• Title/Summary/Keyword: Repair Work

Search Result 411, Processing Time 0.027 seconds

Development of Satisfaction Scale of School Toilet - Targeting schools that was completed repair work in Seoul - (학교 화장실 만족도 척도 개발 - 서울시 화장실 보수공사 완료 학교를 중심으로 -)

  • Ko, Seong-Ja
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.3
    • /
    • pp.15-21
    • /
    • 2017
  • The purpose of this study was to develop satisfaction scale of school toilet that was completed repair work and examine its validity. In order to develop general and scientific satisfaction scale, the data was collected and analyzed targeting 3,694 participants from seventy schools which were elementary, middle, and high schools participating in improvement projects of school toilet in 2015 and 2016. Satisfaction scale of seventeen items was developed by using exploratory factor analysis and confirmatory factor analysis. Total Cronbach's ${\alpha}$ of seventeen items resulted in .950. Factor loading indicated over 0.6. Factor explanation of each item showed that was relatively high. This scale can be used to research unit school satisfaction and utilized for further research. The implication of this study was a reliable and valid instrument for measuring the satisfaction of school toilet.

A Study on the Development of the Wheel Tracking Test and Evaluation Method on Blind Type of Waterproofing Layer (비노출 방수층의 윤하중 시험 및 평가방법 개발에 관한 실험적 연구)

  • Song Je-Young;Eom Deok-Jun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.67-72
    • /
    • 2006
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and condrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load.

A Field Investigation of Defect Type for Development of Maintenance Manual of Han-ok (한옥 유지관리매뉴얼 개발을 위한 결함 유형 현장 조사)

  • Lee, Jong Shin;Choi, Gwang Sik;Yang, Jeong Moo
    • Journal of the Korea Furniture Society
    • /
    • v.24 no.3
    • /
    • pp.302-308
    • /
    • 2013
  • To collection of field data for development of maintenance manual of Han-ok, we investigated defects which occurred in members of Han-ok by field investigation. The noticeable defects were wood cracks, gaps that developed between wood pillar and wall or wood window frame and tenon joints. The most common biological defect was blue stain which was created in log. The mold generation was observed on exterior wood and wall which get wet by precipitation. The gaps between members of Han-ok pointed out as defect that is urgently improved by residents of Han-ok. The reason is mainly due to poor of insulation in winter by bad confidentiality. The maintenance work of defect such as gap was conducted personally. As a result, the repair parts were ugly for unfamiliar repair work.

  • PDF

A Study on the Blind Type of Waterproofing Layer of Wheel Tracking of Test Method and Valuation on Working of Live Load (이동하중이 작용하는 비노출 방수층의 윤하중 시험방법 및 평가에 관한 연구)

  • Eom Deok-Jun;Seon Yun-Suk;Kwon Si-Won;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.1-5
    • /
    • 2005
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and concrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load

  • PDF

RESEARCH OF THE BEST TIMING FOR GOVERNMENT'S TERMINATION OF FREEWAY REPAIR WORK CONTRACT

  • Jin-Fang Shr;Da-Jung Chang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.699-704
    • /
    • 2005
  • Normally, monetary penalties for breach of agreement will be stipulated in the contract. The contractor parties, who fail to fulfill the agreement, are required to pay the other parties a certain amount or proportion of money as a fine. However, it is worth our study - whether or not the scope of monetary penalty implementation and bases for determination of a fine will cover the losses of social and administrative costs incurred by the interruption of the contract. This research is about the best timing for government to cancel the freeway repair work contracts. Under the goal of the maximum social welfare, the limitation of government spending for the social and administrative costs invoked by interruption of contracts will have to be considered to attain the best timing of contracts' suspension or deferment. According to the factors of social and administrative costs, the best time point is calculated to reduce the loss of the aforesaid costs, which can also be used as theoretical basis for the future road-widening construction at home.

  • PDF

A Study on Need for Safe Baseline Isolation Standard for Chemical Plant Equipment (화학공장 설비의 안전한 격리 표준 필요성에 대한 연구)

  • Su-Ji Choi;Sang-Gil Kim;Gyu-Sun Cho
    • Industry Promotion Research
    • /
    • v.8 no.4
    • /
    • pp.37-46
    • /
    • 2023
  • Due to the aging, advancement, and complexity of chemical facilities, non-routine work such as facility inspection, repair, or maintenance work is increasing. Of the 1,483 accidents that occurred over the past 10 years at chemical product manufacturing sites subject to PSM, accidents that occurred during non-routine work accounted for 56% (932 Cases) of the total. It can be seen that more accidents occur during non-routine work than during routine work. In particular, in order to improve the economy and efficiency of factory operation, there are cases where some facilities are stopped without stopping the entire factory and then inspection, repair, or maintenance work is performed while isolated from the operating facilities. Therefore, first, a safe isolation method must be selected by establishing an isolation standard (Baseline Isolation Standard) based on the chemicals handled, operating conditions, and risk level of the equipment in the chemical plant. Second, since current domestic laws and standards do not suggest the need for specific quarantine standards, it is necessary to institutionalize the preparation of quarantine standards. Technical and institutional improvements are needed to prevent fires, explosions, and poisoning accidents caused by leaks of chemical substances.

A Study on the Performance Evaluation Method of Waterproofing-Seal as Leakage Crack Repairing Material using in Wet Environment Structure (습윤 환경 구조물에 적용하는 누수균열 보수용 방수씰의 성능평가 방법에 관한 연구)

  • 강효진;우영제;강호경;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.43-48
    • /
    • 2002
  • Since the basement building like the communication hole and etc. is built under the ground where it is pressed by the water, the leakage happens due to the dried-shrinking crack, the sinking crack, the creation of the work-joint of the building and etc. caused by the character of the material and construction way of the reinforced concrete building. Especially, a lot of repair for the leakage cannot help but being taken in temporary way without any noticeable countermeasure. Therefore, this kind of repair is socially criticized many times that this is defective construction even if this costs a lot. The fundamental reason of the above mentioned symptoms can be found in the creation of the work-joint caused by the character of the concrete building, the limitation of the physical performance of the existing water-proof and repair material, the limitation of the construction, the limitation of the physical sustaining performance of the concrete building, the limitation(heat-injury, deterioration) of the constancy of the durability caused by aging and etc. Therefore, in this study, we would like to present the better understanding on the water-proof seal relating to the application at the spot and its test evaluation related data since the necessity of the establishment of the quality control standard and the performance testing way on the relevant water-proof seal is rising a lot to regulate the water-proof technology and the leakage repair technology in accordance with the growth of the demand on the facility.

  • PDF

A Survey on Procedural Sedation and Analgesia for Pediatric Facial Laceration Repair in Korea

  • Dongkyu Lee;Hyeonjung Yeo;Yunjae Lee;Hyochun Park;Hannara Park
    • Archives of Plastic Surgery
    • /
    • v.50 no.1
    • /
    • pp.30-36
    • /
    • 2023
  • Background Most children with facial lacerations require sedation for primary sutures. However, sedation guidelines for invasive treatment are lacking. This study evaluated the current status of the sedation methods used for pediatric facial laceration repair in Korea. Methods We surveyed one resident in each included plastic surgery training hospital using face-to-face interviews or e-mail correspondence. The health care center types (secondary or tertiary hospitals), sedation drug types, usage, and dosage, procedure sequence, monitoring methods, drug effects, adverse events, and operator and guardian satisfaction were investigated. Results We included 45/67 hospitals (67%) that used a single drug, ketamine in 31 hospitals and chloral hydrate in 14 hospitals. All health care center used similar sedatives. The most used drug administered was 5 mg/kg intramuscular ketamine (10 hospitals; 32%). The most common chloral hydrate administration approach was oral 50 mg/kg (seven hospitals; 50%). Twenty-two hospitals (71%) using ketamine followed this sequence: administration of sedatives, local anesthesia, primary repair, and imaging work-up. The most common sequence used for chloral hydrate (eight hospitals; 57%) was local anesthesia, administration of sedatives, imaging work-up, and primary repair. All hospitals that used ketamine and seven (50%) of those using chloral hydrate monitored oxygen saturation. Median operator satisfaction differed significantly between ketamine and chloral hydrate (4.0 [interquartile range, 4.0-4.0] vs. 3.0 [interquartile range, 3.0-4.0]; p <0.001). Conclusion The hospitals used various procedural sedation methods for children with facial lacerations. Guidelines that consider the patient's condition and drug characteristics are needed for safe and effective sedation.

A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work (보도용 블록포장 유지보수 공사 원가산정기준 개정 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF