• 제목/요약/키워드: Repair Method

검색결과 1,621건 처리시간 0.028초

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2002년도 추계학술발표대회
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

Time Series Data Cleaning Method Based on Optimized ELM Prediction Constraints

  • Guohui Ding;Yueyi Zhu;Chenyang Li;Jinwei Wang;Ru Wei;Zhaoyu Liu
    • Journal of Information Processing Systems
    • /
    • 제19권2호
    • /
    • pp.149-163
    • /
    • 2023
  • Affected by external factors, errors in time series data collected by sensors are common. Using the traditional method of constraining the speed change rate to clean the errors can get good performance. However, they are only limited to the data of stable changing speed because of fixed constraint rules. Actually, data with uneven changing speed is common in practice. To solve this problem, an online cleaning algorithm for time series data based on dynamic speed change rate constraints is proposed in this paper. Since time series data usually changes periodically, we use the extreme learning machine to learn the law of speed changes from past data and predict the speed ranges that change over time to detect the data. In order to realize online data repair, a dual-window mechanism is proposed to transform the global optimal into the local optimal, and the traditional minimum change principle and median theorem are applied in the selection of the repair strategy. Aiming at the problem that the repair method based on the minimum change principle cannot correct consecutive abnormal points, through quantitative analysis, it is believed that the repair strategy should be the boundary of the repair candidate set. The experimental results obtained on the dataset show that the method proposed in this paper can get a better repair effect.

A Novel BIRA Method with High Repair Efficiency and Small Hardware Overhead

  • Yang, Myung-Hoon;Cho, Hyung-Jun;Jeong, Woo-Sik;Kang, Sung-Ho
    • ETRI Journal
    • /
    • 제31권3호
    • /
    • pp.339-341
    • /
    • 2009
  • Built-in redundancy analysis (BIRA) is widely used to enhance the yield of embedded memories. In this letter, a new BIRA method for both high repair efficiency and small hardware overhead is presented. The proposed method performs redundancy analysis operations using the spare mapping registers with a covered fault list. Experimental results demonstrate the superiority of the proposed method compared to previous works.

  • PDF

In-line Automatic defect inspection and repair method for TFT-LCD production

  • Honoki, Hideyuki;Arai, T.;Edamura, T.;Yoshimura, K.;Nakasu, N.
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권1호
    • /
    • pp.286-289
    • /
    • 2007
  • We have developed an automated circuit defect inspection and repair method that can be used to improve the yield ratio of TFT-LCD. The method focuses on correcting resist patterns after the development process to ensure shape regularity. We built a prototype system and confirmed that the method is valid.

  • PDF

Optimal Number of Failures before Group Replacement under Minimal Repair

  • Young Kwan, Yoo
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.61-70
    • /
    • 2004
  • In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

석굴암, 세 번의 수리 공사와 세 개의 공간 개념 - 석굴암 건축과 안팎의 공간 구분을 중심으로 - (Thrice Repair Works and Three Space Conceptions in Seokguram - focusing on Seokguram Architecture and Virtual Space Division of Inside and Outside -)

  • 윤재신
    • 대한건축학회논문집:계획계
    • /
    • 제35권8호
    • /
    • pp.89-100
    • /
    • 2019
  • The purpose of this study is to critically review the repair works of Seokguram architecture and to search for its original form and space. Seokguram's architectural form has been transformed throughout three repair works. The first transformation occurred during the repair work of the Colonial Government in 1913-1915, and the second occurred during the repair work of the Colonial Government in 1920-1923. The repair work done by the Korean Government in 1961-1964 also caused a severe change in the architectural form and space of Seokguram architecture. The more the repair work was added to Seokguram, the more its original form flew away like a mirage. Through the three repair works, the spatial composition of Seokguram changed in the following directions: from ((front chamber + passageway) + main chamber) to (front chamber + (passageway + main chamber)) through the second repair work, from (front chamber + (passageway + main chamber)) to (front chamber + passageway + main chamber) through the last repair work. Although the compositional space hierarchy of Seokguram was maintained during the first repair work, the architectural form based on the dry method was changed to the form based on the wet method. The Korean government's repair work was a tragedy for the 'Seokguram conservation project' that the people who led the conservation process misunderstood the architectural nature of Seokguram.

New Retear Pattern after Rotator Cuff Repair at Previous Intact Portion of Rotator Cuff

  • Choi, Chang-Hyuck;Kim, Sung-Guk;Nam, Jun-Ho
    • Clinics in Shoulder and Elbow
    • /
    • 제19권4호
    • /
    • pp.237-240
    • /
    • 2016
  • Retear patterns after arthroscopic rotator cuff repair are classified into two patterns according to retear location. Type 1 is when the retear pattern occurs directly on the tendon at the bone repair site using the suture anchor repair method. Type 2 is when the retear pattern occurs at the musculocutaneous junction with a healed footprint in patients who undergo the suture bridge method. Here, the authors report another retear pattern, which was identified as a type 2 retear on magnetic resonance imaging in patients who had undergone arthroscopic rotator cuff repair by the suture-bridge technique. This pattern was different from the type 2 retear and occurred at the portion of the cuff away from the healed rotator cuff under the view of the arthroscope.

신판교체 보수 용접부의 피로강도에 관한 실험적 연구 (An Experimental Study on the Fatigue Strength of Repair Welded Joints of Old Steel Bridge)

  • 박현찬;이진형;김재환;장갑철;장경호
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2006년도 춘계 학술대회 개요집
    • /
    • pp.94-96
    • /
    • 2006
  • Recently, steel structures have been increasing because of its brilliant features. In general, cracks and corrosion are produced due to the numerous environmental factors in steel structures. However, the validity of repair method for the damaged steel structures has not been fully verified because of its lack of safety and reliability after application. Moreover, repair method by welding inevitably involves cutting and welding processes and reliability for the safety during the processes has net been established yet. Therefore, this study carried out experiments on the fatigue strength of repair welded joints of old steel bridge to investigate the fatigue characteristics in the repair welded joints. Fatigue tests were conducted by 250kN capacity MIS with the frequency of 5Hz under amplitude loading. From the results, it is known that fatigue strength grade of the repair welded joints was satisfied with C grade which specification requires.

  • PDF

수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안 (Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost)

  • 송상훈;이석제;박성식
    • KIEAE Journal
    • /
    • 제16권4호
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구 (Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types)

  • 이강희;박근수;채창우
    • KIEAE Journal
    • /
    • 제12권5호
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.