• Title/Summary/Keyword: Repair Work

Search Result 411, Processing Time 0.024 seconds

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

The Characteristics of the Fatal Accidents Caused by Fire, Explosion and Asphyxiation during Welding and Flame Cutting in the Manufacturing Industry (제조업에서의 용접·용단 작업 중 화재·폭발·질식 사망사고 특성)

  • Seo, Dong-Hyun;Han, Ou-Sup;Lee, Keun-Won
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.21-27
    • /
    • 2019
  • Many accidents have been occurring during welding and flame cutting work related to maintenance and repair as the domestic manufacturing facilities gradually become decrepit. However, it is not easy to find the accurate statistics and analysis data on accidents occurring during welding or flame cutting operations related to maintenance and repair of machinery and equipment. Therefore, in this study, the fatal accident cases of fire/explosion and asphyxiation that occurred during the welding and flame cutting work in the manufacturing industry were collected and their characteristics were analyzed. Then, we tried to find the connection of the accidents according to the machinery/equipment and the work content, and to provide the materials and measures that can be used to prevent the similar accidents. We collected 329 cases of the fatal accidents related to fire/explosion and leakage/contact of chemical substances in the domestic manufacturing industry during the last 10 years (2008 ~ 2017). Among them, 72 accidents occurred during welding or flame cutting were extracted and the related reports were investigated whether they occurred during usual work or unusual work. Also, the machinery/equipment and the work content related to the accidents were classified and analyzed based on the criteria. The analysis results showed that 31 cases of the fire/explosion accidents occurred during usual work and 32 cases during unusual work, and it was found that 9 cases of asphyxiation death occurred during usual work. Then, from the analysis results, the connections of the machinery/equipment and the work contents related to the accidents were schematized into a accident tree.

A Experimental Study on the Performance Test of Water Leakage Repair Materials for Water Expansion Acrylic Resin (아크릴 수지계 수팽창성 누수보수재의 재료적 성능평가에 관한 실험적 연구)

  • Hong Chae Han;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.51-56
    • /
    • 2005
  • It does not find for solution by limitation of technological mechanism of existent of leakage maintenance material. So, it is paid for huge expense because continuous repeat maintenance work is consisting. Furthermore, it is indicated by big problem in construction work that is constructed by field experience that thing by definite and systematic theory is not with proper performance test and analysis up to now. Therefore, wish to measure physical performance change by various environment condition maintenance of structure and performance construction work aspect in that apply to water leakage maintenance material using of acrylic resin system water expansion, leakage maintenance material in this research, and present suitable form of construction work under these environment. also, wish to ready diversified remedy by oversea market opening.

  • PDF

Treatment of Concrete Wastewater in Repair of Bridge Deck (교량 바닥판 보수공사에서 발생하는 콘크리트 폐수처리 방안)

  • Lee, Bong-Hak;Choi, Pan-Gil;Kim, Jung-Ki
    • Journal of Industrial Technology
    • /
    • v.28 no.A
    • /
    • pp.125-132
    • /
    • 2008
  • As of 2003, construction waste has been produced at the level of 130,614.8 tons/day, in which the amount of waste concrete was 92,639.1 tons/day and accounted for about 66.4% of the amount of construction waste. Waste concrete is mainly produced in construction work and civil engineering work. Especially, road surface crushing method using a large amount of water requires thorough management of concrete wastewater. The aim of this study was to analyze water pollution due to concrete wastewater generated in repair of bridge deck using road surface crushing equipment and to suggest reasonable countermeasures for solve the problem. In this study, it was surveyed current conditions of produced concrete wastewater in bridge deck repair, analyzed physical features of concrete wastewater, expected effects of water pollution on inflow rivers if it is not treated, established treatment plan of water pollution by categories, and calculated capacity of each treatment process and required amount of necessary chemicals. As a result of sampling wastewater generated in field sites and testing it at a lab scale, it was revealed that the original wastewater was produced in removing concrete from bridge deck slabs using surface crushing equipment whose pH was 12.53, CODMn was 12.910mg/L, SS was 547.0mg/L, and other heavy metals were included in extremely small quantities.

