• Title/Summary/Keyword: Reduces load

Search Result 608, Processing Time 0.026 seconds

Development and Effectiveness Evaluation of Acupressure Bed with Variable Type Bogie (변동형 대차 구동방식의 지압 침대 개발 및 유효성 평가)

  • Heo, Sung-Phil;Park, Se-Jin;Ahn, Do-Hyun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.25 no.6
    • /
    • pp.47-54
    • /
    • 2020
  • The acupressure is a treatment that applies pressure to certain parts of the body and has been mainly used for pain relief in the field of oriental medicine. However, the treatment effect is often different depending on the practitioner's ability, experience, and physical strength, so standardized acupressure is needed. In this regard, the equipment is being released, but this is mainly a rolling massage method, which reduces energy concentration and poses a risk of injury. Therefore, in this study, a device that provides vertical acupressure based on variable bogie (wheel truck) was implemented. As a result of experimenting with load and body pressure distribution and desirability to validate the device's bearing pressure, the acupressure rod held up to 150kg, the body pressure ratio was measured lower than the body pressure ratio of the comparison item in section 0%

Study of Structural Stability and Seismic Performances of 4-Way Sway Prevention Brace (4방향흔들림방지버팀대의 구조 안정성 및 내진 성능 연구)

  • O, Soo Un;Lee, Hang Jun;Choa, Sung Hoon
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.3
    • /
    • pp.646-659
    • /
    • 2022
  • Purpose: In this study, we developed a 4-way sway prevention brace that efficiently reduces the installation area and has excellent stability and seismic performance compared to the conventionl sway prevention brace used in existing firefighting facilities. The performance and reliability of the developed 4-way way prevention brace were analyzed by the tensile, compression tests and seismic tests. Method: As the static test, 4-way sway prevention braces were installed on the horizontal and vertical pipes to perform the tensile and compression tests based on the KFI certification standard and the maximum movement was measured at the rated load. As a dynamic test, 4-way sway prevention braces were installed in the pipes filled with water, and the test response spectrum to the input excitation wave were measured through the acceleration sensors. After the seismic tests, separation, failure, and local deformation of the pipes, and 4-way sway prevention braces were not observed. Result: The results of the tensile and compression tests indicated that the maximum movement of the pipe during tension and compression was 50% to 70% or less compared to the certification values, indicating that the performances of the 4-way sway prevention braces were very excellent. The results of the the seismic tests indicated that the test response spectrum of the 4-way sway prevention braces is within the required response spectrum. Conclusion: In this study, it was found that the 4-way sway prevention braces satisfied the KFI certification standard and were superior compared to the existing sway prevention brace in terms of the stability, cost, and installation area.

Suggestion on the Optimal Length of Long Tunnels Considering Traffic Safety Characteristics (교통안전 특성을 고려한 장대터널 적정길이 제시)

  • Kim, Joong-Hyo;Lee, Jeong-Hwan;Kwon, Sung Dae;Ha, Dong Ik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.203-211
    • /
    • 2014
  • Tunnel reduces travel time as and it is essential facilities for the eco-friendly road construction. In recent years, It has been accelerating the tunnel construction to provide a higher level of traffic service but a driver driving in the narrow and dark tunnel takes characteristically psychological anxiety and the restriction of the sight. Moreover, A driver passing through more than 1,000m long tunnel, as to pass inside the monotonous form of the tunnel for a long time can cause drowsiness and increase the driver load. This driver load can degrade road-holding of the inside of the long tunnel highly and pose a high risk of accidents. Accordingly, In this study is to present the proper length of the Tunnel, considering the characteristics of traffic accident. For this, this study is that the long tunnel that affects traffic safety traffic safety variables are selected and classified. Traffic safety variables are classified in detail as a variable of the traffic accident and velocity one, the applicable variables the number of the traffic accident, the ratio of the traffic accident, driving velocity, the individual vehicle velocity etc. Traffic safety variables are categorized as more than a pole length of the tunnel in order to examine its impact on correlation analysis. The results indicate significant results in traffic accidents in accordance with traffic accidents, traffic safety, selects the variable was Variable depending on the length of the tunnel traffic safety point of significantly increasing the possibility of an accident can be seen as a high point. And the point of the Distribution of selected variables in order to create a traffic safety was a significant increase in traffic safety variables was set at critical intervals. Before reaching the critical point and the corresponding length of the long tunnel was set at the proper length. In this study, the optimum length of the proposed long tunnel through the long tunnel that occur in the future to contribute to reducing traffic accidents would be able to be determined.

