• Title/Summary/Keyword: Rapid construction

Search Result 1,237, Processing Time 0.029 seconds

A Study On The Construction Methods In PSC Rail Beams (PSC 궤도빔의 가설공법에 대한 검토)

  • Ahn, Yong-Mo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1293-1299
    • /
    • 2010
  • Daegu urban railroad line 3 is introduced with straddle-type monorail system within the country at the first time. This system is long line with 24km in total length which has not the results of construction in Korea. The rail beam of monorail bridge to be constructed/ installed in the city is adopted on the basis of the PSC rail beam. It is required to apply the steel rail beam at rapid/ curved line parts or location to be required the long span bridge as passing river and intersection. The composition of span bridge is various and the height of bridge is change with each section and exist the different curve radius due to all section is passes in the city. The rail beam shall be considered the ground conditions and then consider the construction methods. It is analyzed to construction period of PSC rail beam to be linked with period of infrastructure construction and construction of steel rail beam, structure construction of station etc. It is compared to crane construction methods and launching girder as alternative construction methods and propose to upper construction methods which is superior in economic and construction.

  • PDF

A Causal Relationship between Metal Material Prices and Construction Cost (금속원자재가격의 변동이 건설공사비에 미치는 영향 분석)

  • Sang, Jun;Byun, Jeong-Yoon;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.137-138
    • /
    • 2012
  • Domestic construction materials market was about 65 trillion won and it occupied 45% level of total construction cost by 2007. In addition, due to the recent rapid rise of crude oil and iron ore price, fluctuation of raw material cost has a great influence to the cost of construction industry. This means that smooth performance is closely related to construction materials. And among them, because of high putting rate of metal materials, it can be seen that the fluctuation of metal material prices is an important variables. So in this study, for the pre-study to analyze the impact of metallic material prices to construction cost, the researcher analyzed a causal relationship between metal material prices and construction cost.

  • PDF

COVID-19's Rapid Digitalization of Construction Education: Built Environment Instructor Experience in Kwazulu-Natal, South Africa.

  • Mall, Ayesha;Haupt, Theodore C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.476-483
    • /
    • 2022
  • The novel coronavirus pandemic has had a significant impact on society and everyday life. The pandemic imposed a global shutdown leading to many challenges such as the suspension of academic programs at universities. The result of this suspension contributed to the rapid overnight migration of educational activities from traditional face-to-face learning to a virtual environment which until then was unfamiliar to both instructors and students. This study identified the experiences faced by built environment higher education instructors in KwaZulu-Natal, South Africa during this sudden switch to online teaching and learning. This pilot study employed a quantitative research approach to survey instructor experiences on online teaching and learning during a global pandemic. The data was computed and analyzed using IBM Statistical Package for Social Sciences (SPSS) version 27. Descriptive statistics were used to analyze the data collected. The study sample comprised of 20 higher education instructors in the region of the KwaZulu Natal province in South Africa. Findings from the study revealed that instructors faced adaptive challenges with rapidly having to redesign and remodel the mode of academic course delivery and assessments to suit an online platform. Additionally, instructors observed that students faced technological challenges such as connectivity and navigating the online learning management system platforms. The challenges identified by instructors and students can be effectively transformed to opportunities for future learning under the 'new normal'.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(II) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(II))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.248-259
    • /
    • 2010
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Engineering Construction With High-Precision Survey Equipment (3D laser scanner, 3D photo scanner, drone) (고정밀 측량장비(3D 레이저 스캐너, 3D 포토 스캐너, 드론)를 활용한 건축 시공단계의 엔지니어링 적용사례)

  • Krchung, Kwang-Ryang;Lee, Byoung-Do;Kim, Tae-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.133-134
    • /
    • 2019
  • As information and construction technology increases, the demand for sophisticated geometric design grows. Design of buildings is becoming more larger, higher, and complicated every day, requiring much new construction technology to bring the design into reality. Nonetheless, the speed of construction technology development is not as rapid. This study concerns the difficulties of realization of sophisticated geometric design. It aims to suggest using BIM and precision survey equipment during the construction stage of the project is a way to resolve. The study will list how to use BIM as an engineering platform incorporating a photo scanner, a scanner drone, and a 3D scanner in the construction stage of projects, how these progressive projects were able to benefit from the high-construction technology.

  • PDF

A Study on the Construction of Educational Database System (교육용 데이터베이스 시스템 구축을 위한 연구)

  • Kho, Dae-Gon;Moon, Gyo-Sik
    • Journal of The Korean Association of Information Education
    • /
    • v.1 no.2
    • /
    • pp.35-44
    • /
    • 1997
  • Rapid progresses on computer and Internet technology fortell the changes in learning environments in our classrooms, which requires a timely preparation for the near future. The construction and utilization of databases that can be used in education, among other things, is the crucial subject which we need to address to. This paper discusses the various aspects of the construction of educational databases and proposes a way for effectively maintaining them.

  • PDF

The Estimating Method of Construction Workable-quantity per Unit Time for Tub Grinder (이동식 임목파쇄기 시공능력 산정 개선방안)

  • Ahn, Bnag Ryul;Tae, Yong Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.169-171
    • /
    • 2012
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity per unit time, the coefficient figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-coefficient table for a Tub Grinder, domestic and overseas documentary records were investigated and on-going construction sites were also visited. The research found that the table can be revised by means of detailing down by several factors. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

  • PDF

Commercial Arbitration and Dispute Management in Construction Project (건설공사의 분쟁관리와 상사중재)

  • 이태식;이동욱;김영현
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.489-517
    • /
    • 2004
  • The resolution of the 1993 Uruguay Round and the opening of Korea's construction market in '97 marked the beginning of the globalization of Korea's domestic construction market. Consequently, the process led to changes in contracting procedures, as well as disputes in construction management. With globalization came a rapid realization of reasonable values, which forced the hierarchical vertical relationship between the owners, constructors, and subcontractors into a more equal, horizontal relationship. Once the hierarchical relationship was altered, the late 1990's witnessed a dramatic increase in managerial disagreements, in addition to escalating legal disputes and expenditures. The horizontal relationship was a new concept and brought forth many complexities. Unfortunately, because all of this was new, management of construction disputes was elementary at best. Anticipation of disputes is the key to effective dispute management. This includes thorough reviews of contract documents, document management, construction records, and checklists. Also necessary is the education of owners and contractors with pertinent knowledge concerning dispute management. The following paper focuses on the importance of observing construction disputes in order to facilitate management thereof.

  • PDF

An Analysis of Classification and Causes for Construction Waste of Apartment Building Projects (공동주택 건축공사의 공종별 폐기물의 종류와 발생원인 분석)

  • Seo, Jong-Min;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.5
    • /
    • pp.127-133
    • /
    • 2007
  • Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF