134
    • /
    • 2004
  • A research project was conducted to study work-related musculoskeletal disorders (MSDs) at subway train repair plant in Korea. The project was consisted of 4 main parts; education on the topics of MSDs for all workers, symptom survey, medical check-up, investigation of MSD risk factors. The result of symptom survey showed that 95.2% of the respondents complained pains on at least one part of the body. After cross-sectional analysis of various information and risk factors, 86.8% of respondents were considered as active health surveillance level 1 that require continuous monitoring on their symptoms and working conditions. And 57.1% of the respondents were considered as active health surveillance level 2 that needed medical check-ups for proper medical treatment. The analysis of occupational risk factors revealed that handling of heavy object (46.15%) and repeated awkward postures (46.15%) were two most contributing risk factors for the on-set of MSD at this work site followed by static strain (7.7%), and vibration and impact (3.8%). Medical examination was performed by an industrial medicine MD on 156 workers those considered as active health surveillance level 2. The result showed that 35 workers (20.7%) were considered as MSD patient group at severe level, and 68.6 workers (68.6%) were considered as moderate group and 18 workers (10.6%) were considered minor or normal group those have no symptom.

Establishment of Measurement Standards for Productivity Assessment in Construction Project (건설 프로젝트 생산성 평가를 위한 측정 기준 수립)

  • Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.3-12
    • /
    • 2022
  • In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.

A Study on the configuration and utilization of the schematic design BIM Template (계획설계 BIM 템플릿의 구성 및 활용에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Min, Young-Gi;Chung, Tae-Seung
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.3
    • /
    • pp.51-58
    • /
    • 2013
  • The projects are becoming more complicated and amplified as the design and development technology is advancing. Thus, existing architectural processes and methods are revealing limitations. The technology of BIM is an IT applied to construction, that provides the state-of-the-art tools to overcome these limitations to improve on architectural designing, technology, cost, etc. Therefore, it it necessary to converge the advises and collaboration from the various experts at the initial step in a common processing platform. In this research project with Korean Education Development Institute, configuration and utilization of EDU BIM template is studied because setting an anchor point from the initial phase is necessary for such processes at the perspective of the operator. The purpose of this study is to prevent time consumptions at the initial phase of BIM foundation, to ensure accurate information inputs within the repetitive tasks, and for effective information management that will produce consistent results through utilization of BIM technology.