• Title/Summary/Keyword: Repairing cost

Search Result 120, Processing Time 0.037 seconds

Probabilistic Analysis of Repairing Cost Considering Random Variables of Durability Design Parameters for Chloride Attack (염해-내구성 설계 변수에 변동성에 따른 확률론적 보수비용 산정 분석)

  • Lee, Han-Seung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.32-39
    • /
    • 2018
  • Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.

Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building (공동주택 하자소송의 균열하자보수비 비교.분석 연구)

  • Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.142-150
    • /
    • 2011
  • Defect dispute has been increasing to claim by condominium, in increasing to demand and concern in value, quality, and management of apartment building since 2000s. In this study, for checking property of cost in crack issue with precedure of lawsuit on defect, it is analyzing details about repairing cost of concrete crack defect that formed 77 percent of repairing cost. Futhermore, it is studying of composition of repairing cost and difference of repairing cost by repairing method. This is checking details that cost growth has a difference whether court accept a acceptable range of crack width, and repairing method and reinforcement work has to choose between a surface treatment method, a filling method and a injecting method. Meanwhile, it is considerable that disparity of repairing cost whether is a method of painting work.

A Study on the Repairing Cost Down Effects of the Car Bumper Systems with Gas tube in a Low Speed Crash Test (저속충돌시험을 통한 차량용 가스튜브범퍼의 복원수리비 절감효과에 대한 연구)

  • 박인송;조휘창
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.11 no.2
    • /
    • pp.182-189
    • /
    • 2003
  • We have found that the damage of the front part for a vehicle and that of the rear part for a vehicle are the majority of frequency experienced by the traffic accidents. In conventional bumper system was designed by safety standard regulation at low speed crash. For example there are 2.5 mile and 5 mile bumper. The conventional bumper system was the crash from max 5.5 mile to 3 mile low speed occurs most frequently and results in the highest rate of repairing cost in statistically. On this study, in order to check the damageability and repairability of gas tube bumper system RCAR 15 km/h 40 % offset frontal crash test was adopted in low speed and we have a gas tube bumper parts test and vehicle test with gas tube bumper, we can find gas tube bumper system definitely can improve the damageability and repairability of the vehicles and contribute to down the repairing cost.

Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach (Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

Trenchless Repairing-Reinforcing Process of Underground Pipes with Advanced Composite Materials (신소재 복합재료를 이용한 비굴착 지하매설관 보수-보강공법)

  • 진우석;권재욱;이대길;유애권
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2001.10a
    • /
    • pp.43-48
    • /
    • 2001
  • To overcome the disadvantages of conventional excavation technology, various trenchless (or excavation free, or no-dig) repair-reinforcement technologies have been developed and tried. But trenchless technologies so fat developed have some brawbacks such as high cost and inconvenience of operation. In this study, a repairing-reinforcing process for underground pipes with glass fiber fabric polymer composites using VARTM(Vacuum Assisted Resin Transfer Molding) has been developed. The developed process requires shorter operation time and lower cost with smaller and simpler operating equipments than those of the conventional trenchless technologies. For the reliable operation of the developed method, a simple method to apply pressure and vacuum to the reinforcement was devised and flexible mold technology was tried. Also, resin filling and cure status during RTM process were monitored with a commercial dielectrometry cure monitoring system, LACOMCURE. From the investigation, it has been found that the developed repairing-reinforcing technology with appropriate process variables and on-line cure monitoring has many advantages over conventional methods.

  • PDF

The study on salt injury and carbonation of concrete (도심지 상업 건축물의 리모델링 조사.연구)

  • 김동훈;이해진;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.136-141
    • /
    • 2001
  • If we build new building after demolition of commercial building that is located in the downtown, it will be caused a social and environmental problem as wasting of resources and generating of waste. In this study, I investigated about remodel ins, this conclusion is given below. 1. Reconstruction cost is 2.1 times, and construction period is 1.4 times as much remodeling. So remodeling has an advantage. 2. For repairing and reinforcing timeworn building, we reinforced it as using carbon fiber sheet (girder, slab) and injecting method steel plate bonding Also, we tried to maintain efficiency of new building as using epoxy to protect concrete crack. 3. In the side of waste products and cost, remodeling has much more advantage than reconstruct. But demolition used construction period much. Because it had to be reused as repairing and reinforcing. And there was no difference between remodeling cost and reconstruct cost. If we develop research with enterprise.university.laboratory to exploit material and equipment and to train specialized engineer who will has a capacity to know construct repair and reinforce, it can be attribute to prevail remodeling in new construct market.

  • PDF

A Study on the Development of Road Traffic Safety Moderator Robot using AHP (AHP분석을 통한 도로 교통안전지킴이 로봇 개발에 관한 연구)

  • Lee, Young Woo;Kwon, Hyuck Jun
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.159-167
    • /
    • 2014
  • PURPOSES : The purpose of this study is to analyze the requirements of the road traffic safety moderator robot when road repairing. The road traffic safety moderator robot is road traffic safety equipment and to conversions mechanical engineering and IT when road repairing. METHODS : The study used AHP based on the survey from road repair related expert that field engineers, design engineers, public officials and professors. The survey used paired comparison. The survey items were safety, convenience and economics. The safety is classified as visibility or efficiency, the convenience is classified as utility or mobility and the economics is classified as initial investment cost or maintenance $ management cost. The survey alternatives were the road traffic safety moderator robot, traffic regulation by human, traffic regulation by mannequin and traffic signs. The software for AHP is Expert Choice 2000. RESULTS : The results of AHP analyze, the weighted value of safety was analyzed with the highest at 0.488 of survey items. The weighted value of convenience was analyzed at 0.295, the weighted value of economics was analyzed at 0.218. The results of the road traffic safety moderator robot, the weight value of efficiency and utility were analyzed with the highest at 0.284 and 0.259 of alternatives. The weighted value of initial investment cost and maintenance & management cost were analyzed with the lowest at 0.203 and 0.211 of alternatives. The consistency test results of each items, null hypothesis is rejected because the CR values were 0.000 respectively. Therefore, the study results are consistency. CONCLUSIONS : The result of this study, overall value of the road traffic safety moderator robot came off second-best of other alternatives. The road traffic safety moderator robot has been received highest praise by the result of the study as good road traffic safety equipment when road repairing because the weighted values of efficiency and utility were analyzed with the highest of survey items. The efficiency mean securing safety and the utility mean practical assistance when road repairing. The results of this study showed that the road traffic safety moderator robot will effective for traffic safety when road repairing. economics and visibility are that supplementation of the road traffic safety moderator robot because the weighted values of economics and visibility were analyzed with the lowest of survey items. The consistency test results are consistency because the CR values were 0.000 respectively.

A Statistical Review on States Relating to Operation of Radiotherapy Equipments in Seoul National University Hospital (서울대학교병원의 방사선치료장비 운용 통계에 관한 고찰)

  • Park, Heung-Deuk;Kim, Wan-Sun;Ahn, Hee-Yong
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.6 no.1
    • /
    • pp.21-30
    • /
    • 1994
  • To analyze the states of operation of radiotherapy facilities in the period from 1979 to 1992 and to get the base for efficient operation and maintenance of the radiotherapy facilities. Data on the records of annual number of patients operated by each facility; span of suspension of operation, the cost and span of repairing, and parts of oui-of-order in the period from 1979 to 1992 were analyzed. We made a comparative analysis of average annual number of patients, annual span of the suspension of operation, annual cost ratio of repair, span of repairing per break down, and total number of broken parts. We could get following annual number of patients(day), span of the suspension of span ($\%$)(day). annual cost ratio fo repair($\%$), span of repairing per break down(Min-Max, day), and number of broken parts from this analysis. 1. Cobalt unit (Picker C-9) : 10,389(43), 0.4(0.83) 0.07, 1hr-2, 3 2. Linac(Clinac 6/100) : 11,492(50), 4.0(9.57), 0.98, 1hr-30, 12 3. Linac(Clinac 18) : 9.115(44), 12.7(30.5), 3.54, 1hr-108. 41 4. Simulator(Picker Ther-X) : 2,017(9), 0.51(1.3), 0.24, 1hr-2, 7 5. RTP(Capentec Cap-plan) : 528(2), 0.4(0.93), - hrs, - The conclusion obtained from statistical analysis above are as follows. 1. The rate of operation of Cobalt unit($99.6\%$) was higher that of Linear Accelerators ($87.3\%$). The rates operation of Simulator and RTP computer were very close to that of Cobalt unit. 2. In order to raise up the working ratio of accelerator. it is desirable that we keep our engineer to learn a sufficient technical skill and the equipment agent to stock sufficient spare parts. 3. In order to maintain Linear Accelerator efficiently, it is desirable to have annually $2.3\%$ of the purchase price of equiment for repairing.

  • PDF

Probability-Based LCCO2 Evaluation for Undergroung Structture with Repairing Timings Exposed to Carbonation (탄산화에 노출된 지하구조물의 보수횟수에 따른 LCCO2 평가)

  • Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.239-246
    • /
    • 2017
  • RC(Reinforced Concrete) structures can keep their performance during intended service life through initial service life and extension of the life through repairs. In the deterministic repairing method, cost and the related $CO_2$ emission increase with step-shaped escalation, however continuous results can be obtained through probabilistic repairing technique, and this is capable of reducing $CO_2$ emission through $CO_2$ absorption. In the work, repairing timing and $CO_2$ emission/absorption are evaluated based on the different methods like deterministic and probabilistic manner. The probabilistic technique considering $CO_2$ absorption with carbonation progress is evaluated to be very effective to reduction of $CO_2$ emission through extension of initial and additional service life due to repairs. When the variations of the service life from initial construction and repair material can be determined, the proposed technique can contribute to reduction of cost and $CO_2$ with decreasing repairing number.

Survey on the Utilization of Power Tiller (동력경운기 이용실태에 관한 조사연구 (김천 금릉지구))

  • 김창수
    • Journal of Biosystems Engineering
    • /
    • v.4 no.1
    • /
    • pp.67-74
    • /
    • 1979
  • This survey was carried out to grasp the actual condition of a power tiller utilization . Now, the power tiller has become the leading machinery in the field of agriculture throughout the country . Two hundred farm houses, located in the provincial districts of Kimcheon and kum0rung, hav etaken part in the survey from October 1, 1976 to September 30, 1977. The results are summarized as follows . 1. The average size of cultivated land of a farm household in the districts surveyed was 1.77ha which was bigger than that of whole country. And the average age of power tiller drivers was analyzed in which only 105 of total drivers was on their 30's. 2. Distribution of a power tiller utilization was appeared to be 34.4% for transporting , 24% for tilling , 23% for pumping , 11.5% for threshing and 6.6% for spraying. 3. Frequency of a power tiller utilization was high during the month of June, July and October while it was low during February and December . 4. Distribution of repairing cost was 8.5% for trailer, 7.1% for throttle lever and 6.7% for casket, respectively. The annual cost for repairing was 5,290 won.5. The annual cost for using a power tiller was composed of 51.5% of fixed cost and 48.5% of operating cost. 6. Economic analysis showed that it was not economically practical for individual ownership of a power tiller on the farm surveyed. Therefore, custom operation and joint ownership by a few farmers were recommended.

  • PDF