• Title/Summary/Keyword: Remodeling Cost

Search Result 125, Processing Time 0.027 seconds

A Study on the Feasibility of the Apartment Remodeling in the Provinces -Focusing on S Apartment in Daejeon City- (지방도시 공동주택의 리모델링 타당성 연구 -대전광역시 S 아파트를 중심으로-)

  • 신교영;이정수;송용호
    • Journal of the Korean housing association
    • /
    • v.14 no.5
    • /
    • pp.129-140
    • /
    • 2003
  • The purpose of this study is to provide the feasibility of apartment remodeling types in DaeJeon City. This study was conducted by survey for the residents' perceptions of the apartment remodeling. In addition, this study estimated the cost according to remodeling types by comparing it with that other apartments in DaeJeon City. By doing so, this study evaluated the feasibility of remodeling. The results of this study are as follows: 1. Not only the level of the residents' perception but also the intention of apartment remodeling was high. 2. The cost of remodeling was similar to that of residents had answered at questionaire. Thus, the remodeling cost proven to be very reasonable. 3. The cost of horizontally expanding remodeling type was cheaper than that of moving within the same apartment complex or into the new apartment. The cost of others (duplex, expansion or reduction of household) are cheaper that of moving. But one of the difficulties in carrying out these types lies in the fact that the remodeling should be performed in the apartment complex or building. Accordingly, this study proposes that horizontally expanding remodeling type is more feasible in DaeJeon City.

Investigation into the Effectiveness on Customized Remodeling - Focusing on apartment houses completed during remodeling - (맞춤형 리모델링에 대한 실효성 검증 연구 - 리모델링을 추진중, 완공한 공동주택을 중심으로 -)

  • Yoon, Hyang-Seung;Kim, Gi-Soo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.7
    • /
    • pp.3-12
    • /
    • 2018
  • The present remodeling makes almost no difference from rebuilding as all the building materials are removed remaining frame structure only. And, in case of vertical extension of building, higher construction cost and safety problem occur. The Ministry of Land, Transport and Maritime Affairs, therefore, recommends customized remodeling that can be made in light of the resident' needs such as parking lot, elevator, bathroom, and room for the alternative of remodeling of vertical extension of building. The purpose of this study is to present real data that can be referred to the constructor's decision making before starting the remodeling, by investigating and analyzing the weight and importance between evaluation factors for customized remodeling at the completed time of remodeling. Accordingly, the factors were divided into environmental factor, social factor, and economical factor, and the survey was performed for the residents living in remodeling houses. In addition, for the professionals, AHP (Analytic Hierarchy Process) has been carried out for the priority in the customized remodeling. For environmental factor, the level of importance made difference from that before remodeling, except parking level. For social factor, every item, including psychological satisfaction and community satisfaction, made difference. For economical factor, the recognition level of importance in rent made difference, except sale price of the factor for price satisfaction. In case of the factor for cost satisfaction, it was checked that construction cost and administration cost both could be considered important. As a result of AHP, the most importantly emphasized item was construction cost, and sale price, administration cost, residence structure, and parking lot were followed by priority in order. This study could contribute to reliably settle down customized remodeling by giving reasonable and substantial help from the analysis of the differences in the customized remodeling items before/after the remodeling.

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

A Study on Remodeling Period by Cost Analysis of Finished and Equipped Materials in Apartment Building (공동주택 내/외장재 및 설비재의 비용분석을 통한 리모델링시기 검토를 위한 연구)

  • Oh Jin-Soo;Kim Ki-Hyung;Lee Myung-Sik
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.5 s.52
    • /
    • pp.218-225
    • /
    • 2005
  • In this apartment market, many apartments are being reconstructed within even less than 20 years from their first construction. This entails many problems in environmental and economical facets, for which many researches are under way in several institutions and universities. International cases show that the international trend goes for remodeling of maintenance, management, and repairing rather than new building. The purpose of this study is to investigate the factors of cost evaluation for establishing the time period of apartment based on durability of material and equipment while considering the economic feasibility of apartment, when remodeling as a concept of sustainability regarding building is being vitalized. This study investigates the proper period of remodeling in consideration of weight accruing to the LC(Life Cycle) and cost based on the standardized durability. The weight of cost, period establishment analysis, and LC according durability varies the data values of remodeling periods. The physical durability and cost from this data enable the investigation into not only the repair period of individual materials of the apartment but also remodeling period.

