• Title/Summary/Keyword: Removal Time of Form

Search Result 141, Processing Time 0.029 seconds

Immobilization of Earthworm Casts to Treat the Waste Sludge Produced from Pulp & Paper Plants as a Biocarrier (제지공정 페슬러지처리용 지렁이 분변토의 담체화 기술)

  • Cho, Wook Sang;Lee, Eun Young;Cho, Nam Hyeuk
    • Clean Technology
    • /
    • v.8 no.3
    • /
    • pp.167-172
    • /
    • 2002
  • The adaptability of earthworm casts produced form the waste sludge of pulp and paper plants for a biocarrier used in the advanced wastewater treatment was investigated. Removal efficiencies of nutrients in the activated sludge technology without carrier were compared with those treated with carrier made of casts under the different conditions such as the composition of the input and kinds of carrier. When the waste water was treated in the activated sludge technology without carriers, removal efficiencies of T-P and T-N were average values of 31% and 52%, respectively. On the contrary, pellet type carrier and pack type carrier increased the removal efficiencies of T-P and T-N by 1.3~1.4 and 1.9~2.0 times, respectively. At the same time, the high removal of T-P and T-N were observed irrespective of the types of carrier in which many kinds of microorganisms were grown. The difference in the removal efficiencies of BOD and COD between the treatment with and without carrier was negligible. According to this research, the carrier made of casts was thought to be highly applicable in the advanced wastewater treatment.

  • PDF

Immediate Autogenous Fresh Demineralized Tooth (Auto-FDT) Graft for Alveolar Bone Reconstruction (즉시 탈회 치아이식재를 사용한 치조골 재건술)

  • Lee, Eun-Young
    • The Journal of the Korean dental association
    • /
    • v.54 no.5
    • /
    • pp.348-355
    • /
    • 2016
  • Ideal autogenous or allogenic bone graft materials should provide 1) stabilization of blood clot, 2) scaffolds for cellular proliferation and differentiation, 3) release of osteogenic growth factors, 4) appropriate resorption profile for remodeling of new bone. Teeth, especially dentin, mostly contain hydroxyapatite and type I collagen which are similar to bone, and could be valuable graft material. Clinically teeth are used as calcined or demineralized forms. Demineralized form of dentin can be more effective as a graft material. But a conventional decalcification method takes time and long treatment time may give negative effects to various osteogenic proteins in dentin. Author used a new clinical method to prepare autogenous teeth, which could be grafted into the removal defects immediately after extraction using vacuum ultrasonic system. The process could be finished within two hours regardless of the form (powder, chip or block). Teeth were processed to graft materials in block, chip, or powder types immediately after extraction. It took 120 minutes to prepare block types and 40 minutes to prepare powder. Clinical cases did not show any adverse response and the healing was favorable. Rapid preparation of autogenous teeth with the vacuum ultrasonic system could make the immediate one-day extraction and graft possible.

  • PDF

Obtaining the zwitterionic form of L-lysine from L-lysine monohydrochloride by electrodialysis

  • Aghajanyan, A.E.;Tsaturyan, A.O.;Hambardzumyan, A.A.;Saghyan, A.S.
    • Membrane and Water Treatment
    • /
    • v.4 no.1
    • /
    • pp.1-9
    • /
    • 2013
  • The process of electromembrane transformation of L-lysine monohydrochlorides into their zwitterionic form in four- and two-chamber electrodialysis apparatus was investigated. The process of transformation at various concentrations of lysine monohydrochloride (0.1-0.6 mol.L-1) was studied and it was established that at the optimum density of current optimal concentrations of lysine hydrochloride during electrodyalisis was in the range of 0.2-0.4 mol.L-1. It was determined that the process of total transformation was accomplished when pH of the lysine solution achieved 10. Changes of concentrations of $Cl^-$ ions and lysine diffused into the neighboring chamber were determined depending on the time. The method developed by us allows adjusting the removal coefficient of $Cl^-$ ions during transformation to a maximal value, the losses of lysine diffused into the next chamber after its return to the technological cycle being less than 1.0 %. The specific energy consumption during the process of transformation in two- and four-chamber electrodialyzers was 0.19 and 0.205 A.h.kg-1 and the current efficiency was 75.9 and 73.1 %, correspondingly. Study of the process of electromembrane transformation allowed obtaining zwitterionic form of L-lysine from L-lysine monohydrochloride with minimal reagent and energy consumption.

