• Title/Summary/Keyword: Railway signal system

Search Result 342, Processing Time 0.031 seconds

The Corridor Development of Eurasia High-Speed Railway Network (유라시아 고속철도의 Corridor 개발에 관한 연구)

  • Lee Yong-Jae
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.461-471
    • /
    • 2004
  • The primary objective of this paper is to investigate the corridor of Eurasia High-Speed Railway Network from the governmental view of the Republic of Korea, whose High-Speed Train has been recently operated. The country is also expected to figure out the changes of Eurasia infrastructure system under the assumption that Trans-Korean Railway is connected to the Continent. As a result of research, the corridor connecting the TKR to TSR seems to be more attractive to the Republic of Korea than that of the TKR-TCR under the current economic and operational environments. However, even in a case, the railway linkage through the TSR between Europe and Asia should remain a supplementary means of the sea transportation route. Lastly, TSR may need a program of structural reforms, in order to continuously provide preferable services like the Pan-European Transport Network (PETN) which is currently initiated by the European Union, such as to improve outdated infrastructure (railway, bridges, signal systems, etc.), to simplify and to standardize the process of custom clearance and internal tariffs, and ultimately to construct a uniform management system for the corridor linking the TKR to TSR.

  • PDF

The Management Schema of Urban Transit Infrastructure for Standardization (도시철도시설 표준화를 위한 관리체계 연구)

  • Lee, Woo-Dong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1824-1826
    • /
    • 2007
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

A Study on the Hazard Identification and Risk Mitigation for ATSRX Using Hazard and Operability Study (HAZOP Study를 사용한 ATSRX의 위험원도출 및 리스크 완화에 관한 연구)

  • LEE Jun-Ho;LEE Kang-Mi;KIM Yong-Kyu;SHIN Ducko
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.533-538
    • /
    • 2005
  • In this paper we identity the hazard using HAZOP study for ATSRX which is a subsystem of the ATP system, and we study a safety management method for the mitigation of the risk to the acceptable level. ATSRX is a device that make a train which has a ATP system operate in ATS line. For this ATSRX send a induction signal with ATS system to vehicle controller. Thus ATSRX can be said a safety equipment that makes a train operate safely. In order to identify the hazard for the internal faults in ATSRX system, we employ HAZOP study method which is recommended as hazard identification in IEC 62278, RAMS requirements in railway signal, and also it provide the detail activity in IEC 61882. Thus, in this paper we perform HAZOP study based on ATSRX related standards and using the assessment of the identified hazard we study a method to guarantee the system safety through the change of the design to mitigate the risk to the acceptable level.

A Study on the Distance Between the Track Circuits Using Identical Frequency in Railway Track Circuit System (철도궤도회로시스템에서 동일한 주파수를 사용하는 궤도회로 사이의 이격거리에 대한 연구)

  • Kim, Min-Seok;Lee, Jong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2168-2174
    • /
    • 2009
  • Electrical railway system consists of rolling stock, track, signal and streetcar line system. Track circuit system is a vital system due to checking the location of trains. Track circuits are divided by using frequency and isolated electrically. Currently, there is not a regulation for the distance between track circuits using identical frequency. In case of installing additional track circuits in large stations or marshalling yard, the problem which is that the signal is not exactly transmitted to the track circuit occurs due to the mutual interference. In other words, the track circuit properly is not operated on account of wrong induction current by the mutual inductance between track circuits. In this paper, we suggest the electrical model between track circuits and numerically calculate demanded parameters in electrical model. The distance between track circuits satisfying the mutual inductance which does not happen to the mutual interference phenomenon is presented about the distance of track circuit. It is proved by using Matlab and PSpice program as the amplitude of mutual induced current.

Development of Risk-Appearance Frequency Evaluation Model for Railway Level-Crossing Accidents (철도건널목 사고 위험도-발생빈도 평가모델 개발)

  • Kim, Min-Su;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.96-101
    • /
    • 2009
  • In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.