The Comparison of Maintenance Cost and Residents′Consciousness of Remodeling by Rental Apartment Types (임대아파트 유형별 유지관리비와 거주자의 리모델링 의식비교)

  • 박민용;장승재
    • Journal of the Korean housing association
    • /
    • v.14 no.4
    • /
    • pp.69-76
    • /
    • 2003
  • Considering the present development situation of rental apartment since 1982, the supply of rental housing for low-income dwellers has contributed a amount of quantities, but has been deficient qualities in housing policy. To propose the device of remodeling for low-income dwellers in deteriorated apartment, this study investigated the characteristics of maintenance cost and the residents'consciousness of remodeling by rental apartment types. The results of this study were as follows; The annual maintenance cost of permanent rental apartment was 14,249 won/$\textrm{m}^2$$.$yr, that of fifty years period rental apartment was 13,372 won/$\textrm{m}^2$$.$yr. In the case of remodeling in deteriorated heating system, the principal decision factor of choice was showed “economics” as priority. Residents in rental apartment preferred remodeling to reconstruction, and unit heating system to central heating system.

A Study on the Economic Assessment Through Case Study of Remodeling (건축물 리모델링 사례 분석을 통한 경제성 평가에 관한 연구)

  • 김천학;양극영
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.2
    • /
    • pp.154-164
    • /
    • 2001
  • This research is aiming to specify the requirement of the investment such as intial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can be defer each other in their implementations. Second, though the remodeling of exist building to promote the functions has been applied, no suitable assessment tool has bee developed for deciding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific date base should be established to apply the suggested economic acessments in business enough ti forecast the future circumstances. More researches should be promoted on the area continuously as well as the integrated economic evaluation of remodeling on existing building.

  • PDF

The study on salt injury and carbonation of concrete (도심지 상업 건축물의 리모델링 조사.연구)

  • 김동훈;이해진;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.136-141
    • /
    • 2001
  • If we build new building after demolition of commercial building that is located in the downtown, it will be caused a social and environmental problem as wasting of resources and generating of waste. In this study, I investigated about remodel ins, this conclusion is given below. 1. Reconstruction cost is 2.1 times, and construction period is 1.4 times as much remodeling. So remodeling has an advantage. 2. For repairing and reinforcing timeworn building, we reinforced it as using carbon fiber sheet (girder, slab) and injecting method steel plate bonding Also, we tried to maintain efficiency of new building as using epoxy to protect concrete crack. 3. In the side of waste products and cost, remodeling has much more advantage than reconstruct. But demolition used construction period much. Because it had to be reused as repairing and reinforcing. And there was no difference between remodeling cost and reconstruct cost. If we develop research with enterprise.university.laboratory to exploit material and equipment and to train specialized engineer who will has a capacity to know construct repair and reinforce, it can be attribute to prevail remodeling in new construct market.

  • PDF

A Competitive Core Technology Proposal for a Remodeling Project (경쟁력 있는 리모델링 공사를 위한 요소기술 도출)

  • Han, Ju-Yeoun;Kim, Ki-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.785-789
    • /
    • 2008
  • As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.

  • PDF

The Analysis on the Types of Remodeling in Preference Group -Focused on the Internet Remodeling site- (리모델링 선호집단의 형태 분석 연구 -인터넷 리모델링 상담 사이트를 중심으로)

  • Park, Hyun-Ok;Lee, Jong-Suk
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.3 no.2
    • /
    • pp.1-7
    • /
    • 2003
  • Remodeling has improved through many interests of people and governmental positive support. Accordingly, this study precedes definition and typology of remodeling. As well, it analyzed the type of remodeling preference group who asked consulting on internet following items and researched a special feature of construction case. - Area, Age, Size and Type of Building, Prospective Cost, Constructing Period, Range of Remodeling- Then, remodeling will have a big effect and be needed lasting evaluation.

  • PDF