Due to global environmental regulations and policies with rapid advancement of renewable energy technologies, the development type of renewable energy sources (RES) in power systems is expanding from small-scale distributed generation to large-scale grid-connected systems. In the near future, it is expected that RES achieves grid parity which means the equilibrium point where the power cost of RES is equal to the power costs of conventional generators. However, although RES would achieve the grid parity, the cost related with development of large-scale RES is still a big burden. Furthermore, it is hard to determine a suitable capacity of RES because of their output characteristics affected by locations and weather effects. Therefore, to determine an optimal capacity for RES becomes an important decision-making problem. This study proposes a method for determining an optimal installed capacity of RES from the business viewpoint of an independent power plant (IPP). In order to verify the proposed method, we have performed case studies on real power system in Incheon and Shiheung areas, South Korea.
The paper proposes an optimal sizing method of a customer's battery energy storage system (BESS) which aims at managing the electricity demand of the customer to minimize electricity cost under the time of use(TOU) pricing. Peak load limit of the customer and charging and discharging schedules of the BESS are optimized on annual basis to minimize annual electricity cost, which consists of peak load related basic cost and actual usage cost. The optimal scheduling is used to assess the maximum cost savings for all sets of candidate capacities of BESS. An optimal size of BESS is determined from the cost saving curves via capacity of BESS. Case study uses real data from an apartment-type factory customer and shows how the proposed method can be employed to optimally design the size of BESS for customer demand management.
Among the main functions of the grid-connected photovoltaic (PV) system, the anti-islanding operation function is a very important problem. Recently, due to the improvement in power generation efficiency and the maintenance advantages in PV system, the use of string inverter has increased so that the possibility of islanding operation has been raised. Generally, when a power system faults, the PV inverter must be disconnected from power system within 10 cycles by the anti-islanding operation function. However, in the real-time of power system, the output power of the PV system within 10cycles is effected. In this paper, we analyzed the effect of grid-connected PV system on power quality in a short time within 10 cycles on fault case of power system using the Matlab Simulink program.
Nowadays, a DC microgrid that can link various distributed power sources is gaining much attention. Accordingly, research on fault situations, such as line-to-line and line-to-ground faults of the DC microgrid, has been conducted to improve grid reliability. However, the blackout of an AC system and the oscillation of a DC bus voltage have not been reported or have not been sufficiently verified by previous research. In this study, a 20 kW DC microgrid testbed using a power HIL simulation technique is proposed. This testbed can simulate various fault conditions without any additional grid facilities and dangerous experiments. It includes the blackout of the DC microgrid caused by the AC utility grid's blackout, a drastic load increment, and the DC bus voltage oscillation caused by the LCL filter of the voltage source converter. The effectiveness of the proposed testbed is verified by using Opal-RT's OP5707 real-time simulator with a 3 kW prototype three-port dual-active-bridge converter.
스마트그리드는 기존의 전력망과 정보통신 기술을 융합하여 에너지 효율을 최적화할 수 있는 차세대 지능형 전력망이다. 현재까지 표준화 및 호환성에 대한 해결책이 진행 중인 가운데 스마트그리드 사업은 소비자에게는 전력요금의 실시간 확인을 통해 능동적인 전력소비를 유도하고, 공급자에게는 예상 발전량 측정을 통해 보다 안정적인 전력 시스템을 운용하도록 할 수 있다는 장점이 있다. 활발하게 스마트 산업이 발전함에 따라 AMI 시스템의 원격제어 시스템을 구현하기 위해서 무선 통신이 많이 고려되고 있으며 ZigBee 센서를 이용한 무선 통신을 다양한 분야에 적용하고 있다. 본 논문에서는 스마트그리드 환경에서 적용되고 있는 ZigBee 무선 통신 환경의 주소 지정 방식과 라우팅 알고리즘의 성능을 향상시키기 위한 새로운 좌표 값 알고리즘을 제안하였다. 기존 알고리즘을 이용한 분산 주소 할당 기법의 낭비되는 주소공간의 문제를 해결하기 위해 (x, y) 2개의 좌표축을 제안하여 16bit 주소공간을 분할하여 사용한다. 각 노드에서 라우팅 시 좌표 값을 이용하여 적은 비트별 연산이 수행되며 멀티 홉을 감소시킬 수 있다. 이에 대한 성능 분석으로 제안한 알고리즘은 수학적 분석 모델을 사용하였고 ZigBee 무선 통신 환경의 계층적 라우팅에서 사용하는 경로 벡터를 사용하여 센서 노드의 멀티 홉 카운트 결과를 도출하였다. 수학적 분석결과 ZigBee 분산 주소 할당 기법과 기존 알고리즘에 비해 평균 멀티 홉의 수가 감소함으로써 에너지 효율이 향상됨을 입증하였다.
