• 제목/요약/키워드: Rate of Penetration

검색결과 874건 처리시간 0.031초

수직구의 상향굴착을 위한 RBM 굴진성능의 분석 (Analysis of RBM한s Penetration Capacity for Upward reaming of Shaft)

  • 이석원;조만섭;서경원;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.157-164
    • /
    • 2002
  • Based on the results of prototype air-shaft construction, penetration capacity of RBM(Raise Boring Machine) was analyzed and compared with TBM(Tunnel Boring Machine) performance in this study. Utilization, down time, net penetration rate and advance rate were evaluated and compared. By conducting the laboratory tests for rock properties with the analysis of penetration capacity, relation of penetration capacity and geotechnical parameters was studied. The results showed that much more higher value of utilization, however lower value of net penetration rate for RBM was obtained compared to those of TBM. In addition, as the strength of rock penetrated increased, higher value of net penetration rate was obtained contrarily to the results of TBM performance. Finally, new relationship between total hardness and net penetration rate for weak and weathered rock was derived from these results.

  • PDF

콘관입시험결과를 이용한 널말뚝의 관입속도 예측기법 개발 (Predicting Method of Penetration Rate of Sheet Pile Using Cone Penetration Test Result)

  • 이승현;임남규;김병일
    • 한국지반공학회논문집
    • /
    • 제23권12호
    • /
    • pp.53-60
    • /
    • 2007
  • 콘관입시험결과를 이용하여 널말뚝의 관입속도를 예측할 수 있는 프로그램을 개발하였다. 특히, 널말뚝의 시공에 따른 자유길이를 고려하여 널말뚝의 횡방향 진동에 따른 에너지 손실량을 정량적으로 평가하고 이를 해석 프로그램에 반영함으로써 초기 관입깊이에 대하여 말뚝의 관입속도를 과대하게 예측하는 것을 극복하고자 하였다. 개발된 프로그램에 의한 관입속도 계산결과를 기존의 현장시험결과와 비교분석하였는데 총 12m의 관입깊이에 대하여 예측한 관입속도값은 실측값의 $47%{\sim}120%$ 범위였으며 관입깊이가 작을수록 실측값과 예측값의 편차는 작았다.

대구경 Shield TBM의 암반층 굴착속도 (Net Penetration Rate of a Large Diameter Shield TBM in Hard Rock)

  • 박철환;송원경;신중호;천대성
    • 한국암반공학회:학술대회논문집
    • /
    • 한국암반공학회 2001년도 추계공동학술발표회 논문집
    • /
    • pp.115-120
    • /
    • 2001
  • In No. 1 tunnel for Kwnagju urban subway construction, net penetration rate of the shield TBM was analyzed. This tunnel of 540 m length is located in soil layers at starting and in hard rocks such as amphibolite and granitic gneiss at ending with 84 m length. The net penetration rate was dropped down to 2∼11 cm/hr in rock while 50∼80 cm/hr in soil. Theoretical penetration rate is analyzed in conditions of machine and rock in order to compare the actual net penetration rate. The relationships between net penetration rate and thrust force is also investigated in this report.

  • PDF

암반기계굴착공법의 적용연구 (Application of TBM/TBE to Mechanical Excavation in Rock)

  • 박철환;김길수
    • 터널과지하공간
    • /
    • 제2권1호
    • /
    • pp.177-189
    • /
    • 1992
  • As tunnel becomes longer and larger, TBM has become one of the most popular methods of excavatio in rock. This paper describes the degree of operation the degree of availability and penetration rate of TBM and TBE applied in Namsan roadway tunnelling site. Net penetration rate was 1.62m/hr for TBM and 0.72m/hr for TBE. Net penetration rate showed no direct relation to daily advance or penetration time, but the lower bound of penetration rate could be obtained from the relation with daily advance. For both of TBM and TBE, the degree of operation and the degree of availability were 33.8% and 68.6% respectively. Life time of normal cutter was $310m^3$ for TBM and $194m^3$ for TBE, while that of center and gauge cutter was about $50m^3$. When the two machines were compared, TBM showed 80% higher penetration rate, and 40% shorter life time of cutter.

  • PDF

진동타입기에 의한 쉬트파일의 관입속도 예측 (Prediction of Penetration Rate of Sheet Pile Driven by Vibratory Pile Driver)

  • 이승현;김병일;이종구;윤기용
    • 한국산학기술학회논문지
    • /
    • 제7권4호
    • /
    • pp.679-683
    • /
    • 2006
  • 진동타입기에 의한 말뚝의 관입과정을 운동방정식으로 나타내고 수치적분법을 이용하여 말뚝의 관입속도를 예측할 수 있는 프로그램을 개발하였다. 개발된 프로그램에 의한 관입속도 계산결과를 기존의 현장시험결과와 비교분석하였다. 프로그램에 의해 계산된 관입속도값은 말뚝의 근입깊이가 클수록 실측값에 가까운 값을 보였다. 작은 근입 깊이에서 실측값과 계산값의 차이가 큰 이유는 실제 시공시 작은 근입깊이에서는 말뚝의 휨운동과 비틀림운동이 커서 결과적으로 말뚝에 전달되는 연직방향 압축력이 감소되어 나타난 결과로 판단되었다.

