• Title/Summary/Keyword: Reduced Cost

Search Result 2,621, Processing Time 0.03 seconds

Development and Long Term Evaluation of a Critical Pathway for the Management of Microvascular Decompression

  • Lee, Jeong A;Kim, Jung Sook;Park, Kwan;Kong, Doo-Sik
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.20 no.1
    • /
    • pp.117-127
    • /
    • 2014
  • Purpose: In order to provide a systematic and standardized treatment course for MVD patients, a critical pathway (CP) program was developed and the results of its long term application were analyzed. Methods: This was a methodological study. The CP was established and applied to 75 (step I) and 1,216 (step II). Another group of 56 with similar features was used as a control group. Results: The application of CP turned out to be useful in many regards: the rate of hearing loss was reduced from 1.8% to 0% (step I) and 0.5% (step II), and low cranial nerve palsy was reduced from 1.8% to 1.3% and 0.7%, respectively. The length of hospitalization decreased by 2.56 days (25.2%) for step I and 3.05 days (30.0%) for step II. Days of ICU stay were reduced by 7.9% and 1.8%. The total cost per patient was reduced by 14.8% (step I). The cost per day was increased by 13.7% and 52.4%. An increase in the patient satisfaction index was noted, as shown in the ICU information guide (p=.002). Conclusion: The development and application of CP was found to improve the quality of medical treatment and the efficacy of hospital management in MVD patients. Well organized and efficient system and multidisciplinary teamwork are the key component of the successful application of CP.

Real-Time Color Gamut Mapping Method Based on the Three-Dimensional Difference Look-Up Table (3차원 차분 룩업 테이블을 이용한 실시간 색역 사상 기법)

  • Han, Dong-Il
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.42 no.6
    • /
    • pp.111-120
    • /
    • 2005
  • A cost effective three-dimensional color gamut mapping architecture is described. The conventional three-dimensional reduced resolution look-up table is considered and the concept of three-dimensional reduced resolution difference look-up table is introduced for cost effective and real-time color gamut mapping. The overall architecture uses one-dimensional memory decomposition of three-dimensional gamut mapping look-up table, three-dimensional interpolation and simple addition operation for generating the final gamut mapped colors. The required computational cost is greatly reduced by look-up table resolution adjustment and further reduced by the gamut mapping rule modification. The proposed architecture greatly reduces the required memory size and hardware complexity compared to the conventional method and it is suitable for real-time applications. The proposed hardware is suitable for FPGA and ASIC implementation and could be applied to the real-time display quality enhancement purposes.

Construction of the reduced system by two-level scheme and time integration in the reduced system under arbitrary loading (2단계 축소기법에 의한 축소시스템의 구성과 동하중에 의한 구조물의 동적 거동에 관한 연구)

  • Kim, Hyun-Gi;Cho, Maeng-Hyo
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.453-458
    • /
    • 2004
  • This study proposes a new two-level condensation scheme for the construction of a reduced system. In the first step, the candidate area is selected for the construction of the reduced system by energy estimation in element-level. In the second step, primary degrees of freedom are selected by sequential elimination from the candidate degrees of freedom linked to the selected elements. Numerical examples demonstrate that the proposed method saves the computational cost effectively and provides a reduced system which predicts the eigenvalues accurately. Moreover, the well-constructed reduced system can present the reliable behavior of the structure under arbitrary dynamic loads comparing to that of global system. Time integration in a reduced system can save the computing time remarkably. Through a few numerical examples, the efficiency and reliability of the proposed scheme are verified.

  • PDF

Cost-Effectiveness of Converting Fish Waste into Liquid Fertilizer

  • Kim, Joong-Kyun
    • Fisheries and Aquatic Sciences
    • /
    • v.14 no.3
    • /
    • pp.230-233
    • /
    • 2011
  • To determine the cost-effectiveness of converting fish waste into liquid fertilizer, this study analyzed the production of 3 L of liquid fertilizer from the fermentation of fish waste. The total product cost of the fertilizer was calculated to be $165.26 for a one-batch operation. If the seed culture was repeated five times, the total product cost could be reduced to $36.39/L. According to this analysis, the reutilization of fish waste as liquid fertilizer was not particularly economically attractive at present, and plant-scale production would be necessary for commercialization. This is the first cost-effectiveness analysis of the bioconversion of fish waste into liquid fertilizer.

