• 제목/요약/키워드: Real-time multibody dynamics

검색결과 23건 처리시간 0.028초

Subsystem Synthesis Methods with Independent Coordinates for Real-Time Multibody Dynamics

  • Kim Sung-Soo;Wang Ji-Hyeun
    • Journal of Mechanical Science and Technology
    • /
    • 제19권spc1호
    • /
    • pp.312-319
    • /
    • 2005
  • For real time dynamic simulation, two different subsystem synthesis methods with independent generalized coordinates have been developed and compared. In each formulation, the subsystem equations of motion are generated in terms of independent generalized coordinates. The first formulation is based on the relative Cartesian coordinates with respect to moving subsystem base body. The second formulation is based on the relative joint coordinates using recursive formulation. Computational efficiency of the formulations has been compared theoretically by the arithmetic operational counts. In order to verify real-time capability of the formulations, bump run simulations of a quarter car model with SLA suspension subsystem have been carried out to measure the actual CPU time.

전동식 동력 조향 장치 시험을 위한 HILS(Hardware-In-the-Loop Simulation) 시스템 개발 (HILS(Hardware-In-the-Loop Simulation) Development of a Steering HILS System)

  • 류제하;노기한;김종협;김희수
    • 한국자동차공학회논문집
    • /
    • 제7권9호
    • /
    • pp.105-111
    • /
    • 1999
  • The paper presents development of a Hardware-In-the-Loop simulation (HILS) system for the purpose of testing performance, stability, and reliability of an electronic power steering system(EPS). In order to realistically test an EPS by the proposed HILS apparatus, a simulated uniaxial dynamic rack force is applied physically to the EPS hardware by a pnumatic actuator. An EPS hardware is composed of steering wheel &column, a rack & pinion mechanism, andas motor-driven power steering system. A command signal for a pneumatic rack-force actuator is generated from the vehicle handling lumped parameter dynamic model 9software) that is simulated in real time by using a very fast digital signal processor. The inputs to the real-time vehicle dynamic simulation model are a constant vehicle forward speed and from wheel steering angles driven through a steering system by a driver. The output from a real-time simulation model is an electric signal that is proportional to the uniaxial rack force. The vehicle handling lumped parameter dynamic model is validated by a fully nonlinear constrained multibody vehicle dynamic model. The HILS system simulation results sow that the proposed HILS system may be used to realistically test the performance stability , and reliability of an electronic power steering system is a repeated way.

  • PDF

A collaborative simulation in shipbuilding and the offshore installation based on the integration of the dynamic analysis, virtual reality, and control devices

  • Li, Xing;Roh, Myung-Il;Ham, Seung-Ho
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제11권2호
    • /
    • pp.699-722
    • /
    • 2019
  • It is difficult to observe the potential risks of lifting or turn-over operations in the early stages before a real operation. Therefore, many dynamic simulations have been designed to predict the risks and to reduce the possibility of accidents. These simulations, however, have usually been performed for predetermined and fixed scenarios, so they do not reflect the real-time control of an operator that is one of the most important influential factors in an operation; additionally, lifting or turn-over operations should be a collaboration involving more than two operators. Therefore, this study presents an integrated method for a collaborative simulation that allows multiple workers to operate together in the virtual world. The proposed method is composed of four components. The first component is a dynamic analysis that is based on multibody-system dynamics. The second component is VR (virtual reality) for the generation of realistic views for the operators. The third component comprises the control devices and the scenario generator to handle the crane in the virtual environment. Lastly, the fourth component is the HLA (high-level architecture)-based integrated simulation interface for the convenient and efficient exchange of the data through the middleware. To show the applicability of the proposed method, it has been applied to a block turn-over simulation for which one floating crane and two crawler cranes were used, and an offshore module installation for which a DCR (dual-crane rig) was used. In conclusion, the execution of the proposed method of this study is successful regarding the above two applications for which multiple workers were involved.