• Title/Summary/Keyword: Real Tim

Search Result 25, Processing Time 0.023 seconds

An Improvement of Fast Handoff Protocol using Modified Local Registration in Mobile Computing Environment (이동 컴퓨팅 환경에서 수정된 지역 위치등록을 이용한 고속 핸드오프 프로토콜 개선)

  • Han, Seung-Jin;Choe, Seong-Yong;Lee, Jeong-Hyeon
    • The KIPS Transactions:PartC
    • /
    • v.9C no.2
    • /
    • pp.267-276
    • /
    • 2002
  • By using wireless terminal, User that want to transmit multimedia traffic as well as simple text and voice have a tendency to increase. This paper proposes a fast handoff protocol that is suitable transmission for real-tim of multimedia traffic by using modified local registration. The proposed protocol solves the Triangle Routing Protocol that is one of existing opened issues without modifying protocol of CN, and we propose the method that MN is able to received a packet by real-time, even if MN is being handoff. We compare fast handoff protocol proposed in this paper with existing method n the registration cost and data packet transmission cost. As a result, we showed that fast handoff protocol proposed in this paper outperforms existing method.

Active Control of a New Cargo Handling System Adapted for Time-Varying Tide (조수간만의 차를 고려한 새로운 하역 시스템의 능동 제어)

  • Hyoung-Seok Kim;Dar-Do Chung;Seung-Bok Choi;Jae-Wook Lee
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.36 no.2
    • /
    • pp.61-71
    • /
    • 1999
  • This paper resents a novel cargo system adapted for a sea port subjected to severe time-varying tide. The proposed system can perform loading or unloading by using a sort of hydraulic elevator associated with real-tim position control. As a preliminary phase, a small-sized model of the cargo system is designed and constructed. The model consists of three principal components ; container palette transfer(CPT) car, platform with lifting columns and cargo ship. The platform activated by the electro-rheological(ER) valve-cylinder is actively controlled to track the position of the cargo ship subjected to be varied due to the time-varying tide and wave motion. Following the derivation of the dynamic model for the platform and cargo ship motions, an appropriate control scheme incorporating time sequence and PID(proportional-integral-derivative) controller is formulated and implemented. Both the simulated and the measured control results are presented to demonstrate the effectiveness of the proposed cargo system.

  • PDF

Reconstruction of Stereo MR Angiography Optimized to View Position and Distance using MIP (최대강도투사를 이용한 관찰 위치와 거리에 최적화 된 입체 자기공명 뇌 혈관영상 재구성)

  • Shin, Seok-Hyun;Hwang, Do-Sik
    • Investigative Magnetic Resonance Imaging
    • /
    • v.16 no.1
    • /
    • pp.67-75
    • /
    • 2012
  • Purpose : We studied enhanced method to view the vessels in the brain using Magnetic Resonance Angiography (MRA). Noticing that Maximum Intensity Projection (MIP) image is often used to evaluate the arteries of the neck and brain, we propose a new method for view brain vessels to stereo image in 3D space with more superior and more correct compared with conventional method. Materials and Methods: We use 3T Siemens Tim Trio MRI scanner with 4 channel head coil and get a 3D MRA brain data by fixing volunteers head and radiating Phase Contrast pulse sequence. MRA brain data is 3D rotated according to the view angle of each eyes. Optimal view angle (projection angle) is determined by the distance between eye and center of the data. Newly acquired MRA data are projected along with the projection line and display only the highest values. Each left and right view MIP image is integrated through anaglyph imaging method and optimal stereoscopic MIP image is acquired. Results: Result image shows that proposed method let enable to view MIP image at any direction of MRA data that is impossible to the conventional method. Moreover, considering disparity and distance from viewer to center of MRA data at spherical coordinates, we can get more realistic stereo image. In conclusion, we can get optimal stereoscopic images according to the position that viewers want to see and distance between viewer and MRA data. Conclusion: Proposed method overcome problems of conventional method that shows only specific projected image (z-axis projection) and give optimal depth information by converting mono MIP image to stereoscopic image considering viewers position. And can display any view of MRA data at spherical coordinates. If the optimization algorithm and parallel processing is applied, it may give useful medical information for diagnosis and treatment planning in real-time.

A Development of Offshore plant Piping Process Monitoring System Based on 3D CAD Model (3D CAD 모델 기반 해양플랜트 배관 공정 모니터링 시스템 개발)

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.58-65
    • /
    • 2020
  • 3D Models of offshore plant piping materials designed by 3D CAD systems are provided to the production processes in the form of 2D piping drawings and 2D piping installation drawings. In addition to the standard engineering information, the purchasing, procurement, manufacturing, installation, and inspection of raw materials are managed systematically in an integrated process control system. The existing integrated process management system can help reduce the processing time by managing the flow and progress of resources systematically, but it does not include 3D design model information. Hence, it is difficult to understand complicated pipe structures before installing the pipe. In addition, when design changes or immediate design modifications are required, it is difficult to find related data or exchange information quickly with each other. To solve this problem, an offshore plant-piping process-monitoring system was developed based on a 3D model. The 3D model-based piping monitoring system is based on Visual Studio 2017 C# and UNITY3D so that the piping-process work information can be linked to the 3D CAD model in real time. In addition, the 3D model could check the progress of the pipe installation process, such as block, size, and material, and the progress of functional inspection items, such as cleaning, hydraulic inspection, and pneumatic inspection.

A Study on the Combination of the Existing Monitoring System with the Safety Management Network System (기구축 계측시스템의 안전관리 네트워크 시스템 연계 방안에 관한 연구)

  • Lee, Chin-Hyung;Park, Ki-Tae;You, Young-Jun;Joo, Bong-Chul;Hwang, Yoon-Koog;Bae, In-Hwan
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.3
    • /
    • pp.47-53
    • /
    • 2009
  • This study performed the construction of test bed for the combination of the health monitoring system In Yongjong grand bridge with the safety management network system in order to explore the feasibility of combining the existing monitoring system with the safety management network system. For this purpose, connection program which consists of DAQ sender server program and DAQ receiver server program has been developed. DAQ sender server program installed in the connection server, which is located on the DMZ zone of the existing monitoring system, plays the role of communicating with the monitoring system. On the other hand, DAQ receiver server program installed in the connection server, which is located on the integrated operation center of the safety management network system, plays the part of gathering real time and tim history data of the existing monitoring system and storing them in the integrated operation server through the communication with the DAQ sender. Test bed demonstrated the feasibility of combining the existing monitoring system with the safety management network system.

  • PDF