Setup Cost Reduction in a Multi-Product Dynamic Lot-Sizing Model (다종제품의 동적 로트크기결정 모형에서의 생산준비비용 절감효과에 관한 연구)

  • Lee, Woon-Seek;Joo, Chul-Min
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.217-224
    • /
    • 2000
  • This paper analyzes the effects of setup cost reduction in a dynamic lot-sizing model for a single-facility multi-product problem. In the model, demands for each product are known, no backlogging is allowed, and a single resource is employed. Also, setup cost is defined as a function of capital expenditure to invest in setup cost reduction. Furthermore, in each production period the facility (or plant) produces many products, each representing a fixed part of the involved production activity (or input resource quantity). In this paper, the structure of the optimal solution is characterized and an efficient algorithm is proposed for simultaneously determining the optimal lot size with reduced setup cost and the optimal investment in setup cost reduction. Also, the proposed algorithm is illustrated by a numerical example with a linear and an exponential setup reduction functions.

  • PDF

Policy Safety Stock Cost Optimization : Xerox Consumable Supply Chain Case Study (정책적 안전재고의 비용 최적화 : 제록스 소모품 유통공급망 사례연구)

  • Suh, Eun Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.5
    • /
    • pp.511-520
    • /
    • 2015
  • Inventory, cost, and the level of service are three interrelated key metrics that most supply chain organizations are striving to optimize. One way to achieve this goal is to create a simulation model to conduct sensitivity analysis and optimization on several different supply chain policies that can be implemented in actual operation. In this paper, a case of Xerox global supply chain modeling and analysis to assess several "what if" scenarios for the consumable policy safety stock is presented. The simulation model, combined with analytical cost model and optimization module, is used to optimize the policy safety stock level to achieve the lowest total value chain cost. It was shown quantitatively that the policy safety stock can be reduced, but it is offset by the inbound premium transportation cost to expedite supplies in shortage, and the outbound premium transportation cost to send supplies to customers via express shipment, requiring fine balance.

An Analysis of Maintenance Cost of Preventive Optimized-Rehabilitation Area Method in Asphalt Concrete Pavement (예방적 최소단면 보수공법 적용 아스팔트 도로포장의 유지관리 비용분석)

  • Kim, Nak-Seok;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.45-51
    • /
    • 2009
  • The paper presents the economic analysis of optimized-rehabilitation area method considered as one of the preventive maintenance methods in asphalt concrete pavement. The optimized-rehabilitation area was selected based on the analysis of traffic lane characteristics. The main concept of the selected method was to minimize the maintenance cost. The effective width of traffic lane in this method was 70 cm of each wheel path. According to the traffic survey conducted in this research, more than 95% of vehicles passed within the width of each wheel path. The new preventive optimized-rehabilitation area method showed less maintenance cost than the conventional overlay. In addition, traffic congestions and the user cost can be reduced. The research results revealed that the total maintenance cost was reduced by 35% by using the new method compare to the conventional one.

A Location Management Scheme using User Locality in Cellular Communciation Systems (셀룰러 통신 시스템에서 사용자 지역성을 고려한 위치 관리 기법)

  • Yang, Gwon-U;Gil, Jun-Min;Kim, Gi-Beom;Jeong, Sun-Yeong;Hwang, Jong-Seon
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.26 no.9
    • /
    • pp.1135-1144
    • /
    • 1999
  • 본 논문에서 우리는 셀룰러 통신 시스템을 위한 위치갱신과 위치질의 비용을 줄일 수 있는 새로운 위치관리 기법을 제안한다. 위치갱신 및 위치질의 비용을 줄이기 위하여, 제안한 위치관리 기법은 사용자 지역성을 사용한다. 사용자 지역성은 이동 지역성과 호 지역성으로 이루어진다. 이동 지역성을 갖는 이동단말들을 위한 위치갱신은 지역 PVLR(Proxy-Visitor Location Register) 갱신에 의해 위치갱신 비용을 줄일 수 있다. 호 지역성을 갖는 이동단말들을 위한 위치질의는 지역 PVLR 질의에 의해 위치질의 비용을 줄일 수 있다. 분석 모델을 통하여, 제안한 기법의 성능 분석과 IS-41 표준과 제안 기법과의 성능을 비교한다. 사용된 비교 척도는 네트워크 비용, 데이타베이스 비용 그리고 호 설정 지연이다. 이들 모든 척도들에 대해서, 제안 기법이 IS-41 표준에서 정의된 위치관리 기법보다 더 좋은 성능을 보인다. 또한 비교 결과는 CMR(Call-to-Mobility Ratio)에 상관없이 제안 기법이 IS-41 기법보다 성능이 좋음을 보여준다. Abstract In this paper, we propose a new location management scheme for cellular communication systems with the goal of reducing both location update and query cost. In order to reduce both location update and query cost, the proposed scheme uses user locality. User locality consists of movement and call locality. For mobile terminals with movement locality, location update cost is reduced by local PVLR(Proxy-Visitor Location Register) update. Location query cost is reduced by local PVLR query for mobile terminals with call locality. Through analytical models, we analyze the performance of the proposed scheme and compare it with that of the IS-41 scheme. The measures of comparison used are the network cost, the database cost, and the call set up delay. For all these measures, the proposed scheme performs better than the location management scheme defined in the IS-41 standard. Result comparison also shows that the our scheme performs better than the IS-41 scheme, regardless of CMR(Call-to-Mobility Ratio).

Energy Performance and Cost Assessment for Implementing GroundSource Heat Pump System in Military Building (군사시설 내 지열 히트펌프 시스템 적용에 따른 에너지 성능과 비용 절감 효과 평가)

  • Byonghu Sohn;Kyung Joo Cho;Dong Woo Cho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.18 no.4
    • /
    • pp.45-57
    • /
    • 2022
  • The Ministry of National Defense of the Republic of Korea is showing a lot of interest in net zero-energy buildings (NZEBs) to reduce energy consumption of military facilities and to promote green growth policy in military sector. The application of building passive technologies and renewable energies is essential to achieving NZEBs. This paper analyzed energy performance and energy cost on the conventional heating and cooling system (baseline scenario) and three different alternative scenarios (ALT 1, ALT 2 and ALT 3) applied in a hypothetical military building. A building modeling and simulation software (DesignBuilder V6.1) with EnergyPlus calculation engine was used to calculate the energy consumption for each scenario. Overall, when the GSHPs are applied to both space airconditioning and domestic hot water (DHW) production, Alt-2 and Alt-3, the amount of energy consumption for target building can be greatly reduced. In addition, when the building envelope performance is increased like Alt-3, the energy consumption can be further reduced. The annual energy cost analysis showed that the baseline was approximately 161 million KRW, while Alt-3 was approximately 33 million KRW. Therefore, it was analyzed that the initial construction cost increase could be recovered within about 6.7 years for ALT 3. The results of this study can help decision-makers to determine the optimal strategy for implementing GSHP systems in military buildings through energy performance and initial construction cost assessment.

Survey of Corrosion Cost in China and Preventive Strategies

  • Ke, Wei;Li, Zhiqiang
    • Corrosion Science and Technology
    • /
    • v.7 no.5
    • /
    • pp.259-264
    • /
    • 2008
  • A national consultative project entitled "corrosion cost survey in China and preventive strategies" was funded by the Chinese Academy of Engineering in 1998. Soon afterwards, an expert group was organized jointly by the Institute of Metal Research, CAS and Chinese Society of Corrosion and Protection. The report on corrosion cost survey in China was published in 2003. According to this report the overall annual corrosion cost in China estimated by the Uhlig Method and Hoar Method at 1997-2001 was found to be 200.7 billion Yuan RMB and 228.8 billion Yuan RMB respectively, which is equivalent to 2% of the gross national product of China. However the total cost of corrosion including the direct and indirect cost was estimated to be more than 500 billion Yuan RMB per year in China. Among them, corrosion cost of infrastructure ranked in first comparing with other sectors. Although corrosion costs in some sectors, such as electric power, petrochemical, oil pipeline and railway in China has reduced in the past years, significant losses are still being encountered in most sectors of industries and cost-effective methods have not always been implemented. Both successful and unsuccessful cases in corrosion control and corrosion management were collected. As the investment in capital construction continues increasing rapidly in China, the maintenance and life extension of the infrastructures will become a big issue. The preventive strategies have been suggested