• Title/Summary/Keyword: Reinforcement Plan

Search Result 213, Processing Time 0.031 seconds

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Generation of ship's passage plan based on deep reinforcement learning (심층 강화학습 기반의 선박 항로계획 수립)

  • Hyeong-Tak Lee;Hyun Yang;Ik-Soon Cho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.11a
    • /
    • pp.230-231
    • /
    • 2023
  • This study proposes a deep reinforcement learning-based algorithm to automatically generate a ship's passage plan. First, Busan Port and Gwangyang Port were selected as target areas, and a container ship with a draft of 16m was designated as the target vessel. The experimental results showed that the ship's passage plan generated using deep reinforcement learning was more efficient than the Q-learning-based algorithm used in previous research. This algorithm presents a method to generate a ship's passage plan automatically and can contribute to improving maritime safety and efficiency.

  • PDF

Optimal Seismic Reinforcement Design of Adjacent Asymmetric-Stiffness Structures with Viscous Dampers (점성 감쇠기를 이용한 인접 비대칭 강성 구조물의 내진보강 최적설계)

  • Eun Hee, Sung
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.60-70
    • /
    • 2022
  • This paper proposes an optimal design method of a seismic reinforcement system for the seismic performance of adjacent asymmetric-stiffness structures with viscous dampers. The first method considers plan asymmetry for efficient seismic reinforcement, and evaluates the seismic performance of optimal design applied to two cases of modeling: adjacent stiffness-asymmetric structures and adjacent stiffness-symmetric structures. The second method considers the response of asymmetric structures to derive the optimal objective function, and evaluates seismic efficiency of the objective function applied to two cases of responses: horizontal displacement and torsion. Numerical analyses are conducted on 7- and 10-story structures with a uni-asymmetric-stiffness plan using six cases of historic earthquakes, normalized to 0.4g. The results indicate that the seismic performance is excellent as modeled by adjacent asymmetric-stiffness structures and how much horizontal displacement is applied as the objective function.

A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box (기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례)

  • Lee, Jung-Hee;Noh, Won-Seok;Jeong, Soon-Ig;Kim, Wan-Jong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

A Study on the Short-Term Plan of Structural Reinforcing and the Temporary Housing Supply Strategy through the Analysis of the Status of North Korean Standard Housing

  • Kim, Seong Eun;Kim, Seung Hun;Lee, Yong Taeg
    • Architectural research
    • /
    • v.20 no.3
    • /
    • pp.83-92
    • /
    • 2018
  • Recently, there has been inter-Korean exchanges are active, in company with an assertive international activity with North Korea and inter-Korean Summits. Thus, there is a growing possibility of Korean reunification. However, when the unification situation occurs, population inflow by North Korean residents will be expected, and it will be necessary to prepare a housing supply strategy. In addition, even if North Koreans are prevented from entering, a plan is necessary to ensure structural safety since most buildings in North Korea are aging and a recent natural disaster occurs frequently. In this research, we will try to present a temporary housing supply strategy and a short-term structural reinforcement plan based on analysis of the standard housing conditions in North Korea. In this research, we represent the analysis result of the existing construction level, supply status and structural performance of North Korea. When we consider the reinforcement period and social costs, a short-term reinforcement plan is recommended rather than the full reinforcement of the aged housing in North Korea. Furthermore, we examine the ways to secure the residential safety of North Koreans through a case study of domestic and overseas temporary residential facilities, until the permanent residential facilities were supplied. According to the analysis, the tent houses were used as a form of relief housing in overseas frequently. However, the tent house is difficult to apply for domestic country with clear seasons due to insulation and heating problems. Therefore, it is appropriate to develop a residential supply strategy as focusing on the temporary housing facilities in assembled or container from, in preparation for the future population inflow.

A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation (내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구)

  • Kim, Jang-Ook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

Plan of Construction Management for Reinforcement Method of Slope (사면보강 공사시 관리 방안)

  • 박종호;정희석;이재덕;홍익표
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.44-51
    • /
    • 2002
  • The construction road and addition work are increasing now. Therefore, slope stability is important in construction slope on the fault and fractured zone. Rock bolt method, soil nailing method and anchor method are applied to reinforcement method of slope. This paper is the study for construction management on reinforcement method of slope.