Strength Properties of Concrete According to Types of High Early Strength Cement and Curing Method (조강형 시멘트의 종류 및 양생방법에 따른 콘크리트의 강도특성)

  • Chang, Chun-Ho;Lee, Wang-Sup;Jung, Yong-Wook;Chung, Youn-In
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.1
    • /
    • pp.76-84
    • /
    • 2017
  • This study selected a method which uses high early strength cement as a way to reduce the curing time and curing energy source of concrete secondary products and reviewed the improvement in the initial strength of concrete secondary products setting the target strength of the concrete capable of removing the form to 15MPa and the curing time to 6 hours. As a result of the test, the only specimen which achieved the form removal strength of 15 MPa only through atmospheric curing within the target curing time of 6hours was ACC-100, and the specimens of TRC-100 and TRC-50 satisfied the values of 6 hours and 15MPa through steam curing. However, we could see that it was difficult to secure workability in the case of the specimen of ACC-100 due to its high rapid setting property and a retarder such as anhydrous citric acid was required to be used to improve the workability. When we look into the pattern following changes in the water to binder ratio, while, in the case of stream curing, OPC-100, TRC-100, and TRC-50 were all found to satisfy achievement of the form removal strength within 6hours as the water to binder ratio decreased, in the case of atmospheric curing, TRC-100, and TRC-50 achieved 15MPa within 12hours.

Enhanced Electrokinetic remediation of low permeability soil contaminated with phenanthrene (Phenanthrene으로 오염된 저투수성 지반의 향상된 Electrokinetic 정화 처리)

  • 김강호;한상재;김수삼
    • Journal of Soil and Groundwater Environment
    • /
    • v.7 no.4
    • /
    • pp.3-9
    • /
    • 2002
  • In this study, electrokinetic remediation tests were performed with spiked fine-grained soil by phenanthrene which is representative hydrophobic organic contaminant of petroleum hydrocarbon. And also, the enhanced method was used with surfactant concentration variation and elapsed time to achieve more higher removal efficiency than conventional electrokinetic treatment. In conventional electrokinetic treatment, most phenanthrene was not transported. But, in the enhanced method used by the surfactant, phenanthrene moved form anode to cathode region and accumulated in cathode region. Also, the transportation rate of phenanthrene was increased with surfactant concentration increasement and elapsed time.

Early Strength Development of Concrete Cured with Microwave Heating Form (마이크로웨이브 발열거푸집을 적용한 콘크리트의 조기강도 발현특성)

  • Koh, Tae Hoon;Hwang, Seon Keun;Moon, Do Young;Yoo, Jung Hoon;Song, Jin Woo;Ko, Ji Soo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.5
    • /
    • pp.365-372
    • /
    • 2014
  • Technologies for rapid concrete curing using elevated temperature are important for saving cost and time when constricting concrete structures. Recently, a microwave heating form was developed. In this study the early strength of concrete cured by the developed form was experimentally investigated. Large scale mock up tests were conducted six times, and the results were analyzed based on the maturity theory. Logarithmic correlation curves were generated based on the measured strength and estimated maturity. It was confirmed that the strength development of the concrete cured by microwave heating form can be estimated by the equivalent age theory usually applied to steam-curing technology. By using the microwave heating form, one day at most is enough to get the required strength for the safe removal of forms, even in cold weather.

Experimental determination of design parameters for filtration trench using phosphorus removal granular materials (인 제거 입상소재를 적용한 여과수로 설계인자의 실험적 결정)

