• 제목/요약/키워드: Repair period

Search Result 697, Processing Time 0.025 seconds

Efficacy of the Subclavian Portal Approach in Arthroscopic Repair of Isolated Subscapularis Tendon Tear

  • Chae, Seung Bum;Choi, Chang Hyuk;Jung, Suk-Han
    • Clinics in Shoulder and Elbow
    • /
    • v.17 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • Background: To evaluate the efficacy of the subclavian portal approach for the arthroscopic repair of isolated subscapularis tendon tear. Methods: We used the subclavian portal to carry out arthroscopic repair of the isolated subscapularis tendon tear. The surgery was carried out in 18 cases (average age of 53) from May 2006 to December 2009 with a mean follow-up period of 35 months. Of these cases, 13 patients had the tear in their dominant arms, 16 were male, and 12 were from traumatic ruptures with on average 7.6 months of symptom period to operation. Additional surgery, acromioplasty and subacromial debridement, were carried out on 4 cases each during the subscapularis repair. The integrity of cuff status was assessed by ultrasonographic examination at 6 months and at 1 year after operation. Results: The initial average range of motion in forward flexion, external rotation, and internal rotation were $160^{\circ}$, $50^{\circ}$ and L4, respectively. At the 1 year follow-up period, these improved to $160^{\circ}$, $52^{\circ}$ and T12, respectively. The initial average functional scores were assessed by KSS, ASES, UCLA, and Constant scoring systems, which were 67, 60, 26, and 65, respectively. These scores improved progressively with time. At 3 months after operation, the scores were 74, 67, 27, and 74; at 6 months, 83, 77, 31, and 75; at 1 year, 88, 86, 32, and 79; and at the final follow-up of 35 months, 84, 92, 34, and 84. Conclusions: In the repair of isolated subscapularis tendon tear, the subclavian portal approach provided a good angle for anchor insertion and sufficient space to manage the upper portion of the tendon tear. In turn, these provisions resulted in satisfactory clinical results.

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

Optimal replacement policy after extended warranty for a system with minimal repair warranty (최소수리 보증을 갖는 시스템에 대한 연장된 보증 이후의 최적의 교체정책)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2013
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a replacement model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective and suggest the optimal replacement period after extended warranty. Finally, a few numerical examples are given for illustrative purpose.

Optimal Warranty Policy for Free Two-phase Warranty (무료 이단계 보증에 대한 최적의 보증 정책)

  • Ki Mun Jung
    • Journal of Integrative Natural Science
    • /
    • v.17 no.2
    • /
    • pp.43-51
    • /
    • 2024
  • Jung et al.(2015) suggest the two-phase warranty model, which is a general type of warranty model. Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. And warranty policies play a very important role in product marketing. In this paper, we suggest the optimal warranty policy for free extended two-phase warranty. To determine the optimal warranty period, we adopt the expected profit per unit product. So, the expressions for the total expected cost, the sale price and the expected profit per unit product from the manufacturer's point of view are derived. Also, we discuss the optimal warranty period and the numerical examples are provided to illustrate the proposed the warranty policy.

Preventive maintenance policy following the expiration of replacement-repair warranty (교체-수리보증이 종료된 이후의 예방보전정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.12 no.2
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

The Role of Intraoperative Echocardiograpby after Repair of Complete Atrioventricular Septal Defect (완전방실중격결손증 수술후 심에코도의 역할)

  • 홍유선
    • Journal of Chest Surgery
    • /
    • v.27 no.11
    • /
    • pp.902-906
    • /
    • 1994
  • Between May 1991 and August 1993, 16 patients underwent repair of complete atrioventricular septal defect without another major anomaly at Cardiovascular Center,Yonsei University College of Medicine. Ages of the patients ranged from 3 months to 38 years with a mean of 42 months. Among 16, 10 patients[63%] are associated with Down`s syndrome. All patients underwent primary repair except and one who received had been repaire of coactation of aorta and patent ductus arteriosus 2 month before. Preoperative mitral valve regurgitation [MR] was evaluated with Doppler echocardiography and angiography which revealed absent or grade I in 1, grade II in 8, grade III in 4, and grade IV in 3. Operative technique was performed under the moderate hypothermic cardiopulmonary bypass with crystalloid cardioplegia. Intraoperative echocardiography was performed epicardial approach [n=7] in the operative table or transthoracic approach [n=9] at intensive care unit. In all patients except 3, MR were improved. But in 3 patients, was not improved or exagerated comparing preoperative one. All of them were died.One patient was showed MR grade IV in intraoperative echocardiography, we re-repaired atriventricular valve with cardiopulmonary bypass. During follow-up period [at a mean of 11 months after repair], doppler echocardiography was performed in all patients. The follow up echocardiography revealed that the degree of MR in immediate postoperative period was not changed except in two patients in whom it was aggravated. Thus it seems that intraoperative and early postoperative echocardiography was employed important role of survival and can be predictable for long term results.

