• 제목/요약/키워드: Railway track maintenance

Search Result 323, Processing Time 0.027 seconds

The Dynamic Interactive Analysis of track and train system with Roadbed Displacement in Subgrade Concrete Slabtrack

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Youn-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.379-386
    • /
    • 2007
  • Recently the concrete slab tracks are being constructed on roadbed in the Kyong-bu 2nd stage high speed railways. In responding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides the design standards and the maintenance system. The proposed standards and the maintenance system are based on the track theory and the track-train interaction program developed, where the roadbed displacement and train speed are utilized as mediating variables. In the analysis, the dynamic response of track-train interaction apply to various speeds and displacements. the roadbed displacement is shown in a sine curve, the scope of the displacement occurrence, presented in its wavelenths, include 6meters, 10meters, 15meters, 20meters, 30meters. the train speeds involved are 50,100, 150,200,250,300,350,400 kilometers per hour.

  • PDF

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

Investigation of Thermal Stress of Continuous Welded Rail on High Speed Railway Bridge (경부고속철도 교량상 장대레일의 온도응력 계측 실험)

  • Kang, Jae-Yoon;Choi, Eun-Suk;Chin, Won-Jong;Lee, Jung-Woo;Kwark, Jong-Won;Kim, Byung-Suk
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.458-461
    • /
    • 2007
  • Recently, the continuous welded rail(CWR) track has been used for less maintenance of the High-speed railway tracks. In case of CWR track, track buckling has always been an unpredictable event under the high compressive stress in rail. The behavior and stress state of CWR track is manily influenced by its thermal variations, and it is important to understand seasonal variations of rail temperature and stress to predict the track stability. This paper describes the in-site measurement for the rail temperature and rail stress, and the correlation between the rail temperature and stress was examined.

  • PDF

Field Test to Investigate the Thermal Stress of Continuous Welded Rail on High Speed Railway Bridges in Summer Period (고속철도 교량상 장대레일의 하절기 온도응력 계측)

  • Kwark, Jong-Won;Choi, Eun-Suk;Chin, Won-Jong;Lee, Jung-Woo;Kim, Byung-Suk;Kang, Jae-Yoon
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.131-136
    • /
    • 2006
  • Most modern railways, especially the high speed railway tracks, use continuous welded rail(CWR) for the less maintenance. For the CWR track has very few expansion joints, track buckling has always been an unpredictable event and it happens mainly by high compressive stress in rail in summer period. Therefore, it is important to understand the variation of rail stress induced by thermal loads which has direct influence on the rail buckling and stability of railway track. This paper describes the experimental investigation of the variation of rail temperature and stress in a high speed railway track on bridge structure. Field measurement was performed to examine the correlation between the rail temperature and rail stress on the Korean High Speed Railway line. Regression functions were derived from measured data to determine the rail stress f3r an arbitrary rail temperature varies from 20 to 50 degree Celsius.

The Use of Bituminous Subballast on Future High-Speed Lines in Spain: Structural Design and Economical Impact

  • Teixeira, P.F.;Ferreira, P.A.;Pita, A. Lopez;Casas, C.;Bachiller, A.
    • International Journal of Railway
    • /
    • v.2 no.1
    • /
    • pp.1-7
    • /
    • 2009
  • The development of structural solutions for high-speed or very high-speed tracks that minimize total life cycle costs of the system is a key issue to improve the operational profitability of new investments. In opposition to conventional ballasted tracks, slab track solutions can be a cost-effective solution, but only in the cases where the benefits due to the increase in track availability and the reduction of track maintenance offsets its much higher construction costs. In the cases where such investment is not feasible, it is worth to evaluate possible structural improvements to ballasted track that allow reducing its maintenance needs without increasing too much its construction costs. This paper evaluates the design requirements and the impact of improving conventional high-speed ballasted tracks by using a bituminous subballast layer. It is divided into two main parts: first the design requirements of the structural solutions with bituminous subballast and its possible benefits on high-speed track deterioration, and secondly the evaluation of the economic impact, in terms of construction costs, of using this structural solution material in future Spanish high-speed lines.

  • PDF

Development of Automatic Crack Detection using the Gabor Filter for Concrete Structures of Railway Tracks (가버 필터를 사용한 철도 콘크리트 궤도 도상의 자동 균열 감지 개발)

  • Na, Yong-Hyoun;Park, Mi-Yun;Park, Ji-Soo;Park, Sung-Baek;Kwon, Se-Gon
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.458-465
    • /
    • 2018
  • Purpose: Concrete track that affects on railway safety can detect cracks using image processing technique. However, since a condition of concrete track and surface noisy are obstructed to detect cracks, there is a need for a way to remove them effectively. Method: In this study, we proposed an image processing to detect cracks effectively for Korean railway and verified its performance through experiment. We developed image acquisition system for capture a railway concrete track and acquired railway concrete track images, randomly selected 2000 images and detected cracks in the image process using proposed Gabor Filter Bank methods. Results: As a result, 94% of detection rate are matched to the actual cracks in same quality and format railway concrete track image. Conclution: The crack detection method using Garbor Filter Bank was confirmed to be effective for crack image including noise in the Korean railway concrete track. This system is expected to become an automated maintenance system in the existing human-centered railway industry.

Effects of H-type Sleeper on the Track Behavior (궤도거동에 대한 H형 침목의 영향)

  • Yun, Kyung-Min;Seo, Dong-Seok;Kim, Hae-Gon;Hwang, Kwang-Ha;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4185-4191
    • /
    • 2015
  • The demand for improved rail transportation safety is growing due to the increased speeds of current railways. In addition, freight trains with heavier axle loads are required to run on conventional railways. In order to meet these requirements, increased rail weights and the application of a CWR system have been introduced on conventional railways. The H type sleeper, which has higher lateral resistance than the existing mono sleepers, has been recently developed to increase track stiffness and reduce track irregularities. In this paper, the effects of a H-type sleeper on track behavior were investigated by 3-Dimensional F.E. analysis.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

An applicable RCM method for Track circuit equipment of AREX's Signalling System (공항철도 궤도회로장치에 대한 RCM 적용 방안)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Park, Seung-Keun
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1126-1131
    • /
    • 2008
  • In this paper we introduce an applicable RCM(Reliability centered maintenance) method for Track circuit equipment of AREX's Signalling System. AREX computerize all the process of FRACAS(Failure Reporting, Analysis and Corrective Action System)) by the Facility Management System of Integrated Information System. These datum were analysed and reproduced as the RAMS index value which can be used by maintenance staff for optimizing the maintenance method of the System.

  • PDF

Track-Structure Interaction Analysis of Fast Hardening Track on Railway Bridge Considering Effect of Anchor and Friction (앵커와 마찰의 영향을 고려한 교량상 급속경화궤도의 궤도-교량 상호작용해석)

  • Cho, Sang-Hyeon;Lee, Il-Wha;Chung, Won-Seok;Lee, Hee-Young;Lee, Kyoung-Chan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.1
    • /
    • pp.53-61
    • /
    • 2018
  • Ballast track requires constant maintenance work due to progress of track irregularity. Fast Hardening Track(FHT) has been developed to reduce the maintenance effort done by injecting fast hardening mortar in aged ballast to convert slab track. For the application of FHT to a railway bridge, post-installed anchors should be placed at center of the track segment to fix it on bridge. This paper presents track-bridge interaction analysis results with FHT considering stiffness and strength of post-installed anchor, age of FHT concrete and friction between FHT and bridge deck surface. Based on the analysis results, this study suggests when is good to install the anchors and allow normal operation of passing train.