Design and Full Size Flexural Test of Spliced I-type Prestressed Concrete Bridge Girders Having Holes in the Web (분절형 복부 중공 프리스트레스트 콘크리트 교량 거더의 설계 및 실물크기 휨 실험 분석)

  • Han, Man Yop;Choi, Sokhwan;Jeon, Yong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.235-249
    • /
    • 2011
  • A new form of I-type PSC bridge girder, which has hole in the web, is proposed in this paper. Three different concepts were combined and implemented in the design. First of all, a girder was precast at a manufacturing plant as divided pieces and assembled at the construction site using post-tensioning method, and the construction period at the site will be reduced dramatically. In this way, the quality of concrete can be assured at the manufacturing factory and concrete curing can be well controlled, and the spliced girder segments can be moved to the construction site without a transportation problem. Secondly, a numerous number of holes was made in the web of the girder. This reduces the self-weight of the girder. But more important thing related to the holes is that about half of the total anchorages can be moved from the girder ends into individual holes. The magnitude of negative moment developed at girder ends will be reduced. Also, since the longitudinal compressive stresses are reduced at ends, thick end diaphragm is not necessary. Thirdly, Prestressing force was introduced into the member through multiple stages. This concept of multi-stage prestressing method overcomes the prestressing force limit restrained by the allowable stresses at each loading stage, and maximizes the magnitude of applicable prestressing force. It makes the girder longer and shallower. Two 50 meter long full scale girders were fabricated and tested. One of them was non-spliced, or monolithic girder, made as one piece from the beginning, and the other one was assembled using post-tensioning method from five pieces of segments. It was found from the result that monolithic and spliced girder show similar load-deflection relationships and crack patterns. Girders satisfied specific girder design specification in flexural strength, deflection, and live load deflection control limit. Both spliced and monolithic holed web post-tensioned girders can be used to achieve span lengths of more than 50m with the girder height of 2 m.

Finite element analysis of peri-implant bone stress influenced by cervical module configuration of endosseous implant (임플란트 경부형상이 주위골 응력에 미치는 영향에 관한 유한요소법적 분석)

  • Chung, Jae-Min;Jo, Kwang-Heon;Lee, Cheong-Hee;Yu, Won-Jae;Lee, Kyu-Bok
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.47 no.4
    • /
    • pp.394-405
    • /
    • 2009
  • Statement of problem: Crestal bone loss, a common problem associated with dental implant, has been attributed to excessive bone stresses. Design of implant's transgingival (TG) part may affect the crestal bone stresses. Purpose: To investigate if concavely designed geometry at a dental implant's TG part reduces peri-implant bone stresses. Material and methods: A total of five differently configured TG parts were compared. Base model was the ITI one piece implant (Straumann, Waldenburg, Switzerland) characterized by straight TG part. Other 4 experimental models, i.e. Model-1 to Model-4, were designed to have concave TG part. Finite element analyses were carried out using an axisymmetric assumption. A vertical load of 50 N or an oblique load of 50 N acting at $30^{\circ}$ with the implant's long axis was applied. For a systematic stress comparison, a total of 19 reference points were defined on nodal points around the implant. The peak crestal bone stress acting at the intersection of implant and crestal bone was estimated using regression analysis from the stress results obtained at 5 reference points defined along the mid plane of the crestal bone. Results: Base Model with straight configuration at the transgingival part created highest stresses on the crestal bone. Stress level was reduced when concavity was imposed. The greater the concavity and the closer the concavity to the crestal bone level, the less the crestal stresses. Conclusion: The transgingival part of dental implant affect the crestal bone stress. And that concavely designed one may be used to reduce bone stress.

Effects of Deletion of Supplementary Vitamins and Trace Minerals on Performance, Muscle Vitamin E and Fecal Trace Mineral Contents in Finishing Pigs (비육후기 사료에서 비타민-미량광물질 첨가제의 제거가 돼지의 성장 능력, 근육 내 비타민 E 및 분 중 미량광물질 함량에 미치는 영향)

  • Lee, S.C.;Lee, C.E.;Kim, K.I.
    • Journal of Animal Science and Technology
    • /
    • v.45 no.4
    • /
    • pp.543-550
    • /
    • 2003
  • Two experiments were conducted to determine the effects of deletion of vitamin and trace mineral premixes on growth, feed efficiency, backfat thickness, hemoglobin content, muscle vitamin E content, and fecal, serum and muscle trace mineral contents in finishing pigs raised under two different housing conditions. In Exp. 1, three pens (or experimental units) of five pigs each (average weight $\pm$ s.e., 70 $\pm$ 0.5 kg) were assigned to a control diet (with vitamin and trace mineral premixes) or diets with 50 or 100% of the premixes deleted. Pigs were fed to market weight under sub-optimal housing conditions with sawdust-covered concrete floor and no electrical ventilation. In Exp. 2, three pens of four pigs each (average weight $\pm$ s.e., 56 $\pm$ 1.1 kg) were assigned to a control (with vitamin and trace mineral premixes), Diet-P (100% of the premixes deleted) or Diet-P+E (Diet-P plus 100 mg $\alpha$-tocopherol acetate/kg diet fed for the last 2 wk before slaughter). Pigs were fed to market weight under optimal housing conditions with 70%-slatted concrete floor, electrical ventilation and temperature control. No significant differences were found in average daily gain (ADG), average daily feed intake (ADFI), and gain/feed among treatments in both experiments, but in Exp. 2 done with younger pigs, ADG and ADFI tended to be higher in the control group than in pigs fed diet without premixes. Hemoglobin content, hematocrit and red blood cell count were not influenced by the deletion of premixes. Backfat thickness was not different among treatments. Fecal Mn (twofold) and Zn (threefold) contents were higher in the control than in pigs fed diets without the premixes. Serum trace mineral contents were not influenced by diets. $\alpha$-Tocopherol content in gluteus maxima was decreased (P< 0.01) by deleting the dietary premixes, but increased to the level higher than the control by adding 100 mg $\alpha$-tocopheryl acetate/kg diet fed for the last 2 wk before slaughter. Results indicate that: 1) supplementary vitamins and trace minerals may not be necessary for optimum growth in finishing pigs, and 2) deletion of the dietary premixes reduces muscle vitamin E content, but the reduced content can be reversed by adding $\alpha$- tocopherol to diets fed for the last 2 wk before slaughter. The deletion may help to alleviate the environmental load of certain minerals from manure.