  • PDF

Shaking Table Test and Analysis of Reinforced Concrete Frame with Steel Shear Wall with Circular Opening and Slit Damper

  • Shin, Hye-Min;Lee, Hee-Du;Shin, Kyung-Jae
    • International journal of steel structures
    • /
    • v.18 no.4
    • /
    • pp.1420-1430
    • /
    • 2018
  • Earthquakes of 5.8 and 5.4 Richter scale recently occurred one after another in Korea, changing the Korean peninsula from an earthquake safe zone but 'earthquake danger zone'. Therefore, seismic reinforcements must expand to include structures with low seismic resistance in order to prepare for earthquakes on a larger scale in the future. This study investigated the performances of various seismic reinforcement systems such as X-braced steel rod reinforcement, steel shear wall with circular opening reinforcement, and slit damper reinforcement using shaking table test and computational analyses of seismic data in order to establish a proper seismic reinforcement plan. These three seismic reinforcement systems could increase the stiffness and strength of existing structures and reduce maximum drift ratio in the event of an earthquake.

Evaluation of Structural Performance of RC T-shaped Walls with Different ratios of axial load and vertical reinforcement (압축력비와 수직철근비에 따른 RC T형 벽체의 구조성능 평가에 관한 해석적 연구)

  • 하상수;최창식;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.403-408
    • /
    • 2003
  • The objective of this study is to understand the variables affected the confinement for the transverse reinforcement of the reinforced concrete structural walls with the T-shaped cross section subjected to cyclic lateral loads. The structural performance of T-shaped walls was advanced by the transverse reinforcement which restrained the concrete subjected to compressive stress. If the arrangement of transverse reinforcement was not suitable for the confinement, T-shaped walls happened the brittle failure by web crushing or bucking of vertical reinforcement at the compression zone. It is necessary to confine transverse reinforcement in order to prevent the these failure. But the location of neutral axis and the magnitude of ultimate strain vary according to the section shape, a ratio of axial load, a ratio of wall cross sectional area to the floor-plan area, an aspect ratio and the reinforcement ratio. Therefore, the objective of this research is to grasp the location of neutral axis and the range which needs for the confinement of transverse reinforcement through the results of the sectional analysis which varies the ratio of axial load and the ratio of vertical reinforcement.

  • PDF

A Study on the Seismic Reinforcement of a Low-Rise Building Using Sinusoidal Corrugated Web Members (사인파형 웨브주름 보강재를 이용한 저층건물의 내진보강에 관한 연구)

  • Jung, Dong Jo;Kim, Jin
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.13-20
    • /
    • 2022
  • In this study, a general low-rise building was selected to compare the new shear wall reinforcement method, which is a general method among the existing reinforcement methods, and the reinforcement method using sinusoidal corrugated web reinforcement. And it was confirmed that the following effects can be expected. Sinusoidal corrugated web members can be carried out in a short period of time as it does not require the removal of the masonry filling wall, the reinforcement of reinforcing bars, and the curing period of the concrete. It is effective in preventing damage that may occur when masonry filling wall is overturned in the out-of-plane direction, and the burden of the foundation is also reduced, and thus the construction period and cost required for reinforcement can greatly be reduced. By adjusting the number of sinusoidal corrugated web member, details of joints, and reinforcement positions, the flow of load can be induced to have an advantageous effect on the building. It can be considered as the most suitable reinforcement plan in terms of life safety. Unlike the shear wall that fills between the columns, the sinusoidal corrugated web members, which has a width of 1.5m, can install openings between two columns depending on the purpose of use, and can be expected to have a great effect in terms of usability due to its free installation location. As mentioned above, the seismic reinforcement using a sinusoidal corrugated web members, can expect great effect compared to conventional reinforcement methods in terms of usability, economic feasibility, and stability.