스마트 그리드의 도입으로 그동안 중앙 집중적인 단방향 전기공급 방식에서 벗어나 전기 공급자와 소비자가 상호작용을 통해 에너지 정보를 주고받으며, 수평적, 분산적, 협력적, 네트워크의 형성이 가능하여 전력공급자는 전력 사용 현황을 실시간을 파악, 공급량을 탄력적으로 조절할 수 있다. 또한 전력의 소비자 역시 전력 사용 현황에 따라 전력요금이 비싼 시간대를 피하여 사용 시간과 사용량을 조절할 수 있다. 특히 융 복합기술의 발전으로 기존에는 구현하기 불가능하였던 다양한 기기들이 개발되면서 새로운 전력산업의 혁명을 가속화 시키고 있는 상황이다. 이를 토대로 기존 전력산업을 대체하는데 가장 큰 핵심인 스마트파워그리드에 활용할 수 있는 융 복합기술을 살펴보고, 예상되는 기술의 사업화 시기 및 관심부분을 도출하여 전력산업 관련 발전소, 연구소 및 기업체 종사들에게 설문조사를 통해 분석한 결과 스마트파워그리드의 경우 국내 기술로드맵을 통해서 도출된 현황을 바탕으로 신규 발전소 건설 및 기존 발전소 계량화 사업에 융합하여 스마트파워그리드 발전소 실증에 접근할 경우 기존에 도출된 기술 외에 다양한 분야에서 국제 표준화, 인력양상, 특허, 평가 및 인증까지 실증적으로 이루어 질 수 있을 것이다.
스마트그리드 기술은 기존의 전력망 관리와 제어를 위해 ICT (Information and Communications Technologies)를 이용하여 전력 공급자와 소비자 간에 양방향으로 실시간 전력 정보의 교환을 통하여 에너지 효율을 극대화시키는 것을 목적으로 하고 있다. 본 논문에서는 IEEE 802.11s STDMA (Spatial Time Division Multiple Access) 기반의 다중 채널 스마트그리드의 NAN (Neighborhood Area Network) 네트워크에서 수리적 모델링에 기반한 계층 교차적 설계 기법을 이용하는 "JRS-MS" (Joint Routing and Scheduling for Multi-channel SmartGrid) 알고리즘을 제안한다. 제안 알고리즘은 다중 채널 스마트그리드 NAN 네트워크의 각 데이터 링크에서 데이터 전송량을 적절히 조절하고 동시에 플로우들 간에 간섭이 적은 고속 경로의 탐색을 수행한다. 이를 통하여 각 플로우들의 네트워크 이용률을 높여 전송률을 향상시킨다. 제안 알고리즘과 기존 제안 알고리즘인 JRS-SG (Jointly Routing and Scheduling for SmartGrid) 알고리즘 과의 비교 성능 분석을 통하여 JRS-MS 알고리즘이 다중 홉 NAN 무선 메쉬 네트워크를 경유하는 플로우들의 수가 늘어날 때 주어진 대역폭 자원을 최대로 활용하여 전송 성능을 향상 시킬 수 있음을 보였다.
A various algorism has been studied to extract possibly every energy from a wind turbine in conjunction with the increase of concern about wind power system. In order to verify these control algorism, it is essential to make the most similar conditions to the real wind turbine's environment. Therefore, using separately excited DC motor a wind turbine the most similar to the real turbine is simulated. Tower shadow effect and Wind shear effect are considered as well as inertia emulation. For the control of Back-to-Back Converter Vector current control methods and space vector pulse width modulation are used and for reducing THD of grid current LCL filter is considered. This simulation results verified the energy produced by wind all flows into the utility under the consideration of the characteristics of a wind turbine. The result of this paper is expected to be used as a basic material for analyzing the characteristics of the wind turbine generator.
When distributed powers are interconnected to the grid, lack of source stability may cause some events that should be measured and stored as soon as they occur. This paper presents a real-time hardware system that has been developed for quick and reliable monitoring of the distributed powers quality. The system is composed of a digital signal processor (MPC7410, Motorola) and a 16 bits A/D board (VMIVME3122, GE). To guarantee the real time operation, it is based on a real time OS (VxWorks). Hardware tests of the embedded system have been made to check the performances of the proposed system. Test signals of several events are generated by using a LabView (hardware) system. The tests show that the system complies with the desired IEEE standard for power quality monitoring.
For the purpose of more effective simulation of the utility interactive WPGS(Wind Power Generation System) the SWRW (Simulation method for WPGS using Real Weather condition) is used in this paper, in which those of three topics for the WPGS simulation. user-friendly method, applicability to grid-connection and the utilization of the real weather conditions, are satisfied. The simulation of the WPGS using the real weather condition including components modeling of wind turbine system is achieved by introducing the interface method of a non-linear external parameter and FORTRAN using PSCAD/EMTDC. The simulations of steady-state and transient-state are performed effectively by the introduced simulation method. The generator output and current supplied into utility can be obtained by the steady-state simulation, and THD can be achieved by analyzing the results as well. The transient - state of the WPGS can be analyzed by the simulation results of over cut-out wind speed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.