The Effect of Cyclic Load on Different Femoral Fixation Techniques in Anterior Cruciate Ligament Reconstruction (전방십자인대 재건시 이식건의 대퇴골측 고정에 대한 주기성인장부하의 효과)

  • Song Eun-Kyoo;Kim Jong Seok
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.2 no.1
    • /
    • pp.28-36
    • /
    • 2003
  • Purpose: To determine and to compare the effects of cyclic loading on the fixation strength of different femoral fixation methods in ACL reconstruction. Materials and Methods: Biomechanical test using an Instron(R) machine (Model No.5569. Mass, U.S.A) were carried out to compare the pull out strength of six different femoral fixation techniques after a cyclic loading in 72 Yorkshire pig knees. The graft-bone complex was cyclically loaded between 30N and 150N at 50 mm/min rate for 1000 cycles and maximal tensile testing was performed. A preload of 30N was applied to the graft along the axis of the tunnel 15 minutes. ANOVA and the Duncan multiple comparison test was used for the statistical analysis. Results: The mean maximum tensile strength of femoral fixation before and after the cyclic loading test were 1003.4$\pm$145N and 601.1$\pm$154N in hamstring-LA screw(R) group, 595.5$\pm$104N and 360.7$\pm$56N in hamstring-Bioscrew(R) group, 1431.7$\pm$135N and 710.7$\pm$114N in hamstring-Semifix(R) group, 603.6$\pm$54N and 459.1$\pm$46N in hamstring-Endobutton(R) fixation group, 1067.4$\pm$145 and 601.8$\pm$134N in the BPTB-Titanium interference screw group, and 987.1$\pm$168N and 588.7$\pm$124N in the BPTB-Bioscrew(R) group. And these data illustrated that cyclic loading reduces the maximum tensile strength by 40 $\%$, 39 $\%$, 50 $\%$, 24 $\%$, 44 $\%$, 40 $\%$ respectively. Conclusions: With the results of these experiments it should be emphasized that rehabilitation exercises after anterior cruciate ligament reconstruction should be executed with precaution as the repetitive flexion and extension of the knee would compromise the maximum tensile strength of the graft tendon.

  • PDF

Comparison of Construction Costs for Bridge Foundation with Optimization of Steel and PHC Embedded Piles (강관 및 PHC 매입말뚝의 최적화에 따른 교량기초의 공사비 비교)

  • Yun, Jung-Mann;Yea, Geu-Guwen;Kim, Hong-Yeon;Kim, Dong-Min;Kim, Soo-Lo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.71-78
    • /
    • 2016
  • In this study, execution costs of the foundation system are compared with PHC and steel pile in the same soil layers and load condition. Steel piles installed on the thin weathered rock are reduced as 12.5% in comparison with the number of PHC piles. Steel piles installed on the soft rock through weathered rock with 1.7m of thickness reduce the number of piles as 35.7% (STK 400) and 46.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Also, they reduce the number of piles as 26.5% (STK 400) and 38.8% (STK 490), respectively, in comparison with steel piles (STK 400) installed on the weathered rock. When the thickness of footings is constant, steel piles installed on the soft rock may reduce the area of footings up to 12.2% (STK 400) and 45.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Total cost of foundation system installed on the soft rock with steel piles (STK 400) increases as 12%, whereas in case of replaced with steel piles (STK 490), it reduces as 16% in comparison with PHC piles installed on the weathered rock. This is because the cost reduction due to the number of piles and footing area is more effective despite high cost of steel piles (STK 490). When the thickness of weathered rock is less than 5m, installing steel piles (STK 490) on the soft rock through it is more economic in comparison with installing PHC piles on the weathered rock.