  • Jang, Yeoju;Lim, Hyunman;Jung, Jinhong;Ahn, Kwangho;Chang, Hyangyoun;Park, Nari;Kim, Weonjae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.1
    • /
    • pp.9-16
    • /
    • 2019
  • The algal blooms in stagnant streams and lakes have caused many problems. Excessive algae leads to disturbance of ecosystem and overload of water treatment processes. Therefore, phosphorus(P), source of algal blooms, should be controlled. In this study, a filtration trench has been developed to convert dissolved phosphorus into hydroxyapatite(HAP) so that it could be crystallized on the surface of 'phosphorus removal granular material'; and residual particulate phosphorus could be removed by additional precipitation and filtration. The front and rear parts of filtration trench consisted of 'phosphorus removal granular material contact bed' and 'limestone filtration bed', respectively. As a result of the column test using phosphorus removal granular material and limestone serially, $PO_4-P$ was removed more than 90% when EBCT(empty bed contact time) of the contact bed was over 20 minutes; and T-P represented 60% of removal efficiency when total EBCT was over 1.5 hours. The results of column tests to figure out the sedimentation characteristics showed that more than 90% of particulate phosphorus could be removed within 24 hours. It was necessary to optimize the filtration part in order to increase removal efficiency of T-P additionally. Also, it was confirmed through the simulation of Visual MINTEQ that most of particulate phosphorus in the column tests is the form of HAP. Based on the results of the study, it could be suggested that the design parameters are over 0.5 hour of EBCT for phosphorus removal granular material contact bed and over 1.5 hours of EBCT for limestone filtration bed.

Compressive Strength Development Properties of Concrete using Sodium based Accelerating Admixtures (나트륨계 기반 조강형 혼화제를 사용한 콘크리트의 압축강도발현 특성)

  • Song, Yeong-Chan;Lee, Tae-Gyu;Kim, Yong-Ro;Seo, Chi-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.259-266
    • /
    • 2018
  • In recent years, the early strength of concrete is important in order to shorten the time of form removal at the construction site. The purpose of this study is to analyze the moment of form removal as investigating the amount of cement contents and the physical properties and strength of the concrete according to types of admixture in the curing temperature of $10^{\circ}C$ for concrete of 21 to 27 MPa. As a result, it was found that compressive strength of concrete could not be secured 5 MPa by 36 hours even if the amount of cement contents were increased to $360kg/m^3$ with plain admixture. Also, it was confirmed that the strength improvement rate was excellent when using the accelerating agent with polycarboxylic acid type, and the moment of compressive strength of 5 MPa was estimated at 30 hours.

A Study on DC Offset Removal using Low-Pass Filter in AT Feeder System for Electric Railway (전기철도 AT급전계통에 Low-Pass Filter를 이용한 직류옵셋 제거에 관한 연구)

  • Lee, Hwan;Jung, No-Geon;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.1108-1114
    • /
    • 2016
  • The cause of failure in the AT feeding system is divided into grounding, short-circuit of feeding circuit and internal faults of the railway substation. Since the fault current is very high, real-time current is detected and the failure must be immediately removed. In this paper, a new DC offset elimination filter that can remove component to decrease in the form of exponential function using low-pass filter was proposed in order to extract the fundamental wave from distorted fault current. In order to confirm the performance of the proposed filter method, AT feeder system was modelled by simulation tool and simulations were performed under various conditions such as fault location, fault resistance and fault voltage phase angle in case of trolley-rail short-circuit fault. When applying the proposed DC-offset removal method, it can be seen that the phase delay and gain error did not appear.

Development of an Odor Abatement System for Swine Manure Treatment Facilities

  • Lee, S.H.;Yun, N.K.;Kim, G.W.;Yum, S.H.;Cho, Y.H.
    • Journal of Animal Environmental Science
    • /
    • v.14 no.1
    • /
    • pp.1-8
    • /
    • 2008
  • This study was conducted to solve the problem of public grievance owing to odor of a pig farm. Odor emissions from pig production systems mainly originate from liquid manure storage and solid manure fermentation. The low-cost odor abatement system (OAS) for application at liquid manure storage tank and solid manure fermentation facilities was developed in this study. The OAS adapted odor removing principles of a biofilter and biotrickling filter. The OAS is very simplified in structure. The appearance of the OAS had a form of cylindrical or cubical shape. The system performance was monitored for about one year after stabilization. A 7 seconds empty bed contact time for the OAS was adapted to achieve the odor reduction levels. The commercial type of OAS was constructed with media comprised of wood chips. Moisture content always remained above 50% wet basis. Average ammonia removal efficiency for the developed design was 89% at the liquid manure storage tank. Also, the removal efficiency at a solid manure fermentation facility was 86% on ammonia.

  • PDF