• Title/Summary/Keyword: Repair facility

Search Result 145, Processing Time 0.023 seconds

Development of System Repairing & Reinforcing for Irrigation & Draingage Structure (농업기반 수리구조물의 보수보강 공법 시스템 구축)

  • Kim, Kwan-Ho;Park, Kwang-Su;Kim, Myeong-Won;Lee, Joon-Gu;Kim, Han-Joong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.153-156
    • /
    • 2005
  • It is not feasible for agricultural facility managers to estimate how severe damages are and what are causes of them when agricultural hydraulic facilities get damaged for some reasons. Moreover, it is nearly impossible for agricultural facility managers to take immediate actions to repair and reinforce the damaged structures. Thus, there have been needs for well-established systems to help agricultural facility managers understand its severity and causes, and take proper actions to reduce speed of deterioration and to repair/reinforce them. Thus repairing and reinforcing systems of agricultural hydraulic structures based on agricultural facility management policies, developed in this study, can be efficiently used in field works to determine top priority location and the budget of repairing and reinforcing projects if detailed information of damages in concrete structures and damage types are well compiled and classified with standardized image data complemented.

  • PDF

Development of system repairing & reinforcing for irrigation & draingage structure (농업기반 수리구조물의 보수보강 공법 시스템 구축)

  • Kim, Kwan-Ho;Park, Kwang-Su;Kim, Myeong-Won;Lee, Joon-Gu;Kim, Han-Joong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05b
    • /
    • pp.289-292
    • /
    • 2005
  • It is not feasible for agricultural facility managers to estimate how severe damages are and what are causes of them when agricultural hydraulic facilities get damaged for some reasons. Moreover, it is nearly impossible for agricultural facility managers to take immediate actions to repair and reinforce the damaged structures. Thus, there have been needs for well-established systems to help agricultural facility managers understand its severity and causes, and take proper actions to reduce speed of deterioration and to repair/reinforce them. Thus repairing and reinforcing systems of agricultural hydraulic structures based on agricultural facility management policies, developed in this study, can be efficiently used in field works to determine top priority location and the budget of repairing and reinforcing projects if detailed information of damages in concrete structures and damage types are well compiled and classified with standardized image data complemented.

  • PDF

Determining of an Optimal Spares Stocking Policy with Reliability Improvement

  • Jun Hong Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.56
    • /
    • pp.1-8
    • /
    • 2000
  • We present in this paper an optimal stocking policy for a repairable inventory system under reliability improvement. For this purpose we illustrate commercial flight lines with a large number of planes. This model is supported by a central repair facility. For modeling the nonstationary M/M/s system we implemented SIMAN for computing the time dependent number of units in the repair facility with any number of units. In this model we provide the required inventory level at each location. 1y month. for various levels of associated stock-out risk.

  • PDF

The Study on Application of Advanced Maintenance and RePairBudgeting Model for Domestic Military Facilities (국방시설에 적합한 선진 유지관리예산모델의 적용에 관한 연구)

  • Park Chan-Sik;Hong Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.123-131
    • /
    • 2002
  • The M&R(Maintenance & Repair) budgeting system for domestic military facilities based incremental budgeting model has caused many problems due to the difference between M&R requirement and budget, so military facility become early deterioration. this study proposes the application method of foreign M&R budgeting model for domestic military facility to improve current M&R budgeting system. In order to investigate the current status and problem of M&R budgeting system, this study reviewed various literature related characteristics and types of the foreign M&R budgeting model. The interview was performed for domestic military facility official. The model would greatly improve the current M&R budgeting process for the domestic military facilities.

Maintenance Case and Cost Analysis for University Facilities (대학시설물의 유지보수 건수 및 비용 분석)

  • Shin, Myeoung-Ha;Lee, Chan Sik
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.23 no.6
    • /
    • pp.27-34
    • /
    • 2016
  • Although the scale and number of university facilities have increased, the maintenance of these facilities has not been efficient as maintenance costs incurred during facility operation periods, as well as management time, have not been sufficiently considered. In this study, the maintenance record data of national universities was compared and analyzed to analyze factors that incur maintenance costs according to the uses and costs of the facilities. According to the results, the number of cases of maintenance and repair work for basic educational facilities was shown to be the largest, accounting for 79%. The number of maintenance and repair work occurred according to work type was examined. According to the results, the highest ratio of maintenance and repair work occurred in the field of construction, specifically, the maintenance costs required for facility supplementation accounted for the highest ratio. Maintenance costs per unit area decreased over time in the newer university facilities, while showing a tendency to increase in older university facilities. However, there were cases where maintenance costs did not show any trends due to factors such as the limited maintenance budgets owing to the characteristics of public service facilities and facilities in the stage of deterioration or destruction after the stage of stabilization. This study is considered to be helpful for efficient university facility maintenance plans and budget calculations.

Patterns in User Requests for Facility Management Services in Higher Education Facilities (대학 시설물 유지관리 서비스 사용자 요청 패턴 분석)

  • Uhm, Miyoung;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.95-96
    • /
    • 2015
  • This paper aims to identify patterns in users' requests for facility management (FM) services in higher education facilities. We analyzed data collected from 309 service request forms, made available via a department office and an enterprise resource planning system, at a private university in Seoul between May 2009 and February 2015. We found that the number of user requests were the highest in September and October. Requests for electronic and communication (E/C) services outnumbered those for architectural services and mechanical and plumbing (M/P) services. Repair requests for doors and windows were the most common under architectural services; repairs for air-conditioners and radiators were the most commonly under M/P services; and installation of electrical outlets, telephone wires, and internet services were the most sought-after E/C services. Maintenance requests were received every three months, while repair requests were received every six or seven months.

  • PDF

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A Study on Improvement Measures of Energy Recovery Efficiency through Analysis of Operational Status of Municipal Solid Waste Incineration Facilities (생활폐기물 소각시설의 운영 실태 분석을 통한 에너지회수 효율 개선방안 검토)

  • Park, Sang-Jin;Phae, Chae-gun
    • Journal of Korea Society of Waste Management
    • /
    • v.35 no.8
    • /
    • pp.762-769
    • /
    • 2018
  • This study was carried out to examine the improvement plan by analyzing the characteristics of imported wastes, operation rate, and benefits of energy recovery for incineration facilities with a treatment capacity greater than 50 ton/day. The incineration facility capacity increased by 3,280 tons over 15 years, and the actual incineration rate increased to 2,783 ton/day. The operation rate dropped to 76% in 2010 and then rose again to 81% in 2016. The actual calorific value compared to the design calorific value increased by 33.8% from 94.6% in 2002 to 128.4% in 2016. The recovery efficiency decreased by 29% over 16 years from 110.7% to 81.7% in 2002. Recovery and sales of thermal energy from the incinerator (capacity 200 ton/day) dominated the operation cost, and operating income was generated by energy sales (such as power generation and steam). The treatment capacity increased by 11% to 18% after the recalculation of the incineration capacity and has remained consistently above 90% in most facilities to date. In order to solve the problem of high calorific value waste, wastewater, leachate, and clean water should be mixed and incinerated, and heat recovery should be performed through a water-cooled grate and water cooling wall installation. Twenty-five of the 38 incineration facilities (about 70%) are due for a major repair. After the main repair of the facility, the operation rate is expected to increase and the operating cost is expected to decline due to energy recovery. Inspection and repair should be carried out in a timely manner to increase incineration and heat energy recovery efficiencies.

A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation (내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구)

  • Kim, Jang-Ook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

A Simulation Study of Navy Drydocks (해군 건선거 모의실험 연구)

  • Jo Deok-Un
    • Journal of the military operations research society of Korea
    • /
    • v.9 no.2
    • /
    • pp.23-30
    • /
    • 1983
  • A simulation study was conducted to determine optimum capacity of Navy drydock facility using GASP-IV, an advanced FORTRAN-based simulation language, under demands of regular overhauls and emergency repairs by ships of an hypothetical fleet composition. Three year dock usage data was analyzed to produce probability distributions underlying drydock repair demands. The present facility size of two drydocks was simulated and was found to be somewhat short of adequate service capability, showing excessive average waiting time and average queue length. The simulation model was then modified to include an additional drydock of similar size as the other two and a year's simulation was again conducted. All repair needs were quite satisfactorily met and all docks showed very high utilization factor (0.98). This contributed to an increase in the fleet's ship availability from 0.95 to 0.99. This study illustrates the usefulness of simulation technique as a tool for analyzing policy alternatives in military long-term investment areas.

  • PDF