Kim, E.J.;Kang, S.Y.;Bark, C.S.;Lim, Y.C.;Kim, G.W.
Proceedings of the KIEE Conference
/
2001.10a
/
pp.245-248
/
2001
Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet. appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.
Kim, E.J.;Kang, S.Y.;Bark, C.S.;Lim, Y.C.;Kim, G.W.
Proceedings of the KIEE Conference
/
2001.10a
/
pp.157-160
/
2001
Recently, with the advancement of internet network the system has been needed to be controllable and observable through internet at industrial workplace. In this study, we developed the digital timer which has a communication function to control and observe many kinds of devices by combining relay and timer used for each type of control panel to realize control solution based on internet to be easily applicable at workplace with low cost and adding 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet, appling the developed digital timer to parallel sequence control of motor. As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi-connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.
Lee Y.G.;Kang S.Y.;Kim E.J.;Bark C.S.;Lim Y.C.;Kim G.H.
Proceedings of the KIPE Conference
/
2001.12a
/
pp.83-88
/
2001
This paper deals with the economical equipment control which is used by internet network system at the industrial workplace. If the control devices can be accessed by internet, we can have the developed possibility of work conditions. In this paper, we presented the advanced digital timer which has a communication function to control and observe panel to realize control solution based on internet to be easily applicable at workplace with low cost. and we used 485 serial communication module to have parallel expansibility and safety. And, this system was experimented and designed for easy system management and status check from remote station through internet As the result of experiment, the circuit configuration would be more simplified than the existing, and it is expected that multi connection control and monitoring can be simply implemented with low cost equipment at industrial workplace.
International Journal of Computer Science & Network Security
/
v.22
no.12
/
pp.71-78
/
2022
Electronic measuring devices have an important role in agricultural projects and in various fields. Electronic measuring devices play a vital role in controlling and saving soil information. They are designed to measure the temperature, acidity and moisture of the soil. In this paper, a new methodology to manage irrigation and soil fertility using an electronic system is proposed. This is designed to operate the electronic irrigation and adds inorganic fertilizers automatically. This paper also explains the concept of remote management and control of agricultural projects using electronic soil measurement devices. The proposed methodology is aimed at managing the electronic irrigation process, reading the moisture percentage, elements of soil and controlling the addition of inorganic fertilizers. The system also helps in sending alert messages to the user when an error occurs in measuring the percentage of soil moisture specified for crop and a warning message when change happens to the fertility of soil as many workers find difficulty in daily checking of soil and operating agricultural machines such as irrigation machine and soil fertilizing machine, especially in large projects.
Journal of international Conference on Electrical Machines and Systems
/
v.1
no.2
/
pp.111-115
/
2012
In this paper, a solar energy powered bicycle linked to a wireless sensor network (WSN) which monitors the transfer of solar energy to an electrical energy storage unit and an analysis of its effectiveness is proposed. In order to achieve this goal, a solar-powered bicycle with an attached ZigBee and a far-end wireless network supervisory system is setup. Experimental results prove that our prototype, solar energy powered bicycle, can achieve enough solar energy for charging a two lead-acid battery pack. As a result, the user, through use of a wireless network in the parking period can be kept aware of the data on the amount of immediate solar radiation, the degree of illumination, the ambient temperature, and electrical energy storage capacity information of the bicycle through an internet interface.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.188-191
/
2002
This paper concerns 3-D graphical modeling and simulation techniques for design and control of automated equipment for construction and facility maintenance. A case study on the use of 3-D graphics techniques for developing a power plant maintenance robot is presented. By simulating equipment operation within the 3-D geometry models of the work environment the environment design was improved. The 3-D graphical models of the equipment and the work environment were further utilized for the control of the robot from a remote distance. By presenting the real-time updated equipment configuration and the work environment to the operator, the graphical model-based equipment control system helped the operator overcome the problems associated with spatial perception. The collision between the robot and the plant structures was also avoided based the real-time analysis of the dynamically updated graphical models.
Proceedings of the Korean Society of Precision Engineering Conference
/
2003.06a
/
pp.172-175
/
2003
The enterprise find a solution to the problems such as a reduction of manufacturing period, accurate analysis for customer demand, improvement for customer service and rise of manufacture accomplishment. Internet is a good solution to such problems. Internet offers WWW(World Wide Web), remote control, file transfer and e-mail service. Among the services, WWW takes large portion because of convenient GUI, easy information search and unlimited information registration. Remote Monitoring Server(RMS) system that uses network service is constructed for chip mounter. Hardware base consists of RMS, chip mounter and C/S(Customer Service) server. Software includes DBMS and various modules in server home page. This provide product number, bad product number, trouble code, content and countermeasure in real-time information module, user information in setup module, detailed error information in fault diagnosis module, fault history in fault history module and customer information in customer service management module.
Along with the development of communication technology, DTV is gradually evolving into media that provide diverse services and information. This study is related with remote controls that control DTV interfaces and assessed the usability of remote pointing device. To this end, pointing devices using three different interaction methods that have been attempted recently by the industry were selected to conduct empirical experiments. The usability assessment was conducted centering on the existing directional task on straight tracks presented in ISO 9241-Part 9 and the steering tunnel task on curved tracks proposed in this study. The measurement variables included movement time, accuracy, throughput, subjective satisfaction and user behaviors. Based on the results of the assessment, in the case of movements on straight tracks, the GyroPoint method showed better implementing time but lower accuracy compared to the Hall Mouse and OFN methods while in the case of assessment on curved tracks, all of the GyroPoint method, Hall Mouse and OFN methods showed excellent results on both implementing time and accuracy. Besides, differences in efficiency and subjective satisfaction were shown among individual pointing devices. Based on these results, it is considered that individual pointing methods have different advantageous and disadvantageous characteristics. In this study, the usability of remote control pointing methods was assessed and diagnosed reflecting environments where DTVs are used through assessments considering the aspect of straight tracks along with curved tracks. Among others, this study is considered to be meaningful in that it provides assessment criteria and basic data for the development of remote controls suitable for the evolving DTV environments.
Journal of Korean Society of Industrial and Systems Engineering
/
v.37
no.1
/
pp.33-40
/
2014
Air compressor is an important facility with electric power in the industry. However, because of the noise and vibration of air compressor and is installed outside the building management difficulty. In this study, MCP (Micro Control Processor) to remote monitoring of the air compressor via the compressed air through improved quality and allows stable maintenance were designed. So, increase the productivity improvement of energy-saving effect can be obtained. Remote real-time information stored on your PC to manage air compressor equipment was higher reliability. Monitoring system is developed in this study was applied to embedded systems. It is easy to install air compressor, and low maintenance costs was to raise the economic impact.
The Journal of the Korea institute of electronic communication sciences
/
v.7
no.3
/
pp.537-543
/
2012
Smart home System is shirt-sleeve, the automatic control systems, computer network system and network communication technology in the integration of network intelligent home control system. Intelligent household will let users have a more convenient means to management of domestic equipment, for example, through the house, wireless remote control, touch screen phone and Internet or speech recognition control household devices, more can perform scene operation, make more equipment form linkage. In this paper, we propose the intelligent household various kinds of equipment within each other can communication, do not need to user command according to different state interactive operation, thus to bring the greatest degree of user efficient and convenient, comfortable and safe.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.