• Title/Summary/Keyword: Repair Method

Search Result 1,624, Processing Time 0.033 seconds

clinical analysis of vascular trauma (혈관손상의 임상적 고찰)

  • 성숙환
    • Journal of Chest Surgery
    • /
    • v.19 no.2
    • /
    • pp.288-294
    • /
    • 1986
  • During the period from Mar. 1983 to Feb. 1986, 22 patients with vascular trauma were treated at Capital Armed General Hospital. 1] 11 patients had arterial injury alone, 6 patients had venous injury alone, and 5 patients had both arterial and venous injuries. 2] The mechanism of injury in these 22 patients was 7 penetrating non-gun shot wounds, 5 blast fragments injuries, 4 iatrogenic injuries, 4 blunt injuries, 2 gun shot wounds. 3] The method of 16 arterial repair was 5 autogenous saphenous vein graft, 8 synthetic vascular graft, 1 end to end anastomosis, 2 lateral suture. Midterm patency of 16 repairs was 100% within 1 months. 4] The method of 11 venous repair was 1 autogenous saphenous vein graft, 2 onlay vein patch, 2 ligation, 1 lateral suture. The thrombotic obstructions occurred in 4 repairs [36.4%], but they were resolved somewhat with heparinization. 5] Uncommon cases of false aneurysm of internal carotid artery and laceration of retrohepatic inferior vena cava were summarized.

  • PDF

Experimental Comparison for Static Performance of I-beam Concrete Slab (I-형강 합성바닥판의 정적 성능비교)

  • 박길용;박창규;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.947-952
    • /
    • 2002
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam concrete slab through static test.

  • PDF

Development of Analytical Reliability Evaluation Program in Distribution Systems (배전계통의 해석적 공급 신뢰도 평가 프로그램 개발)

  • Han, Seong-Ho;Rhee, Wook;Kim, Jae-Chul
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.9 no.5
    • /
    • pp.64-70
    • /
    • 1995
  • This paper presents a practical approach to evaluate the reliability indices of electric distribution systems. The use of reliability evaluation is placed with framework of distribution system planning and operation. In this paper, the reliability model is based on an analytical method, connecting component failure to load point outage in each section. Five cases are reported in the paper to study the effect of varying failure rates and repair times on real distribution systems. Simulations are preformed by the developed reliability evaluation program.

  • PDF

Management and Reduction of Backfill Settlement for Bridge Abutments (고속도로 교대 뒤채움부 침하관리 방안)

  • Choi, Young-Chul;Lim, Seong-Yoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1417-1424
    • /
    • 2010
  • To provide more safe road and better travelling service for Expressway customer, we minimize settlement of bridge backfill and properly repair the occurred settlement. So, we devide this study to two parts one is construction part and the other is management part, in construction part we remove settlement occuring elements and in management part we grasp proper repair time, and then we produce general settlement management program. In construction part, for the purpose of developing construction method of reducing settlement, we developed construction method models and they are composed of abutment back section alteration and backfill material alteration by literature reviews and site investigation of backfill settlement. And then, we carried out laboratory model test and full size field test of some developed models.

  • PDF

A Study on the Development of the Wheel Tracking Test and Evaluation Method on Blind Type of Waterproofing Layer (비노출 방수층의 윤하중 시험 및 평가방법 개발에 관한 실험적 연구)

  • Song Je-Young;Eom Deok-Jun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.67-72
    • /
    • 2006
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and condrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load.

Numerical studies of the effect of residual imperfection on the mechanical behavior of heat-corrected steel plates, and analysis of a further repair method

  • Chun, Pang-Jo;Inoue, Junya
    • Steel and Composite Structures
    • /
    • v.9 no.3
    • /
    • pp.209-221
    • /
    • 2009
  • Heating correction, through heating and flattening a structure with a pressing machine, is the in-situ method used to repair buckled steel structures. The primary purpose of this investigation is to develop an FEM model which can predict the mechanical response of heat-corrected plates accurately. Our model clarifies several unsolved problems. In previous research, the location of the imperfection was limited to the center of the specimen although the mechanical behavior is strongly affected by the location of the imperfection. Our research clarifies the relationship between the location of the imperfection and the mechanical behavior. In addition, we propose further reinforcement methods and validate their effectiveness. Our research concludes that the strength of a buckled specimen can be recovered by heating correction and the use of an adequate stiffener.