  • PDF

Non-polar Solvents (Toluene and Styrene) Enhance Methanol Skin Absorption

  • Lim, Cheol-Hong;Yu, Il-Je
    • Toxicological Research
    • /
    • 제17권1호
    • /
    • pp.7-9
    • /
    • 2001
  • The quantitative assessment of the penetration of organic solvents through skin is necessary for the evaluation of health hazards in occupational environments. We investigated the rate of dermal penetration when mixed or single forms of organic solvents were placed into a diffusion cell in vitro or into an experimental animal in vivo. The diffusion rates of methanol. toluene, and styrene were 6.07, 0.129, and 0.046 mg/$cm^2$/h, respectively. When skin was exposed to the mixed solvent of methanol and toluene, the penetration rate of toluene did not change significantly (0.110 mg/$cm^2$/h). However, the rate of methanol penetration increased to 43.90 mg/$\textrm{cm}^2$/h. The penetration rate of methanol also increased significantly to 54.69 mg/$cm^2$/h by mixing it with styrene. The concentration of methanol in the blood was monitored during the epicutaneous exposure in rats. The blood concentration of methanol was increased by mixing methanol with toluene as seen in the in vitro experiments. These results showed that the penetration rate of organic solvents would be enhanced by mixing them with other solvents.

  • PDF

수정 Ramberg-Osgood 모델을 이용한 널말뚝의 관입속도 예측 (Prediction of Penetration Rate of Sheet Pile Using Modified Ramberg-Osgood Model)

  • 이승현;김병일;김주철;김정환
    • 한국지반공학회논문집
    • /
    • 제26권1호
    • /
    • pp.55-62
    • /
    • 2010
  • 진동타입기에 의해 시공되는 강널말뚝의 관입속도를 예측하고자 수정 Ramberg-Osgood 모델을 적용하여 진동타입기의 주기운동에 따른 지반의 동적 저항력을 모사하고자 하였다. 수정 Ramberg-Osgood 모델을 규정짓는 다양한 인자는 현장시험을 통해 구한 동적 지반저항력곡선의 양상을 반영하여 결정하였는데 이때 매개변수로는 표준관입시험값(N값)을 이용하였다. 관입속도는 해석결과가 현장시험결과에 비해 작게 계산되었으며 관입깊이에 따른 관입 소요시간은 해석결과가 현장시험결과에 비해 크게 계산되어 해석결과가 현장시험결과에 비해 보수적인 값을 보여주었다.

암반층에서 Shield TBM의 굴착속도와 추력과의 관계 (Relationship Between Net Penetration Rate and Thrust of Shielded TBM in Hard Rock)

  • 박철환;박찬;전양수;박연준
    • 터널과지하공간
    • /
    • 제12권2호
    • /
    • pp.115-119
    • /
    • 2002
  • 광주도시철도 1호선 건설공사에서 4개의 도심터널은 대구경 쉴드 TBM에 의한 굴착이 계획되었으며, 그 중에 No.1 터널 구간은 13개월 동안 굴착되었다. 본 연구에서는 이 기간동안의 순굴착속도 및 이의 추력과의 관계를 분석하였다. 낮은 심도에 굴착된 536 m 길이의 이 터널은 시 작부에는 토사층이며, 종점부 84 m 구간은 암반층이다. 주간 평균 순굴착속도는 토사층에서 400∼800 mm/hr 였는데 암반층에서 20∼110 mm/hr로 급격히 낮아졌다. 이러한 순굴착속도의 크기는 장비 및 암반의 특성을 고려한 이론적 속도와 비슷한 크기이다. 그리고, 순굴착속도는 추력이 증가할수록 비례하는 것으로 분석된다.

Influence of TBM operational parameters on optimized penetration rate in schistose rocks, a case study: Golab tunnel Lot-1, Iran

  • Eftekhari, A.;Aalianvari, A.;Rostami, J.
    • Computers and Concrete
    • /
    • 제22권2호
    • /
    • pp.239-248
    • /
    • 2018
  • TBM penetration rate is a function of intact rock properties, rock mass conditions and TBM operational parameters. Machine rate of penetrationcan be predicted by knowledge of the ground conditions and its effects on machine performance. The variation of TBM operational parameters such as penetration rate and thrust plays an important role in its performance. This study presents the results of the analysis on the TBM penetration rates in schistose rock types present along the alignment of Golab tunnel based on the analysis of a TBM performance database established for every stroke through different schistose rock types. The results of the analysis are compared to the results of some empirical and theoretical predictive models such as NTH and QTBM. Additional analysis was performed to find the optimum thrust and revolution per minute values for different schistose rock types.

Evaluation of the Wind Power Penetration Limit and Wind Energy Penetration in the Mongolian Central Power System

  • Ulam-Orgil, Ch.;Lee, Hye-Won;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권6호
    • /
    • pp.852-858
    • /
    • 2012
  • This paper describes evaluation results of the wind power penetration limit (WPPL) and the wind energy penetration (WEP) in the Mongolian central power system (MCPS). A wind power plant (WPP) in a power system possesses an output power limit because the power system must maintain a balance between the generation and consumption of electricity at all times in order to achieve an adequate level of quality. The instantaneous penetration limit (IPL) of wind generation at a load is determined as the minimum of the three technical constraints: the minimum output, the ramp rate capability, and the spinning reserve of the conventional generating units. In this paper, a WPPL is defined as the maximum IPL divided by the peak load. A maximal variation rate (VR) of wind power is a major factor in determining the IPL, WPPL, and WEP. This paper analyzes the effects of the maximal VR of wind power on the WPPL, WEP, and capacity factor (CF) in the MCPS. The results indicate that a small VR can facilitate a large amount of wind energy while maintaining a high CF with increased wind power penetration.