  • PDF

A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation (내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구)

  • Kim, Jang-Ook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

Arthroscopic Repair of Traumatic Anterior Shoulder Instability with Small Glenoid Bone Defect (관절와에 작은 골결손을 가진 외상성 전방 불안정 견관절의 관절경적 봉합 치료)

  • Koo Bon-Seop;Jeong Hwa-Jae
    • Clinics in Shoulder and Elbow
    • /
    • v.7 no.2
    • /
    • pp.70-75
    • /
    • 2004
  • Purpose: To evaluate the results of arthroscopic repair of traumatic anterior shoulder instability with glenoid bone defect. Materials and Methods: Nineteen patients who had underwent arthroscopic repair for the shoulder with traumatic anterior instability and glenoid bone defect were retrospectively reviewed. Mean age was 24.6 years(range, 20 to 39) and mean follow-up was 23 months(range, 19 to 55). No glenoid bone defect was greater than 7mm in length and 20% of the glenoid. The results were evaluated according to stability, range of motion and function. Results: All patients obtained excellent-good results according to Rowe scoring system. Two patients(10.5%) had instability. The mean loss of external rotation was 15 degrees (range, 0 to 25). Functionally, 17 patients could participate in preinjured work or sports to the same level with or without mild discomfort. The remained 2 patients who had 25 degree loss of external rotation could not play sports. Conclusion: Though arthroscopic repair is a good treatment for traumatic anterior shoulder instability with small glenoid bone defect, it is possible to cause loss of external rotation

Cost-Driven Optimization of Defect-Avoidant Logic Mapping Strategies for Nanowire Reconfigurable Crossbar Architecture (Nanowire Reconfigurable Crossbar 구조를 위한 결함 회피형 로직 재할당 방식의 분석과 총 비용에 따른 최적화 방안)

  • Lee, Jong-Seok;Choi, Min-Su
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.37 no.5
    • /
    • pp.257-271
    • /
    • 2010
  • As the end of photolithographic integration era is approaching fast, numerous nanoscale devices and systems based on novel nanoscale materials and assembly techniques are recently emerging. Notably, various reconfigurable architectures with considerable promise have been proposed based on nanowire crossbar structure as the primitive building block. Unfortunately, high-density sys-tems consisting of nanometer-scale elements are likely to have numerous physical imperfections and variations. Therefore, defect-tolerance is considered as one of the most exigent challenges in nanowire crossbar systems. In this work, three different defect-avoidant logic mapping algorithms to circumvent defective crosspoints in nanowire reconfigurable crossbar systems are evaluated in terms of various performance metrics. Then, a novel method to find the most cost-effective repair solution is demonstrated by considering all major repair parameters and quantitatively estimating the performance and cost-effectiveness of each algorithm. Extensive parametric simulation results are reported to compare overall repair costs of the repair algorithms under consideration and to validate the cost-driven repair optimization technique.

Review of the UBC Porcine Model of Traumatic Spinal Cord Injury

  • Kim, Kyoung-Tae;Streijger, Femke;Manouchehri, Neda;So, Kitty;Shortt, Katelyn;Okon, Elena B.;Tigchelaar, Seth;Cripton, Peter;Kwon, Brian K.
    • Journal of Korean Neurosurgical Society
    • /
    • v.61 no.5
    • /
    • pp.539-547
    • /
    • 2018
  • Traumatic spinal cord injury (SCI) research has recently focused on the use of rat and mouse models for in vivo SCI experiments. Such small rodent SCI models are invaluable for the field, and much has been discovered about the biologic and physiologic aspects of SCI from these models. It has been difficult, however, to reproduce the efficacy of treatments found to produce neurologic benefits in rodent SCI models when these treatments are tested in human clinical trials. A large animal model may have advantages for translational research where anatomical, physiological, or genetic similarities to humans may be more relevant for pre-clinically evaluating novel therapies. Here, we review the work carried out at the University of British Columbia (UBC) on a large animal model of SCI that utilizes Yucatan miniature pigs. The UBC porcine model of SCI may be a useful intermediary in the pre-clinical testing of novel pharmacological treatments, cell-based therapies, and the "bedside back to bench" translation of human clinical observations, which require preclinical testing in an applicable animal model.

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.