• 제목/요약/키워드: Railway route

검색결과 230건 처리시간 0.025초

KTX 운행에 따른 가선설비 유리애자의 진동특성과 파손 가능성 검증 (The Verification of Breakage Possibility and Vibration Properties of Glass Insulators by the High-speed Railway Service)

  • 김영석;송길목;정진수;전용주
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.566-572
    • /
    • 2009
  • This paper has studied breakage possibility of glass insulators by resonance and accelerated deterioration through the comparison of the natural vibration and on site vibration. The natural frequencies of the strut tube glass insulator was measured within a range of less than 1kHz. In the on site vibration, the largest frequency that was imposed on strut tube glass insulators was 80Hz with 1.13g of vertical vibration in the viaduct section, the largest vertical vibration (0.38g) was detected at 103Hz in the open route section. When site vibration and natural vibration of strut tube glass insulators were compared in terms of characteristics, the resonance frequency was not the same. In both the viaduct and open route sections, it seems that the impact by vertical vibration in strut tube glass insulators is large. It's very unlikely that glass insulators were damaged by fatigue accumulation of vibration since the possibility of damage by resonance was very low in consideration of the characteristics of natural vibration and site vibration of glass insulators. In addition, no damage was detected in the accelerated deterioration test.

고속철도 유리애자 파손원인을 위한 현장 진동 연구 (A Study on Field Vibration for Fault Cause Analysis of Glass Insulator on High-speed Railway)

  • 김영석;송길목;방선배;김선구;류영태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 Techno-Fair 및 합동춘계학술대회 논문집 전기물성,응용부문
    • /
    • pp.189-190
    • /
    • 2008
  • This study was investigated a possibility of fault of glass insulator due to vibration on high-speed railway. The proper vibration of 1-glass insulator have many frequency band and high amplitude showed in high frequency than low frequency. The proper vibration of strut tube insulator was lowest 170Hz, highest 1.5kHz. The field signal amplitude of viaduct and open route were biggest moment pantograph of high-speed rail. The surface vibration(V3) amplitude of strut tube insulator was biggest. From the FFT analysis of viaduct and open route, the strut tube insulator effect by vertical vibration was big, the frequency was 82.5Hz and 105Hz, respectively. However, in comparison with the proper vibration of strut tube insulator, the resonance was not observed. Although the amplitude of insulator is high, the possibility of fault is low because the glass insulator deterioration by the accumulation of vibration do not happen.

  • PDF

무선통신 기반 열차제어시스템에서의 열차운행 표시 및 제어기법 (Train Operation Display and Control Techniques for Communication Based Train Control System)

  • 최규형
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제53권9호
    • /
    • pp.545-551
    • /
    • 2004
  • CBTC(Communication Based Train Control) System can improve train operation efficiency by realizing moving block system which makes a continuous train interval control in accordance with the position and speed of train. Adopting radio transmission to make a continuous detection of train position and transmit the control data from the ground to a train, CBTC needs dedicated train operation and control algorithm which should be quite different from the conventional track-circuit-based train control system. This paper provides a train operation display and control algorithm for CBTC system in making train interval control, train route control and train supervision. Signalling pattern diagram is devised to analyze the train interval control mechanism of moving block system, and interlocking logic is devised to represent the train route control mechanism of moving block system. For train supervision, train occupation status on railway are displayed by using the segment which virtually divide the whole railway. The proposed method has been successfully applied to the development of CBTC system for the standardized AGT(automatic guided transit) which is under construction now in Korea, and also can be applied to any other CBTC system.

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • 제5권3호
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

철도곡선부 속도향상을 위한 선형개량요소 결정 (Determination of Route alignment improvement parameter for Speed up in Railway curve sections)

  • 조규전;이남수;정의환
    • 한국측량학회지
    • /
    • 제13권2호
    • /
    • pp.209-218
    • /
    • 1995
  • 철도속도향상 계획은 미래에 있어 풍요로운 사회를 실현시키는데 중요한 역할을 담당하게 될 것이다. 열차 운행속도에 매우 큰 영향을 주는 선형 요소는 곡선구간으로서 이 구간에서는 열차의 주행성과 승객의 승차기분을 저해하는 요인을 줄이기 위해 완화곡선구간을 포함한 곡선부에 캔트 및 슬랙을 설치하게 되는데 이러한 값들은 열차의 종류가 다르기 때문에 균형적인 값을 사용하지 못하고 어느 정도 부족한 상태로서 유지되고 있다. 본 연구에서는 곡선반경별로 설정캔트량을 조사하여 부족캔트량에 대한 횡가속도를 산출하여 곡선부에서의 주행성을 검토하여 효과적인 곡선관리 방법을 제시하였으며 선형개량요소를 적용하여 속도향상 효과를 얻었다.