Metro LED Type Signal Test of a Patented Article Manufacture.Establishment.Examination Report (도시철도 LED형 신호기 특허 시제품 제작.설치.시험에 관한 보고)

  • Seok, Tae-Woo;Park, Jong-Seon;Ko, Yang-Ok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.885-889
    • /
    • 2006
  • Metro Subway System is widely known as the leader of public transportation in a metropolitan area. The signal interlocking is one of the most important organs that plays a major role in the system. By improving the quality of signal lights on the traffic system and keeping its maintenance on a high level will not only repair the current state, but it will also let the LED type signal semi-permanent. The device, which underwent a process of fine manufacture establishment and a close examination, obtained a patented article (2004, as a new device). Utilizing the equipment with cautious preservation on the system will enhance the current state of the signal device. Especially, the test for improvement and development based upon the technique that decreases the frequency of defect produced will further precipitate its efficiency. With authorization of imposing the LED lights on production, installment, and investigation of the system, the newly made equipment will bring improvement to the signal technology and to the industry at largest extent.

  • PDF

The Analysis of Railway signal using DSP (DSP를 사용한 열차 신호 분석)

  • 김기승;김치조;임관수;조용기
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.194-201
    • /
    • 1998
  • It is extremely necessary to use such a secure way to transmit information to a train, which is needed for operating a train. In our system, The information including the allowable velocity of the train, train existence in current area, and other data necessary for operating train, is transmitted in the form of FM signal. Received by the receiver located on train, the signal is filtered, demodulated and analyzed to extract the original information. The analysis of the demodulated signal is done through FFT algorithm using sliding slot. These all are processed digitally by hardware which is implemented by 32bit DSP. The experiments show the validity of the algorithm we presented.

  • PDF

The study of data interface for train onboard signal control system (차상신호시스템의 정보인터페이스에 관한 연구)

  • Kim You-Ho;Lee Hoon-Koo;Lee Soo-Hwan;Kim Young Kyu;Baek Jong-Hyen
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1240-1246
    • /
    • 2004
  • Research for Tilting Vehicle is in progress as a plan follows in speed improvement of the existing railroad. According to this, Onboard Signal Control System is considered for introduction of new technology on Onboard equipment of railroad signal system and control system. Onboard Signal Control System operates the train by using of information that received from the ground. Examine the connection algorithm between kind of equipment and each equipment which will be installed for the On board Signal Control System. And examined about information interface and kind of information.

  • PDF

Fuzzy-AHP Estimation Technique for Korea High Speed Railway Safety Management (F-AHP 평가수법을 적용한 고속전철 안전성의 평가)

  • Park Tae-Keun;Park Choon-Soo;Seo Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.328-333
    • /
    • 2004
  • Railway is huge traffic system which is operated organically combining all the elements; vehicle, track, electric power, signal/communication, operation, etc. Safety level has ben improved steadily by learning lessons from past accident. But with rapid progress in high-speed, massive, high-frequency transit fresh idea of accident prevention is now in order. In quest of effective and efficient countermeasure, we aim to establish an adequate safety evaluation/management method. Our proposals are basic concept relating to safety analysis of fatal accidents, AHP of Saaty, Fuzzy AHP.

  • PDF

Fuzzy-AHP Estimation Technique for Korea High Speed Railway Safety Management (F-AHP평가수법을 적용한 고속전철 안전성의 평가)

  • 박태근;박춘수;서승일
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.192-198
    • /
    • 2003
  • Railway is huge traffic system which is operated organically combining all the elements; vehicle, track, electric power, signal/communication, operation, etc. Safety level has been improved steadily by learning lessons from past accident. But with rapid progress in high-speed, massive, high-frequency transit fresh idea of accident prevention is now in order. In quest of effective and efficient countermeasure, we aim to establish an adequate safety evaluation/management method. Our proposals are basic concept relating to safety analysis of fatal accidents, AHP of Saaty, Fuzzy AHP.

  • PDF