  • PDF

Analysis of Damage Patterns for Gas Turbine Combustion Liner according to Model Change (모델 변천에 따른 가스터빈 연소기 라이너의 부위별 손상유형 분석)

  • Kim, Moon-Young;Yang, Sung-Ho;Park, Sang-Yeol;Kim, Sang-Hoon;Park, Hye-Sook;Won, Jong-Beom
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2862-2867
    • /
    • 2008
  • High-temperature components of gas turbine operated for certain period of time can be reused by being repaired or rejuvenated. In case of the gas turbine combustion liners, the biggest and the most important one in the high-temperature components, come in a repair shop after operated for 8,000 or 12,000 hours according to the model and go through the repair and rejuvenation in order to be reused. A stated combustion liner is the first channel which has the combustion gas reached a nozzle from a fuel nozzle. Materials and coating properties of old and new model combustion liners were investigated. To repair these components after the visual inspection, the coatings of combustion liners were removed and then FPI(Fluorescent Penetrant Inspection), a kind of the NDI(Non-Destructive Inspection), was conducted. Damage patterns and the number of the damaged components were classified and analyzed based on data provided from the visual inspection over a long period of time. Focusing on the difference between old model and new model combustion liners, we analyzed the damage distribution and changes and consequently concluded that new model combustion liner would increase repair rate.

  • PDF

A Study on the Changes Process Repair and Restoration Method of Ceramic (도자기 수리복원 방법의 변천과정에 관한 고찰)

  • Yang, Pil-Seung;Seo, Jung-Ho
    • Journal of Conservation Science
    • /
    • v.27 no.1
    • /
    • pp.49-59
    • /
    • 2011
  • The damaged ceramics were repaired and restored thru various methods with various materials. The history of Ceramic repair and restoration has developed widening its areas from traditional stage utilizing applicable living material to the specified field that introduces new materials, new process methods and material analysis. Through investigations over the documents, artifacts and analysis, the period could be divided into natural material period in which uses the bonds extracted from the animals, plants and lime (prehistoric to Japanese domination period), Semi-artificial period in which mix natural material and synthetic resins such as "Jusabi"(Japanese domination period to 1970s.) and complete synthetic resin period in which introduces new materials and process methods in accordance with preservation standard (after 1980s).

A study on the correlation of tourism development with conservation activities in the 1930s through the repair work on the main building of J angansa temple (장안사 대웅전 보존 수리공사와 1930년대 금강산 개발 - 근대기 건축문화유산 보존과 관광지 개발의 영향관계 연구)

  • Seo, Hyowon
    • Journal of architectural history
    • /
    • v.29 no.3
    • /
    • pp.25-36
    • /
    • 2020
  • The purpose of this study was to analyze the correlation between conservation activities and the development of tourism in the modern period in the Korean peninsula. The main building of Jangansa Temple, located in Mt. Geumgang, was repaired in the 1930s. During the repairs, the Japanese General-Government actively engaged in the development of Mt. Geumgang and raised funds for the operation of the Korean Peninsula through tourism revenue. The repair work was carried out under the influence of the Mt. Geumgang development project. And its influence is revealed by reviewing official documents recording repair work. This study tried to clarify the relationship between development and repair work through official documents.

An Experimental Investigation on the Fatigue Strength of Replacement Repair Butt-Welded Joints of Steel Structural after a period of Prolonged Service (노후 강교량의 보수.보강 용접부의 피로강도에 대한 실험적 연구)

  • Jang, Gyeong-Ho;Choe, Ui-Hong;Lee, Jin-Hyeong;Lee, Jin-Hui;Jang, Gap-Cheol;Yang, Yeong-Jin
    • Proceedings of the KWS Conference
    • /
    • 2006.10a
    • /
    • pp.277-279
    • /
    • 2006
  • Due to the numerous environmental factors, cracks and corrosion are frequently occured especially in old steel bridge, which deteriorate the structural integrity; thus bring about the problems of structural safety of the steel bridge. Therefore, repair and reinforcement are required for the damaged structure. the replacement repair welding method is spotlighted for its brilliant features, i.e. it can be achieved without incurring traffic dislocation. the method cuts the damaged parts and replaces them with new steel plate by welding under live loads. However, the mechanical behavior of the welded joints under cyclic loads due to the traffic which passes along bridge is not clarified. In this paper, the fatigue strength of the replacement repair welded joints was investigated in order to improve reliability in the repair welded joints of old steel bridge.

  • PDF