  • PDF

경부선 우회선로 구축을 통한 철도화물운송 효율화 방안 연구 (A study on railway logistic transportation efficiency through constructing roundabout route of the Kyung-Bu railroad)

  • 김종태;추준섭;문대섭;유재균;이준;오석문
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.657-665
    • /
    • 2008
  • The main transportation mode of long distance inter-city passenger trips is high-speed rail and the modal share of transportation has been changed profoundly since the KTX service has been started in the Kyung-Bu railroad transportation corridor in the day of 1 April, 2004. After an opening of KTX service in the second stage Kyung-Bu and Ho-Nam railroad transportation corridors, a capacity of incumbent railroads will be increased and operational environments of freight train will be improved. The purpose of this paper is to examine the impact of KTX service operation on the national logistics thoroughly. This paper establishes a deceptive scheme in the national railroad logistic transportation and a route operational strategy between the main origins and destinations efficiently considering the changes of the current freight transportation system in the future. We expect to achieve efficiency of logistic transportation in this paper through alternative routes for example Ho-Nam, Chang-Hang, Seo-Hae line.

  • PDF

지방간선노선의 철도이용과 활성화 방안 -대구.장항선을 중심으로- (A Study on Utilization Plans of Regional trunk rail route -Focused on the Daegu.janghang Line-)

  • 양준규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.496-504
    • /
    • 2011
  • The region trunk line railroad route undergoes an influence on a large scale in train operation systematic reorganization. This keynote of the train operation not being to the consumer and not to be is because being to the supplier. The trunk line route user of region supply change of the supplier sensitively, accepts but, the demand unit will be able to change the supply massive demanders does not become and like that to accept this back is not the railroad the mean of transportation which grudge is different a mean of transportation mainly makes use. This hits to neither the gist of GLORY promotions of the railroad public corporation which pursues the railroad use which is ordinary even in the basis of governmental policy of stock of coal small green growth and not to be is arranged. For the railroad use activation of the region trunk line route consequently and to excavate the demand hindrance element and a demand lure element the inside and the outside defines and to observe the fluctuation of use importing in existing train operation systematic fluctuation, with the user tries analyzes the instance of the overseas railroad enterprise about the process which reflects the opinion of the area and improvement under preparing boil.

  • PDF

설계의 경제성 분석을 통한 최적노선 선정방안 연구 - OO경전철 민간투자사업 사례연구 - (The Study for Selection of the Optimum Route by Economic Analyses)

  • 권석현;서성한;이동우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.128-138
    • /
    • 2008
  • VE of the scripture season enterprises and it respected LCC analyzes from the research which it sees and to use AHP techniques and definite LCC techniques and probabilistic LCC techniques selects the optimum route the case study which it executed. It presented the quality rating model in about the resultant most route lascivious at the time of VE evaluation, in order to select the alternative of optimum AHP techniques which are one in decision-making technique and an evaluation item by weight and a grade it applied the mountaintop it did. Also the definite LCC analyzer law departments of existing together it applied the probabilistic LCC techniques which use Monte Carlo Simulation in about analytical prices and reliability height boil. The economical efficiency was excellent with VE/LCC analytical resultant route and facility size abridgment, the rivers most it will be able to minimize an environmental effect with short distance traverse, the selection this hit preparation LCC which separates from the land use side decreased, the value (V) above 22.0% with the fact that it improves. And, the reliability of the probabilistic LCC analytical resultant analytical results in compliance with Monte Carlo Simulation with 90.3% was very analyzed with the fact that it is a high level.

  • PDF

금강산(내금강) 관광을 위한 남북연결 교통망에 관한 연구 (Restoration of The Transportation Network between North and South Korea for Mt. Geumgang Tourism)

  • 홍길종;배선학
    • 한국지리정보학회지
    • /
    • 제22권3호
    • /
    • pp.51-64
    • /
    • 2019
  • 금강산은 조선 시대 이전부터 한반도를 대표하는 명승지였으며, 남북 분단 이후에는 개성공단과 함께 남북교류의 상징이 되었다. 금강산 관광코스는 크게 내금강과 외금강으로 구분되는데, 조선시대와 일제 강점기의 금강산 관광 경로는 서울에서 가까운 내금강으로 진입하여 외금강을 거쳐 동해로 빠져나가는 것이 일반적이었다. 그러나 현대아산에서 운영한 금강산 관광코스는, 북한이 외금강 위주로 개방함으로 인하여, 고성에서 외금강으로 접근하는 관광 경로가 활용되었다. 북한은 금강산 관광코스 중 일부만 현대아산에 개방하였지만, 향후 금강산 관광이 재개된다면 2007년 내금강 일부 구간 개방과 같이 금강산 관광 지역을 추가로 개방할 가능성이 크다. 이 경우 남한에서 내금강으로 접근할 수 있는 추가적인 교통망 연결이 필요하다. 최적의 대안은 금강산철도 구간의 복원이었지만, 임남댐의 건설로 인하여 금강산철도 구간의 복원이 불가능하게 된 현실을 고려할 때, 양구와 금강읍을 연결하던 국도31호선을 복원하는 것이 가장 현실적인 대안이다. GIS를 이용한 내금강 연결도로 분석 결과, 기존 국도31호선, 국도31호선과 인접하여 양구 두타연에서 문등리를 통과하는 노선, 인제에서 출발하여 국도31호선으로 합류하는 노선 등 모두 3개의 노선이 확인되었다. 이들 노선 중 도로 길이, 지형특성, 군사시설배치 등을 고려할 때 두타연-문등리-금강읍 구간이 남한에서 내금강으로 연결할 수 있는 현실적인 대안이 될 수 있다.

건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구- (A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection-)

  • 손진현;차철
    • 한국산업융합학회 논문집
    • /
    • 제10권4호
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF