• Title/Summary/Keyword: Recycle process

Search Result 421, Processing Time 0.031 seconds

Recovering Hydration Performance of Cementitious Powder by Concret Waste according to Burning Temperature (폐콘크리트계 미분말의 소성조건에따른 수화성 회복)

  • 강태훈;정민수;안재철;강병희
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.81-87
    • /
    • 2003
  • The purpose of this study is the development of a recycling process to recover the hydrated ability of cement hydrate which accounts for a large proportion of cementitious powder by concrete waste in order to recycle cementitious powder by concrete waste as recycle cement. Therefore, after having theoretical consideration based on the properties of high-heated concrete, we consider the properties of hydration of cementitious powder in hardened mortar under various temperature conditions. As a result of experiment, it is revealed that an effective development of recycling cement is possible since the cementitious powder by concrete waste recovers a hydraulic property during burning at $600^{\circ}C$ or $700^{\circ}C$. And it is shown that the fluidity of mortar decreases rapidly as the burning temperature of recycle cement increases. however, the improved effect of fluidity is predominant if adding the additive such as fly-ash or blast furnace slag.

  • PDF

Effect of HRT and Internal Recycle Ratio on Removal of Organic and Nitrogen in Swine Wastewater by Anoxic-Oxic Process Combined with Membrane (분리막이 결합된 무산소·호기 공정을 이용한 축산폐수처리에서 수리학적체류시간 및 내부반송율이 유기물 및 질소제거에 미치는 영향)

  • Whang, gye dae;Lee, bong hee;Lee, hyun duk
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.6
    • /
    • pp.603-609
    • /
    • 2004
  • The objective of this study was to determine the optimal operation conditions in an anoxic oxic process to eliminate both organic and nitrogen matters in swine wastewater. For the purpose of this, the removal efficiency was evaluated with various HRTs and internal recycling ratio. During the whole 580 days of experiment, HRTs had been gradually decreased in an order of 20, 14, 12 and l0days, and the internal recycle ratio was kept at 20Q. So as to determine the effect of the internal recycle ratio on the nitrogen removal, the internal recycle ratio had been gradually increased from 20Q to 50Q while HRT was maintained at 12days. As a result, it was shown that the removal efficiency of organic matter was above 95% regardless of changing of HRTs. The average influent concentration of TCODcr and SCODcr were 24,854 mg/L and 18,920 mg/L, respectively. Average removal efficiency of TKN was shown to be nearly 98% when HRT was kept at 12days; however, the $NH_4{^+}-N$ concentration of effluent was shown to be increased when the loading rate of $NH_4{^+}-N$ was increased to $0.602 kgNH_4{^+}-N/m^3$-day by means of decreasing HRT to 10days. It was concluded that nitrogen loading rates should be more considered rather than organic loading rates in case of determining an optimal HRT. When gradually increasing the internal recycle ratio from 20Q to 50Q, the removal efficiency of organic matters and TKN were 96% and 98%, respectively so that no significant changes in removal efficiency was detected. However, when the internal recycle ratio was kept at 50Q, it was revealed that the $NO_3-N$ concentration of effluent seemed to drop and the average $NO_3-N$ concentration of effluent was around 52 mg/L.

Development and Evaluation of Dry Lubricant Recycle Technologies for Wire Drawing Process (와어어 인발용 건식 윤활제의 재생기술 개발 및 평가)

  • Kim, Sun-Ho;Jang, Gyu-Chul;Lee, Chi-Wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.13 no.2
    • /
    • pp.35-40
    • /
    • 2014
  • Wire drawing is aplastic deformation process that produces a wire with a desired diameter by pulling the end of the wire through a die. During the cold wire drawing process, the temperature between the wire and the die bearing is increased. This temperature increase causesenergy consumption increase, bad wire quality, and decreased die life. To reduce friction and avoid high temperature between the wire and the die in the cold wire drawing process, a dry lubricant with soap particles is used. It is not possible to reused the lubricant onceiron oxide is attached to the soap particlesat high pressure die. In this study, recycling technologies for wasted soap particles with processes of crushing, separation, and screening are developed. From the evaluation, the recycling efficiency was found to be 86.97%.

FASTMET$\circledR$ Process for Steel Mill Waste Recycling

  • Tanaka, Hidetoshi;Harada, Takao;Sugitatsu, Hiroshi
    • Proceedings of the IEEK Conference
    • /
    • 2001.10a
    • /
    • pp.387-392
    • /
    • 2001
  • Kobe Steel, LTD. and Midrex Technologies Inc. jointly developed the FASTMET$\circledR$ process as a steel mill waste recycle technology in which the DRI product meets BF feed material or BOF/EAF feed material requirements. FASTMET(R) process turns value-less wastes into valuable DRI and sellable zinc oxide, and gives the solution for the steel mill wastes recycling from both economical and environmental viewpoints. During the development of the process, Laboratory, Pilot Plant and Demonstration Plant tests were carried out from 1990 to 1998. The first FASTMET(R) commercial plant began operation in April, 2000 and the second commercial plant started in April, 2001 Both commercial plants have proceeded successfully preying that FASTMET$\circledR$ is a suitable process for recycling steel mill waste and for producing DRI as an iron source.

  • PDF

Removal of Organic Matter, Nitrogen and Phosphorus in an UASB Sewage Treatment Process with Recycle of Aerated Bio-Filter Effluent (UASB를 이용한 혐기성 하수처리공정에서 ABF 유출수 반송에 따른 유기물질과 질소 및 인 제거)

  • Tian, Dong-Jie;Byun, Byeong-Su;Lim, Hyun-Suk;Jun, Hang-Bae
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.5
    • /
    • pp.381-387
    • /
    • 2013
  • Nitrogen and phosphorus removal was investigated in an UASB-ABF (Up-flow anaerobic sludge blanket - aerated bio-filter) anaerobic sewage treatment system. Successful removal of nitrogen and phosphorus with organic matters was possible in the UASB-ABF system from the results of 160 days operation with the influent raw domestic sewage. Removal efficiencies of organic matter (as TCOD) showed 64% in UASB without recycle of the ABF effluent, however, they increased to 92%, 95%, 96% with 120%, 180% and 240% recycle of the ABF effluent, respectively. Increasement of the organic matter removal was not prominent at recycle ratio above 180%. Apparent increase in TN removal occurred with recycle of the ABF effluent. TN removal efficiency was 18% without recycle, but it increased to 82% with 240% recycle of the ABF effluent. And stable nitrification above 95% was possible as a result of efficient removal of organic matter in the UASB with and without recycle of the effluent. Removal of both TP and $PO{_4}^{3-}$-P also increased remarkably with recycle of the effluent. Without recycle of the effluent, that is at strict anaerobic condition in UASB, TP was not removed, however, its removal efficiency increased to 51%, 63%, 71% at recycle ratios of 120%, 180%, 240%, respectively mainly at UASB.

Simultaneous N-P Removal of Wastewater with Flow Variation by Anaerobic-Aerobic Activated Sludge Process(I) (혐기-호기 활성슬러지법에 의한 유량변동이 있는 폐수의 N-P 동시 제거에 관한 연구(I))

  • 이민규;서근학
    • Journal of Environmental Science International
    • /
    • v.4 no.5
    • /
    • pp.509-516
    • /
    • 1995
  • The treatment performances of anaerobic-aerobic activated sludge process were investigated under various operation conditions. The treatment system proposed in this study gave a relatively stable performance against hourly change of the flow rate and showed a satisfactory removal of nitrogen and phosphorus compounds under experimental conditions. The recycle ratio of mixed liquor from aerobic to anaerobic region and peak coefficient primarily controlled the extent of nitrogen removal. The recycle ratio had the optimum values which were determined by the microbial activities of nitrification and denitrification. The behavior of the treatment unit could be simulated by using the kinetic equations and reactor models which considered the treatment units as complete mixing tanks.

  • PDF

Simultaneous N-P Removal of Wastewater with Flow Variation by Anaerobic-Aerobic Activated Sludge Process(I) (혐기-호기 활성슬러지법에 의한 유량변동이 있는 폐수의 N-P 동시 제거에 관한 연구(I))

  • Lee, Min-Gyu;Suh, Kuen-Hack
    • Journal of Environmental Science International
    • /
    • v.4 no.5
    • /
    • pp.123-123
    • /
    • 1995
  • The treatment performances of anaerobic-aerobic activated sludge process were investigated under various operation conditions. The treatment system proposed in this study gave a relatively stable performance against hourly change of the flow rate and showed a satisfactory removal of nitrogen and phosphorus compounds under experimental conditions. The recycle ratio of mixed liquor from aerobic to anaerobic region and peak coefficient primarily controlled the extent of nitrogen removal. The recycle ratio had the optimum values which were determined by the microbial activities of nitrification and denitrification. The behavior of the treatment unit could be simulated by using the kinetic equations and reactor models which considered the treatment units as complete mixing tanks.

Analysis of sewage treatment process for the improvement of T-N removal process (T-N 제거공정 개선을 위한 하수처리장 공정 분석)

  • Shin, Choon Hwan
    • Journal of Environmental Science International
    • /
    • v.27 no.2
    • /
    • pp.99-107
    • /
    • 2018
  • In order to design the improvement process for T-N removal, the treatment process of Suyoung, Gangbyeon, and Noxan sewage treatment plants (STP) in Busan was anlayzed. Suyoung STP shows a T-N removal efficiency of about 69.8% with MLE(Modified Ludzack ettinger) and A2O+MBR. However, it is necessary to improve the process to maintain over DO of 1 mg/L and is required to install a flow control tank to minimize the rainfall effect. Gangbyun STP shows a about 70.2% T-N removal efficiency with A2O+GFF(gravity fiber filtration). However, in order to improve T-N removal efficiency, it is needed to install MLE process to treat recycle water. Noksan STP shows a T-N removal efficiency of about 71.0% with MLE+Chemical treatment and shows stable T-N concentration in effluent. However, it is required a toxic chemical management process because bad wastewater flows into the STP, also is necessary a process improvement in order to increase internal recycling ratio. Especially, it is required a process improvement to increase HRT of nitrification tank because Suyoung and Gangbyeon STPs shows low nitrification efficiency during winter season.

A Study on Separation Mechanisms in Tangential Flow Membranes (접선류 방식의 막분리 공정에 있어서 분리기구 해석에 관한 연구)

  • 이기정;허병기목영일
    • KSBB Journal
    • /
    • v.4 no.3
    • /
    • pp.281-287
    • /
    • 1989
  • The experimental study reported herein was to investigate to separation characteristics of a tangential flow membrane in a continuous recycle situation. Physical and dynamic analyses are performed on the membrane system in order to relate relevant variables to the capacity of separation. The results of separation process may be summarized by a proposed equation:Sh=A(Re.Sc.dh/L)1/3. It was shown also by the analyses that effective separation of sugar and cell was attainable by means of tangential membranes, thereby enhancing ethanol productivity in fermentation with continuous cell and substrate recycle.

  • PDF

MODELING OF AUTOMOTIVE RECYCLING PLANNING IN THE UNITED STATES

  • CHOI J.-K.;STUART J. A.;RAMANI K.
    • International Journal of Automotive Technology
    • /
    • v.6 no.4
    • /
    • pp.413-419
    • /
    • 2005
  • The United States automotive recycling infrastructure has successfully reduced the amount of automotive waste sent to landfills, especially since the introduction of shredders in the late 1950s. Shredders are necessary to process and recycle automotive hulks and other durable goods. However, this industry faces significant challenges as the automotive manufacturers are increasing the use of nonmetallic components which are difficult to recycle. Additionally, it is becoming obvious that automobiles contain hazardous materials which place heavy burdens on the environment. To address this growing concern, we propose a process planning model for automotive shredders to make tactical decisions regarding at what level to process and at what level to reprocess feed stock materials. The purpose of this paper is to test analytical models to help shredders improve the profitability and efficiency of the bulk recycling processes for end of life automobile returns. The work is motivated by an actual recycling problem that was observed at Capitol City Metals shredding facility in Indianapolis, Indiana.