An Analysis of Defect Dispute about Inter-Layer Crack Repair Method on Apartment Houses (공동주택 층간 이음부 균열 보수공법에 대한 하자분쟁 분석)

  • Lee, Tae-Hyeong;Jeong, Yong-Ki;Choi, Byung-Ju;Kim, Ok-kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.146-147
    • /
    • 2017
  • Recently, as the living standards of residents in apartment houses continued to improve, the dispute of post management have also increased. one of the Issue, Concrete Cracks comprised high percentage of dispute. Especially, between criteria the cost of repairing defect and the judgement of defect isn't clear, they are a lot of dispute in this regard. Even though lots of the criteria about Inter-layer crack is existed by judging defects, In a court, they are judging their own criteria about Inter-layer crack. The purpose of this study is to compare and analyze Defect Judement Standard both MOLIT and Court, and to provide the Improvement for Defect Judgement and Repair Method of Inter-layer concrete crack.

  • PDF

Arthroscopic Footprint Reconstruction of Bursal-side Delaminated Rotator Cuff Tears using the Suture-bridge Technique

  • Kim, Kyung-Cheon;Rhee, Kwang-Jin;Shin, Hyun-Dae;Byun, Ki-Yong;Yang, Jae-Hoon;Kim, Dong-Kyu;Kim, Pil-Sung
    • The Academic Congress of Korean Shoulder and Elbow Society
    • /
    • 2009.03a
    • /
    • pp.210-210
    • /
    • 2009
  • For a bursal-side retracted laminated rotator cuff tear, simple repair of the retracted bursal-side rotator cuff might be insufficient because the repaired tendon could remain as an intratendinous tear of the rotator cuff. We present a repair method for intratendinous rotator cuff tears using the suture-bridge technique. We believe that this method helps to preserve the remnant rotator cuff tendon without tissue damage and restores the normal rotator cuff footprint in bursal-side delaminated rotator cuff tears.

  • PDF

A Study on the Blind Type of Waterproofing Layer of Wheel Tracking of Test Method and Valuation on Working of Live Load (이동하중이 작용하는 비노출 방수층의 윤하중 시험방법 및 평가에 관한 연구)

  • Eom Deok-Jun;Seon Yun-Suk;Kwon Si-Won;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.1-5
    • /
    • 2005
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and concrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load

  • PDF

Evaluation of Piping Integrity in Thinned Main Feedwater Pipes

  • Park, Young-Hwan;Kang, Suk-Chull
    • Nuclear Engineering and Technology
    • /
    • v.32 no.1
    • /
    • pp.67-76
    • /
    • 2000
  • Significant wall thinning due to flow accelerated corrosion(FAC)was recently reported in main feedwater pipes in 3 Korean pressurized water reactor(PWR) plants. The main feedwater pipes in one plant were repaired using overlay weld method at the outside of pipe, while those in 2 other plants were replaced with new pipes. In this study, the effect of the wall thinning in the main feedwater pipes on piping integrity was evaluated using finite element method. Especially, the effects of both the overlay weld repair and the stress concentration in notch-type thinned area on the piping integrity were investigated. The results are as follows : (1) The piping load carrying capacity may significantly decrease due to FAC. In special, the load carrying capacity of the main feedwater pipe was reduced by about 40% during about 140 months operation in Korean PWR plants. (2) By performing overlay weld repair at the outside of pipe, the piping load carrying capacity can increase and the stress concentration level in the thinned area can be reduced.

  • PDF